Project overview

Veena Serenity is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000016. Veena Serenity is located at 58-Pt. This is a Ongoing being developed by Veena Realcon Private Limited.

Veena Serenity has 2 BHK Apartments with carpet areas ranging from 572 to 572 Sq.ft. Carpet. The Project has total 288 of which 35 are currently available for sale.

Veena Serenity is being developed on a total land area of 33016 Sq.ft. Veena Serenity has 5 Wings / Towers Wing A,Wing B,Wing C,Wing D,Wing E

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Veena Serenity
  • Location:
  • 58-Pt
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2021
Developer Details

  • Developer:
    Veena Realcon Private Limited
  • Phone:
  • Address:
  • Veena Sarang Complex
Project RERA Details
MAHA REARA No: P51800000016
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Jitendra G Dewoolkar
Funding Bank RBL Bank Limited
Proposed Possession 01 Dec 2021
Revised Possession 01 Dec 2021
Extended Possession
Litigations No Litigations
Last Modified 05 Jun 2017
Last Retrived 26 Jul 2025
Veena Serenity QR Code
Veena Serenity
MahaRERA - P51800000016
Apartment Details & Configuration
TypeArea
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )
1 BHK39.83 Sq.mts. ( 429 Sq.ft. )
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )
2 BHK58.63 Sq.mts. ( 631 Sq.ft. )
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )
2 BHK53.11 Sq.mts. ( 572 Sq.ft. )
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Veena Serenitylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station50% completed
50% Complete
By Developer
Energy management
Na
Fire Protection And Fire Safety Requirements75% completed
75% Complete
By Developer
Landscaping & Tree Planting
By Developer
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)35% completed
35% Complete
By Developer
Solid Waste Management And Disposal
By Developer
Storm Water Drains45% completed
45% Complete
By Bmc
Street Lighting25% completed
25% Complete
By Bmc
Treatment And Disposal Of Sewage And Sullage Water
By Developer
Water Conservation, Rain water Harvesting
By Developer
Water Supply50% completed
50% Complete
By Bmc
Buildings / Wings in Veena Serenity
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Veena Serenity by Veena Realcon Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

33016 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

288 apartments in total
Total
288
Booked
253
Available
35

Saleable Area Statistics (Sq. ft.)

169514 Total
Total
169514
Booked
145340
Available
24174
Total 288 apartments in project. 253 apartments booked. 87% apartments booked.
Total 169514 Sq.ft. saleable area. 145340 saleable area booked.
86% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJan 2020161100066
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )42
36 Booked85% Booked
85% Booked
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )14
9 Booked64% Booked
64% Booked
56 total apartments / 45 apartments booked. 80% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress75% done
75% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress75% done
75% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJan 2020161100029
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK39.83 Sq.mts. ( 429 Sq.ft. )43
43 Booked100% Booked
100% Booked
2 BHK53.8 Sq.mts. ( 579 Sq.ft. )15
14 Booked93% Booked
93% Booked
58 total apartments / 57 apartments booked. 98% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress60% done
60% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress25% done
25% Booked
Sanitary Fittings within the flats / premises
work-in-progress25% done
25% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress25% done
25% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CJan 1900161100057
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK58.63 Sq.mts. ( 631 Sq.ft. )15
10 Booked66% Booked
66% Booked
2 BHK58.64 Sq.mts. ( 631 Sq.ft. )27
21 Booked77% Booked
77% Booked
3 BHK72.6 Sq.mts. ( 781 Sq.ft. )14
4 Booked28% Booked
28% Booked
56 total apartments / 35 apartments booked. 62% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress35% done
35% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress25% done
25% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress25% done
25% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress35% done
35% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress35% done
35% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress35% done
35% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing DJan 2020161100032
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK53.11 Sq.mts. ( 572 Sq.ft. )14
13 Booked92% Booked
92% Booked
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )30
30 Booked100% Booked
100% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Wing DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress88% done
88% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing EJan 2020161100028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK53.1 Sq.mts. ( 572 Sq.ft. )29
28 Booked96% Booked
96% Booked
2 BHK53.17 Sq.mts. ( 572 Sq.ft. )30
30 Booked100% Booked
100% Booked
59 total apartments / 58 apartments booked. 98% apartments booked.
Work Description in Building Wing ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress85% done
85% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Veena Realcon Private Limited
for Project
Veena Serenity
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation