Project overview

Vandana Artemis is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009244. Vandana Artemis is located at 0Xbm3vnls0kqunva9hktsg==. This is a Ongoing being developed by Three Towers Lifespace Llp.

Vandana Artemis has 1RK, 3 BHK & Shop Apartments with carpet areas ranging from 421 to 848 Sq.ft. Carpet. The Project has total 18 of which 3 are currently available for sale.

Vandana Artemis is being developed on a total land area of 6690 Sq.ft. out of which 958 Sq.ft. i.e 14% is reserved for recreational purposes. Vandana Artemis has 1 Wings / Towers Vandana Artemis

ProjectDeveloperLocationPossession
Balaji Arcade Wing CShikhar DevelopersJxsjjp5l3orfmdhomttxejlcocoqkisuwu2x/Mycojb2dwavpgd6sgywj1i2brkj31-12-2019 00:00:00
One Meraki - Wing A & Wing BMeraki Habitats LlpEbgaysclls2fwqrmabjjdwai67hp5gctbvm3uyi+4Zh5cw97agjlvavhrh1jxflzxvnexf+Otadhto08nwairw==30-12-2023 00:00:00
Trishabh Greens - Wing ARishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6hcrzr26zxfcerzgavdgto30-12-2025 00:00:00
Trishabh Greens - Wing BRishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6hcrzr26zxfcerzgavdgto30-12-2025 00:00:00
Mani BhavanChhadva AssociatesPzw/Uxasuygtlf75gypmxviywkuywbppqwdc0wyhplc=31-12-2019 00:00:00
Shivpuri Building No.10 Chs Ltd - Shivam HeightsSidhivinayak Constructions3Z3dnc7lnnogdyp98aicqotwwqlqsh+0Sej1w8608+Dkrfhw7pycoycq7xpe42bs31-12-2018 00:00:00
Hubtown Seasons - B WingJoynest Premises PrivatelimitedTetwwqzaw20pldof5hsdjg==31-07-2025 00:00:00
Natekar HeightsSabari Developers LlpPc/3V7jftameupeallypkeyl6hgx40x7wo++8Hqucbu=31-05-2019 00:00:00
Arham AumMahavir Enterprises5N7tt36kmt/P+Fxf9grnwg==31-12-2017 00:00:00
The Golf Boulevard Building - 1Empress & Adishakti JvRsq90vchzchpc4mjx0q9wq==30-06-2022 00:00:00
Dhoot Adi Residency-Shree Adi House ChslDhoot Developers Pvt. Ltd.Qoyscymxtmivvlzdbbb/Eisbkzw+Hi338d5qqksvhue=31-12-2018 00:00:00
Shubham Trident - Sundew, Sunrise And SunglowShubham Homes And Contractors Pvt. Ltd.V5gsrrmp7jmgvrkfdo3r49imxoakhlomi0/Fmmoycoomjsznq75yrbknoss71exe30-12-2023 00:00:00
Kismat ResidencyKismat DevlopersA/Rwpzmyrogyjqnjthqdza==30-12-2021 00:00:00
Sahakar Nagar Grace Co-Op. Hsg. Soc. LtdApoorva Homes0Xbm3vnls0kqunva9hktsg==31-12-2019 00:00:00
Raj Ekjyot SukrutiSadguna RealtyIawkxqy0y+G5dhqojdti9a==31-12-2018 00:00:00
LegranzEkta Shubham VentureIip02h4c4qdflswhxxymuwky9mx7mg1ydsqicdzkwn4=31-12-2018 00:00:00
OrionNivaan Infratech Private Limited3Mix5lo1q3yqcacptqa2kidwbzfbeozlbpheboesotu=31-12-2017 00:00:00
GeetanjaliKukreja Construction CoP31rfnogjfcq4esmkquobzin+Ldwddgpsqd6dhyk7qbzygrar7v9nddqponfznts/9U6mr4z3iwdxodu9buu4jizrdod7uwfwnezmseb09jvvcpiqbeqwiedgvbaa1yz31-12-2017 00:00:00
Chaurang ShraddhaM/S. Chaurang DevelopersGp7cgmaovlrkyskyc7sqqw==31-12-2017 00:00:00
Hubtown Seasons CzarnowoJoynest Premises Private LimitedQa5y3u+5Nypbelry56eeba==31-07-2025 00:00:00
Sabari AshvilleSabari Jani AssociatesPlbtjq/Dxz5y3hsouzoy6x7edozsuehnhq8sgdxmmqe=31-12-2017 00:00:00
SamaraCharisma Builders LtdG/Zudwj/J9iq5vegua2jhi/1Gwdguelq3npvxxprux4sfkj6ze3ulalpujmcyqdbkqp9pz2ir2ni8bbh5xzwcqbk3rxl9xnycyi6uoxs6xv7+Dupbapd5offwovm3amc30-03-2024 00:00:00
InnoventuresInnoventures Infrastructure Pvt LtdUslygxtg6ds8biwi9ibgoa==30-12-2024 00:00:00
Heritage PrideHeritage RealtorsLkxrjpwoneeb6wvhhingqbst6q0/Ekoapthn1amcrkvk8ysijcnsiw+Rru0pg7lv30-09-2018 00:00:00
Chembur Nandadeep Chs LtdOm Sai Developers400071, Mumbai Suburban, Kurla31-08-2022 00:00:00
Aura Apartments - Phase 2 11Th FloorBholenath Developers Ltd.2N13glzywz7fab4jj55mauejg01sz0gvhwmcsxjv/Xw=31-10-2018 00:00:00
Pure GoldSudhir Vasu Shetty7Cds6wggqshsow9ngwg0da==31-03-2018 00:00:00
EdificeBuildproPo6qgihehk7mpxmgwog+Bcinmddypwuhkdp5odpvwuk=31-12-2017 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Vandana ArtemisThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.Vjwztmsq+Dyuhkdsmrtpbxmtcvfvlguod09uwzuimgjg3jeloa6p3pj0lcxpp7l9kr/Yuqkfpcfwgq+J+S8phs4eakew49wvsvpgkbyd62jgbikvo3dw0qlssmf6xh0o31-01-2021 00:00:00
Girivan ShivkunjShri Sati Builders And Developers Private LimitedG1uuzvrwliruio5ztbvbtfyjtt+Dch+Olitsczc8zfy=31-03-2020 00:00:00
Ekjyot SanmaanDheeraj P Vohra6Lhrwpk8j6evuiegvxlskg==30-12-2023 00:00:00
Tulsi ChambersSurana Construction (Chembur )Ojgop6nt2s4ca4fq0ljqza==30-06-2021 00:00:00
ApurvaSidhivinayak ConstructionsAfi/2Vowiqc2zqrb61d4e6f9jyy9s5qle2r0b9v1sro=31-12-2018 00:00:00
Krishvi ResidencyShagun Chembur (Aop)Auip8sa3ojpcpqf83vsywg==31-12-2019 00:00:00
Little Malabar HillPardis Construction LlpMk7cogdqakqthgxpnlhbz6vayfmj5t35uhw1vn9hm1dwcj1xb4g1pas2riudu/Zg30-09-2020 00:00:00
Highway View Phase 1Unity Land ConsultancyWkrrbej3is8kyduolwmdgg==30-12-2020 00:00:00
Moulick EnclaveSrushti Sangam Developers Pvt LtdGpzni1tqn1ciibhg4mmx8q==01-09-2023 00:00:00
United ElicasIi Walls Infra Llp60Wawfcqkeoatzfi2exehrb6qhssphnuhmfbljfuv5hohle6u8nlzniho6yen60q1knv6kv43k6qbycoioqy75ric6xepxoaksmohntwat8=30-12-2024 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedT8q/Uadv211acvoflbmtc80g+Mezmrsdtuqo/Twmbaotvltikhphn+D4zbtwud0svkynhuak6neelwh0wvac6raxu5usuv1obojiqfnj3jbzcd2/Lrjskghrsqycmcv5q/Pchvlg05otzf7dh7zglq==30-04-2018 00:00:00
Sabari ShobhaSabari Developers LlpH0cectqw7zj+1Z37zugrqwdsp9szj0ucg5dyrq+Xetlt8ocheg6zmpe/Blhxiorf30-11-2020 00:00:00
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Zlqtqpaehjegd0mw3cvfdkwxgdvrs+Zr2/Nnzqpzlie=30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.1Csmkvu20xokexjjha3xja==31-12-2019 00:00:00
