Project overview
Veena Velocity Ph-Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000014147. Veena Velocity Ph-Ii is located at Vasai-West. This is a On-Going Project being developed by Nikunj Developers.
Veena Velocity Ph-Ii has 1 BHK Apartments with carpet areas ranging from 355 to 391 Sq.ft. Carpet. The Project has total 181 of which 51 are currently available for sale.
Veena Velocity Ph-Ii is being developed on a total land area of 36867 Sq.ft. Veena Velocity Ph-Ii has 5 Wings / Towers Wing - A,Wing - B,Wing - C,Wing - D,Wing - E
| Project | Developer | Location | Possession |
-
Project:
Veena Velocity Ph-Ii
-
Location:
-
Vasai-West
-
Const. Stage:
On-Going Project
-
Possession:
31 Dec 2017
-
Developer:
Nikunj Developers
-
Phone:
-
Address:
-
Shop No 2, Nikunj Signature, Manav Mandir Complex, Ambadi Road, Vasai, 401202
| MAHA REARA No: |
P99000014147 |
| Project Type |
Others |
| RERA Project Status |
On-Going Project |
| Architect |
Kaushik Patel |
| Funding Bank |
RBL Bank |
| Proposed Possession |
31 Dec 2017 |
| Revised Possession |
31 Mar 2019 |
| Extended Possession |
30 Sep 2020 |
| Litigations |
No Litigations |
| Last Modified |
04 Jan 2022 |
| Last Retrived |
28 Jul 2025 |
Veena Velocity Ph-Ii QR Code
Veena Velocity Ph-Ii
MahaRERA - P99000014147
| Type | Area |
| 2 BHK | 54.94 Sq.mts. ( 591 Sq.ft. ) |
| 2 BHK | 55.93 Sq.mts. ( 602 Sq.ft. ) |
| SHOP | 10.93 Sq.mts. ( 118 Sq.ft. ) |
| SHOP | 12.23 Sq.mts. ( 132 Sq.ft. ) |
| SHOP | 12.89 Sq.mts. ( 139 Sq.ft. ) |
| 1 BHK | 32.74 Sq.mts. ( 352 Sq.ft. ) |
| 1 BHK | 33.34 Sq.mts. ( 359 Sq.ft. ) |
| 1 BHK | 36.9 Sq.mts. ( 397 Sq.ft. ) |
| 1 BHK | 37.19 Sq.mts. ( 400 Sq.ft. ) |
| 1 BHK | 37.71 Sq.mts. ( 406 Sq.ft. ) |
| Shop | 11.58 Sq.mts. ( 125 Sq.ft. ) |
| 1 BHK | 32.98 Sq.mts. ( 355 Sq.ft. ) |
| 1 BHK | 35.15 Sq.mts. ( 378 Sq.ft. ) |
| 1 BHK | 36.15 Sq.mts. ( 389 Sq.ft. ) |
| 1 BHK | 36.3 Sq.mts. ( 391 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Veena Velocity Ph-Iilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Na |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station50% completed
|
|
- |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements100% completed
|
|
- |
Landscaping & Tree Planting50% completed
|
|
- |
|
|
|
- |
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
|
|
- |
Solid Waste Management And Disposal50% completed
|
|
- |
Storm Water Drains50% completed
|
|
- |
|
|
|
- |
Treatment And Disposal Of Sewage And Sullage Water50% completed
|
|
- |
Water Conservation, Rain water Harvesting
|
|
- |
Water Supply50% completed
|
|
- |
Buildings / Wings in Veena Velocity Ph-Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Veena Velocity Ph-Ii by Nikunj Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
181
apartments in total
Saleable Area Statistics (Sq. ft.)
80005
Total
Total 181 apartments in project. 130 apartments booked. 71% apartments booked.
Total 80005 Sq.ft. saleable area. 62248 saleable area booked.
78% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - A | Mar 2019 | 8 | 1 | 0 | 1 | 0 | 12 | 7 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 54.94 Sq.mts. ( 591 Sq.ft. ) | 26 | |
| 2 BHK | 55.93 Sq.mts. ( 602 Sq.ft. ) | 2 | |
| SHOP | 10.93 Sq.mts. ( 118 Sq.ft. ) | 2 | |
| SHOP | 12.23 Sq.mts. ( 132 Sq.ft. ) | 2 | |
| SHOP | 12.89 Sq.mts. ( 139 Sq.ft. ) | 4 | |
36 total apartments / 21 apartments booked. 58% apartments booked. |
| Work Description in Building Wing - A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - B | Mar 2019 | 8 | 1 | 0 | 1 | 0 | 12 | 7 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 54.94 Sq.mts. ( 591 Sq.ft. ) | 26 | |
| 2 BHK | 55.93 Sq.mts. ( 602 Sq.ft. ) | 2 | |
| Shop | 10.93 Sq.mts. ( 118 Sq.ft. ) | 2 | |
| Shop | 12.23 Sq.mts. ( 132 Sq.ft. ) | 2 | |
| Shop | 12.89 Sq.mts. ( 139 Sq.ft. ) | 4 | |
36 total apartments / 19 apartments booked. 52% apartments booked. |
| Work Description in Building Wing - B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - C | Mar 2019 | 8 | 1 | 0 | 1 | 0 | 12 | 7 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 54.94 Sq.mts. ( 591 Sq.ft. ) | 26 | |
| 2 BHK | 55.93 Sq.mts. ( 602 Sq.ft. ) | 2 | |
| SHOP | 10.93 Sq.mts. ( 118 Sq.ft. ) | 2 | |
| SHOP | 12.23 Sq.mts. ( 132 Sq.ft. ) | 2 | |
| SHOP | 12.89 Sq.mts. ( 139 Sq.ft. ) | 4 | |
36 total apartments / 20 apartments booked. 55% apartments booked. |
| Work Description in Building Wing - C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - D | Mar 2019 | 8 | 1 | 0 | 1 | 0 | 12 | 14 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.74 Sq.mts. ( 352 Sq.ft. ) | 7 | |
| 1 BHK | 33.34 Sq.mts. ( 359 Sq.ft. ) | 7 | |
| 1 BHK | 36.9 Sq.mts. ( 397 Sq.ft. ) | 20 | |
| 1 BHK | 37.19 Sq.mts. ( 400 Sq.ft. ) | 7 | |
| 1 BHK | 37.71 Sq.mts. ( 406 Sq.ft. ) | 1 | |
| Shop | 10.93 Sq.mts. ( 118 Sq.ft. ) | 1 | |
| Shop | 11.58 Sq.mts. ( 125 Sq.ft. ) | 1 | |
| Shop | 12.89 Sq.mts. ( 139 Sq.ft. ) | 1 | |
45 total apartments / 42 apartments booked. 93% apartments booked. |
| Work Description in Building Wing - D | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing - E | Mar 2019 | 8 | 1 | 0 | 1 | 0 | 11 | 11 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 32.98 Sq.mts. ( 355 Sq.ft. ) | 7 | |
| 1 BHK | 35.15 Sq.mts. ( 378 Sq.ft. ) | 7 | |
| 1 BHK | 36.15 Sq.mts. ( 389 Sq.ft. ) | 7 | |
| 1 BHK | 36.3 Sq.mts. ( 391 Sq.ft. ) | 7 | |
28 total apartments / 28 apartments booked. 100% apartments booked. |
| Work Description in Building Wing - E | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Nikunj Developers
for Project
Veena Velocity Ph-Ii
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |