Project overview

Varad Vinayak Complex is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003008. Varad Vinayak Complex is located at Survey No 101/2 /Gat No-242 Hissa No-1. This is a Ongoing being developed by Shree Balaji Bulders And Developers.

Varad Vinayak Complex has FLAT Apartments with carpet areas ranging from 335 to 341 Sq.ft. Carpet. The Project has total 27 of which 14 are currently available for sale.

Varad Vinayak Complex is being developed on a total land area of 22604 Sq.ft. Varad Vinayak Complex has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Ayesha TowerAsrar Ahmed Abdul Rasid ChowkarPlot No. 11/ Gat No.11/ Old Survey No. 125/1/226-01-2026 00:00:00
Sunita PalaceShree Ganesh BuildconSurvey No 33 Hissa No 1 Plot No 1531-12-2026 00:00:00
Tulsi VrundavanTulsi Builders And DevelopersGut No.13 & 1430-09-2026 00:00:00
KedarnathA V Associates08/13431-03-2019 00:00:00
Devbhoomi Residential ComplexAkshay Enterprises9,10,1131-05-2019 00:00:00
Varad Vinayak ComplexShree Balaji Bulders And DevelopersSurvey No 101/2 /Gat No-242 Hissa No-101-12-2018 00:00:00
Project Details
  • Project:
    Varad Vinayak Complex
  • Location:
  • Survey No 101/2 /Gat No-242 Hissa No-1
  • Const. Stage:
    Ongoing
  • Possession:
    01 Dec 2018
Developer Details

  • Developer:
    Shree Balaji Bulders And Developers
  • Phone:
  • Address:
  • Raj Palace
Project RERA Details
MAHA REARA No: P51700003008
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Satyen Parab
Funding Bank
Proposed Possession 01 Dec 2018
Revised Possession 01 Dec 2018
Extended Possession
Litigations No Litigations
Last Modified 04 Aug 2017
Last Retrived 26 Jul 2025
Varad Vinayak Complex QR Code
Varad Vinayak Complex
MahaRERA - P51700003008
Apartment Details & Configuration
TypeArea
FLAT23.67 Sq.mts. ( 255 Sq.ft. )
FLAT29.75 Sq.mts. ( 320 Sq.ft. )
FLAT29.84 Sq.mts. ( 321 Sq.ft. )
FLAT29.88 Sq.mts. ( 322 Sq.ft. )
FLAT29.94 Sq.mts. ( 322 Sq.ft. )
FLAT30.84 Sq.mts. ( 332 Sq.ft. )
FLAT31.08 Sq.mts. ( 335 Sq.ft. )
FLAT31.42 Sq.mts. ( 338 Sq.ft. )
FLAT31.68 Sq.mts. ( 341 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Varad Vinayak Complexlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Na
Buildings / Wings in Varad Vinayak Complex
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Varad Vinayak Complex by Shree Balaji Bulders And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

22604 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

27 apartments in total
Total
27
Booked
13
Available
14

Saleable Area Statistics (Sq. ft.)

8657 Total
Total
8657
Booked
4194
Available
4464
Total 27 apartments in project. 13 apartments booked. 48% apartments booked.
Total 8657 Sq.ft. saleable area. 4194 saleable area booked.
48% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJan 19004101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT23.67 Sq.mts. ( 255 Sq.ft. )3
1 Booked33% Booked
33% Booked
FLAT29.75 Sq.mts. ( 320 Sq.ft. )3
1 Booked33% Booked
33% Booked
FLAT29.84 Sq.mts. ( 321 Sq.ft. )3
1 Booked33% Booked
33% Booked
FLAT29.88 Sq.mts. ( 322 Sq.ft. )3
2 Booked66% Booked
66% Booked
FLAT29.94 Sq.mts. ( 322 Sq.ft. )3
2 Booked66% Booked
66% Booked
FLAT30.84 Sq.mts. ( 332 Sq.ft. )3
3 Booked100% Booked
100% Booked
18 total apartments / 10 apartments booked. 55% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress67% done
67% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJan 19004101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
FLAT31.08 Sq.mts. ( 335 Sq.ft. )3
1 Booked33% Booked
33% Booked
FLAT31.42 Sq.mts. ( 338 Sq.ft. )3
1 Booked33% Booked
33% Booked
FLAT31.68 Sq.mts. ( 341 Sq.ft. )3
1 Booked33% Booked
33% Booked
9 total apartments / 3 apartments booked. 33% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress80% done
80% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress67% done
67% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Balaji Bulders And Developers
for Project
Varad Vinayak Complex
last updated on 26 Jul 2025 as per information obtained from MARA RERA.