PanoramaEkta Shubham VentureWfhhirekjlxknxo4onmoeq==31-12-2019 00:00:00
Sidhivinayak FloraSidhivinayak ConstructionsLqr9fgjewehvbo40epqphwwnc73f9m5wsljalydv/Ue=19-08-2024 00:00:00
Abhilash Phase IiSanjona BuildersHssy0xv7wxx3sxitfqlpm9ijkgxmfkd/1Mihxcggqqj49/Zdmffuitqbtazryvr731-12-2024 00:00:00
Redevelopment Of Gurudeo Geetanjali Chs Ltd.Heritage Lifestyles LlpV7ci80dfzj6wkrykxgovizog1rnba8poaueb3cbd6ss=31-12-2025 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.A3vj8ihzunalfed9holwdlkhrrksjy+Wbczaz5rz2uq=31-03-2019 00:00:00
Harvest MoonCalvin PropertiesWlt9cgarbyra7a4sq2qwje+3Qgwp4q0lgb1le05ijpr6uiyyjx1w9ijy9dx3/C7x31-12-2019 00:00:00
Sabari Palm ViewSabari Developers LlpG1npbtzv74hueq16pqipstensepjhexr4rhxrkla5um=31-03-2019 00:00:00
SriniketanMajestic Royale DevelopersImo4ym5qlonsgxmijwprug==30-12-2022 00:00:00
Godrej RksGodrej Projects Development Limited2Dpmjaptuv7ie6d+Wweuv9bbqv7dbb/Vgugsqkrlmcjjtukuaerah5yd2mzyrlqp35hs14v+F8mkxondlzh8vq==30-12-2024 00:00:00
Girivan La QuintaAbhishek Mahesh GarodiaU8vv7n1vb2x6ib0lkvsts9vzbjjwo5ysz51bgz/Sy38=30-04-2025 00:00:00
Rite SkyluxeRite Developers Pvt. Ltd.23W2fapudflzvhdm8ifinor4ivnvgzquumgw6+Ziexq=31-12-2018 00:00:00
Ariso ApartmentKyraa Housing Projects2Kv9bhmzn6qao0mchai+Dfjxjjkl3jh6azlkoske11/9Xxkm4padrs5dgatrk+Xv30-12-2024 00:00:00
Sabari HillgrangeSabari Developers LlpPpk2rwcmvb0rmchbfrpd/Vpo90vriqsc6bcxkm8n75q=31-05-2019 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land ConsultancyUu516uyizwtwu7f590gn5g==31-12-2018 00:00:00
Vishnu ApolloThree Towers Lifespace Llp0Xbm3vnls0kqunva9hktsg==30-12-2021 00:00:00
Safal Sai And Safal SainathMangalnath Developers Pvt LtdInsafrztgkgyshxh7cz0xjxi4rkkc3wrtz4qbiwdrwc+Pylsy4vgnbs2+Cyc+Npa3amkbbvqdxgsvso+Gontcrvxoux4ycadwn4b5xhpnqm=30-12-2023 00:00:00
Subhash Nagar Navrang Chs Adityaraj SupremeRoyale HousingYxwmjo8vrnnwriz/Duowu9mrtxtjjtinjicndsxgevk=31-12-2026 00:00:00
Laxmina Krishna NiwasLaxmina Argentum Realties (India) Private LimitedF3oah+Gxze5mkriduwcooquhdbj1jslaexbbjh+Fqks=31-03-2026 00:00:00
Thapar Le ParcSamarpeet Properties Pvt LtdPzyqglpvtwyay2pyrx33fcpfosobvhlscq2lg1jvakg=30-06-2026 00:00:00
Sabari GayathriSabari Developers LlpK4tn7fzvsckwkc92iixfb3u8xjyruz27xnljy13llas=30-09-2024 00:00:00
Suprabha-Shivam LifestyleShivam Lifestyle3Abxgg15k5qgcektn6sxhg==31-12-2023 00:00:00
Amarjyoti Chs LtdMajestic Royale DevelopersW34yfwharfdfs0r31oabbt3m5pqwvixc+Nfyw9riazm=30-09-2024 00:00:00
Trishabh SignetDimension Housing Realty LlpJoek75keboy+B/U6tpz+Jg==31-12-2019 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction Company2G9il53ls2xb1yntnubs+Q==31-12-2018 00:00:00
