Project overview

Vardhaman Vatika Phase 3 Building No 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700051332. Vardhaman Vatika Phase 3 Building No 4 is located at 284. This is a New being developed by Vardhaman Venture.

Vardhaman Vatika Phase 3 Building No 4 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 395 to 551 Sq.ft. Carpet. The Project has total 59 of which 59 are currently available for sale.

Vardhaman Vatika Phase 3 Building No 4 is being developed on a total land area of 41880 Sq.ft. out of which 17868 Sq.ft. i.e 43% is reserved for recreational purposes. Vardhaman Vatika Phase 3 Building No 4 has 1 Wings / Towers Vardhaman Vatika Phase 3 Building No 4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vardhaman Vatika Phase 3 Building No 4
  • Location:
  • 284
  • Const. Stage:
    New
  • Possession:
    30 Dec 2025
Developer Details

  • Developer:
    Vardhaman Venture
  • Phone:
  • Address:
  • Vardhaman Vatika Build 2
Project RERA Details
MAHA REARA No: P51700051332
Project Type Residential / Group Housing
RERA Project Status New
Architect Chirag Mistry And Assocaites
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 30 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Jun 2023
Last Retrived 26 Jul 2025
Vardhaman Vatika Phase 3 Building No 4 QR Code
Vardhaman Vatika Phase 3 Building No 4
MahaRERA - P51700051332
Apartment Details & Configuration
TypeArea
1 BHK36.74 Sq.mts. ( 395 Sq.ft. )
1 BHK38.06 Sq.mts. ( 410 Sq.ft. )
2 BHK49.39 Sq.mts. ( 532 Sq.ft. )
2 BHK51.22 Sq.mts. ( 551 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vardhaman Vatika Phase 3 Building No 4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space15% completed
15% Complete
Murum Filling
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station60% completed
60% Complete
Transfer Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting70% completed
70% Complete
Trees Are Plan On Road And Garden Side
Open Parking70% completed
70% Complete
Dubber Work Completed
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
Stp Tank In Const
Solid Waste Management And Disposal100% completed
95% Complete
Waste Mangement Contarct Done
Storm Water Drains50% completed
50% Complete
Wip
Street Lighting100% completed
95% Complete
Completd
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
All Ready Existing Plant
Water Conservation, Rain water Harvesting100% completed
95% Complete
Pipning Completed
Water Supply100% completed
95% Complete
Grampchayat
Buildings / Wings in Vardhaman Vatika Phase 3 Building No 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vardhaman Vatika Phase 3 Building No 4 by Vardhaman Venturelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

41880 Sq. ft.

Project Area

17868 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

59 apartments in total
Total
59
Booked
0
Available
59

Saleable Area Statistics (Sq. ft.)

28231 Total
Total
28231
Booked
0
Available
28231
Total 59 apartments in project. 0 apartments booked. 0% apartments booked.
Total 28231 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Vardhaman Vatika Phase 3 Building No 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vardhaman Vatika Phase 3 Building No 4Dec 20257101305913
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.74 Sq.mts. ( 395 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK38.06 Sq.mts. ( 410 Sq.ft. )28
None Booked0% Booked
0% Booked
2 BHK49.39 Sq.mts. ( 532 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK51.22 Sq.mts. ( 551 Sq.ft. )28
None Booked0% Booked
0% Booked
59 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Vardhaman Vatika Phase 3 Building No 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
work-in-progress35% done
35% Booked
Channel Partners
Channel Partners Registered by Developer
Vardhaman Venture
for Project
Vardhaman Vatika Phase 3 Building No 4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.