Project overview
Vangani Darshan Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003380. Vangani Darshan Phase 1 is located at Thane. This is a On-Going Project being developed by Panika Infrastructures Pvt. Ltd..
Vangani Darshan Phase 1 has 1 BHK & 1RK Apartments with carpet areas ranging from 232 to 408 Sq.ft. Carpet. The Project has total 102 of which 58 are currently available for sale.
Vangani Darshan Phase 1 is being developed on a total land area of 98114 Sq.ft. out of which 9817 Sq.ft. i.e 10% is reserved for recreational purposes. Vangani Darshan Phase 1 has 5 Wings / Towers A1,A2,A3,B,C
| Project | Developer | Location | Possession |
-
Project:
Vangani Darshan Phase 1
-
Location:
-
Thane
-
Const. Stage:
On-Going Project
-
Possession:
31 Dec 2022
-
Developer:
Panika Infrastructures Pvt. Ltd.
-
Phone:
-
Address:
-
1, Panika House, Street No. 116, Near Water Tank, Vangani West, 421503
| MAHA REARA No: |
P51700003380 |
| Project Type |
Residential |
| RERA Project Status |
On-Going Project |
| Architect |
Dilip Navratanji Mehta |
| Funding Bank |
BANK OF BARODA |
| Proposed Possession |
31 Dec 2022 |
| Revised Possession |
30 Dec 2024 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
14 Jan 2021 |
| Last Retrived |
28 Jul 2025 |
Vangani Darshan Phase 1 QR Code
Vangani Darshan Phase 1
MahaRERA - P51700003380
| Type | Area |
| 1 BHK | 34.15 Sq.mts. ( 368 Sq.ft. ) |
| 1 BHK | 34.94 Sq.mts. ( 376 Sq.ft. ) |
| 1 BHK | 35.24 Sq.mts. ( 379 Sq.ft. ) |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) |
| 1RK | 21.99 Sq.mts. ( 237 Sq.ft. ) |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) |
| 1RK | 25.19 Sq.mts. ( 271 Sq.ft. ) |
| 1 BHK | 34.11 Sq.mts. ( 367 Sq.ft. ) |
| 1 BHK | 34.42 Sq.mts. ( 370 Sq.ft. ) |
| 1 BHK | 34.74 Sq.mts. ( 374 Sq.ft. ) |
| 1RK | 21.59 Sq.mts. ( 232 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Vangani Darshan Phase 1last updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Ground Cover And Plants Will Be Planted |
|
|
|
Club House |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Na |
|
|
|
Na |
|
|
|
Work In Progress |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting
|
|
Garden And Plantation |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
To Be Provided |
Solid Waste Management And Disposal
|
|
By The Local Municipal Body |
|
|
|
Work Will Be Starting Shortly |
|
|
|
Solar Street Lights |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Treatment Plant To Be Made |
Water Conservation, Rain water Harvesting
|
|
To Be Provided |
|
|
|
Will Be Provided By Local Body |
Buildings / Wings in Vangani Darshan Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vangani Darshan Phase 1 by Panika Infrastructures Pvt. Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
102
apartments in total
Saleable Area Statistics (Sq. ft.)
33779
Total
Total 102 apartments in project. 44 apartments booked. 43% apartments booked.
Total 33779 Sq.ft. saleable area. 13801 saleable area booked.
41% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A1 | Jan 1900 | 4 | 1 | 0 | 1 | 0 | 0 | 12 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.15 Sq.mts. ( 368 Sq.ft. ) | 3 | |
| 1 BHK | 34.94 Sq.mts. ( 376 Sq.ft. ) | 3 | |
| 1 BHK | 35.24 Sq.mts. ( 379 Sq.ft. ) | 3 | |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) | 3 | |
| 1RK | 21.99 Sq.mts. ( 237 Sq.ft. ) | 3 | |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) | 3 | |
| 1RK | 25.19 Sq.mts. ( 271 Sq.ft. ) | 3 | |
21 total apartments / 6 apartments booked. 28% apartments booked. |
| Work Description in Building A1 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A2 | Jan 1900 | 4 | 1 | 0 | 1 | 0 | 0 | 12 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.15 Sq.mts. ( 368 Sq.ft. ) | 3 | |
| 1 BHK | 34.94 Sq.mts. ( 376 Sq.ft. ) | 3 | |
| 1 BHK | 35.24 Sq.mts. ( 379 Sq.ft. ) | 3 | |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) | 3 | |
| 1RK | 21.99 Sq.mts. ( 237 Sq.ft. ) | 3 | |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) | 3 | |
| 1RK | 25.19 Sq.mts. ( 271 Sq.ft. ) | 3 | |
21 total apartments / 7 apartments booked. 33% apartments booked. |
| Work Description in Building A2 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A3 | Jan 1900 | 4 | 1 | 0 | 1 | 0 | 0 | 12 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.15 Sq.mts. ( 368 Sq.ft. ) | 3 | |
| 1 BHK | 34.94 Sq.mts. ( 376 Sq.ft. ) | 3 | |
| 1 BHK | 35.24 Sq.mts. ( 379 Sq.ft. ) | 3 | |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) | 3 | |
| 1RK | 21.99 Sq.mts. ( 237 Sq.ft. ) | 3 | |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) | 3 | |
| 1RK | 25.19 Sq.mts. ( 271 Sq.ft. ) | 3 | |
21 total apartments / 11 apartments booked. 52% apartments booked. |
| Work Description in Building A3 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B | Jan 1900 | 4 | 1 | 0 | 1 | 0 | 0 | 4 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.15 Sq.mts. ( 368 Sq.ft. ) | 3 | |
| 1 BHK | 34.94 Sq.mts. ( 376 Sq.ft. ) | 3 | |
| 1 BHK | 35.24 Sq.mts. ( 379 Sq.ft. ) | 3 | |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) | 3 | |
| 1RK | 21.99 Sq.mts. ( 237 Sq.ft. ) | 3 | |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) | 3 | |
| 1RK | 25.19 Sq.mts. ( 271 Sq.ft. ) | 3 | |
21 total apartments / 5 apartments booked. 23% apartments booked. |
| Work Description in Building B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| C | Jan 1900 | 4 | 1 | 0 | 1 | 0 | 0 | 5 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 34.11 Sq.mts. ( 367 Sq.ft. ) | 3 | |
| 1 BHK | 34.42 Sq.mts. ( 370 Sq.ft. ) | 3 | |
| 1 BHK | 34.74 Sq.mts. ( 374 Sq.ft. ) | 3 | |
| 1 BHK | 37.88 Sq.mts. ( 408 Sq.ft. ) | 3 | |
| 1RK | 21.59 Sq.mts. ( 232 Sq.ft. ) | 3 | |
| 1RK | 25.15 Sq.mts. ( 271 Sq.ft. ) | 3 | |
18 total apartments / 15 apartments booked. 83% apartments booked. |
| Work Description in Building C | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Panika Infrastructures Pvt. Ltd.
for Project
Vangani Darshan Phase 1
last updated on
28 Jul 2025 as per information obtained from MARA RERA.