Amrita PriveSkree Krishna PropertiesIgihpwvslvxnntelr0lsxnhbk6jbe55fzvbt1nxu6cqth44sfowddbyolrvfsziw30-06-2019 00:00:00
Central ParkShree Ganesh EnterprisesDgaghxrwikybev0sfdtalq5xcvyafgjmddosqrvujgc=31-12-2019 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
Sai SansarConcrete Builders+Ac3mrandz6l8w3atqqkywfoid5gykwasgadthgwliw=30-12-2023 00:00:00
Devi Kakad SolitaireNiraj Kakad Constructions40007128-02-2018 00:00:00
Shrikant Chembers IiShrikant Studios Pvt. Ltd.400071, Mumbai Suburban31-03-2022 00:00:00
Maa KamalVirat BuildersLmcfffmpxuidhdt7rhm3iq==31-07-2019 00:00:00
Arham BrindavanMahavir EnterprisesRvg5nbhma33f1u0gjx2dssatq5gqmfc6hwukuob/25E=31-12-2017 00:00:00
Suvidha SolitairePremier Infotech Pvt LtdMumbai Suburban, 40007131-12-2027 00:00:00
Hubtown Seasons - Ecuador CloudJoynest Premises Private Limited0Tiqwlacztorg6g+Gc6tng==30-12-2024 00:00:00
StevelandCalvin PropertiesWavnnv5e7oukrefkmhwktpnqoxfujur7q5cwbdv3q8droz7yfk0emxoueajd/Awhptwhxwgurzji3pccyaio8g==30-12-2021 00:00:00
Redevelopment Of Apsara Chs Ltd.Heritage Lifestyles & Developers Pvt.Ltd.S0bndgvhy54ah0i8xfoju0skgcaqmgbhef70unelxkv/Vpd8lr3ticzfwz3isneq31-12-2019 00:00:00
Kukreja EstateSonu Realtors Private Limited/Xi6hvdlgqpn7yvzhwdkaq==30-04-2023 00:00:00
LourdesVictor Homes Pvt Ltd40007130-12-2023 00:00:00
Parvati SadanMeena Builder Unit Of V N Raikar HufE/4M4d6l3/I58rz3rfkp1w==30-06-2021 00:00:00
AbhilashSanjona Builders400071, Mumbai Suburban30-12-2017 00:00:00
Pearl BellezaChembur Hotels Private LimitedQfvsozer7phyhs0oav5sda==31-12-2018 00:00:00
Tridhaatu Bhaveshwar VilasTridhaatu Bhaveshwar Developers Llp17Th Road31-10-2018 00:00:00
Meraki ArenaMeraki Habitats LlpXmb7y7npasoee6pfyfo9lqrxj6z9qvhesira53gjro2kfkt9nxxvu4yr9jhjohngnc7di6wzx3j3qtxhpkllba==30-11-2020 00:00:00
Castle PeakInnerspaceLocw4ect1zrbkqke8wixuxdt0cm0avxpak7lp6si1es=31-03-2018 00:00:00
Hari Kunj IiiKukreja Construction CoHv37ukfmmyzeu6vnxdklelm8so50uwjrxdzgdkbqqne=30-09-2020 00:00:00
Redevelopment Of Sri Guruvayurappan Balmukund Co-Operative Housing Society Ltd.Smera Homes LlpYaotquteidirjwg3vwdreeorltmditcophdsmzryb9yuk7wreovdjuvh9s987rob30-09-2024 00:00:00
Avighna Chs LtdMajestic Royale DevelopersKr5kf3wjupiqyvsbbawh2w==30-09-2024 00:00:00
Ekta CrestEkta Housing Private Limited4Ydbz2ozvtahtitm3ggo0g==31-12-2025 00:00:00
Arihant SkyArihant Builders & Developers0P2j2wk435wcxwqh2ohlhsbtcplr5s+Lagiczpaze5s=30-12-2026 00:00:00
Vishwa BhuvanMajestic Royale City DevelopersIrmbm9gmkwahzl25tkqmfrl+Gjxg3paasmoncvi67kq=31-03-2026 00:00:00
49, Simandhar RoyaleSimandhar Homes LlpEldlnnfb8yum5ps1v1wukedn53s8gtyrczb6djhhzlq=31-12-2026 00:00:00
Vighnaharta Sra Chs LtdParsn Construction And Developers Private LimitedDjdn5glruvgpmti3743rrqhnu54ugisodv0durtrmengspz+Q1ummatzabfb1umg30-12-2024 00:00:00
Sarayu SabariMajestic Royale Developers1Pf38fafu4wd+Prvc3ny6wpkknkjquuvbr9hsomh8vf6tt1r1igq6wh/Fpyvutex31-10-2028 00:00:00
The HarvestBindu Raheja And Sons Llp4Npdcso605o1plqxqap5dw==30-06-2028 00:00:00
Zen ApartmentsBholenath Developers Ltd.Nzxtdvfml8pypw+Oy6vvhrvgvd0hi9md/A8mfo5t+Mjxjy9hxlretck96cqvlgpj31-03-2018 00:00:00
Simran HeightsVikas Narayan Raikar+Yzqgustbnvdtldubbtni0xsiwldfrquxqoshoohz9bun5hoog30e1gia9sccszlc+1Asmqpwd+5K6ec2g2co2n+Jwz4wdf0dqf1xqw1ay01gmrzxkw3n6n/Uhsgsh3eubhmbymelq2rdyq2qa+Ndw==24-09-2019 00:00:00
Chembur Manshanti ChslMenorah Realties Private LimitedDdhs1xpvl74eupnauimtsqdp2t5f4yioro4fv2re0gf2bhxsznghlgod5bm5pwk630-12-2023 00:00:00
Amaltas ResidencyTattva & Mittal Corporation Pvt LtdSlnd4pahlhjhoggk9e70sjs1wsjy9jkhhgi2zq3vcgs=31-12-2019 00:00:00
Srinivas BuildingArjun Development & Construction ( India ) Private LimitedBhj7/Xjf5exxaix7wqcrdg==31-12-2019 00:00:00
AeraRe Infra Pvt Ltd28B7lchiwx5z4vdtx/0Cyjaralyx5ntu70ydetlhiiu=31-12-2018 00:00:00
Sai LeelaVriti Infrastructure Pvt. Ltd.F470oeedbdxcrc0cfgr1aph/T8dqw/E4+635Aeiqf2wgjm4fpnmrs+Gmtz2u/E83n93dfxtywe274q6juiwdug==31-12-2017 00:00:00
Hresa - Sainagar Apartment Pvt. Ltd.Bholenath Developers Ltd.Quq4zh2cqgpyl6grh7wr6fsslcj78udkm6uukqmgckw8wky8hf8qsu783/F5aeon14-11-2022 00:00:00
Subhash Nagar Building No 22G A Builders Pvt Ltd.Mumbai Suburban, 40007130-04-2022 00:00:00
Tridhaatu Atharva Venkatesh SadanTridhaatu Venkatesh Sadan Developers LlpV N Purav Marg31-01-2019 00:00:00
Chembur Deep Jyoti Chs LtdP M DevelopersAj8fbjvxw8dd0snm5zsdxyavrd4qnvnqkbjy5jtkbsy0tslnagwmbtmzu4nrclhe31-07-2026 00:00:00
RADHA CONTINENTALSACVIR DIMENSIONS LLPCentral Avenue Road, Chembur, 40007131-10-2027 00:00:00
Shankar Bhavan Premises Co-Operative Society LimitedMishal Construction Private Limited40007131-12-2019 00:00:00
Srushti EnclaveGadkari Builders & Associates5Ed5lht3eh6qgyt0ico+Lvvlu1pbymnn/Kor02pxedobt7t1rxmb2lwfwtbbnj6e31-12-2019 00:00:00
RudrakshSandu DevelopersEnzojc9gzq3zy6j8ougvd90tijorxknfqd+Bb0puyac=31-10-2018 00:00:00
Udaya BhuvanShree Krishna Homes Pvt LtdTufqc39qybdr8mechuot/W==31-03-2019 00:00:00
JaihindS.P. Erectors And Developers Private Limited9G9mpzib84gu2u0wgbxa5a==31-12-2023 00:00:00
Anu-Smera CelesteAnusmera Realty & Infra Private Limited7Rfkgj8itywldx0d6m573g1drcx2spyvsi2eyiuo3icaasqnprvlf6ogdcurednb30-12-2021 00:00:00
Hubtown Seasons - I WingJoynest Premises Private Limited7Smanefmwmrweiqb3xbx9q==30-12-2025 00:00:00
NakshatraMetro Developers Co.Geqkprg5kaadslhbjy+Jfa==30-03-2022 00:00:00
Arham MouryaMahavir Millennium LlpTctxrs+3Z3fumuceticbyw==31-12-2026 00:00:00
Manshaya ApartmentsMass ConstructionFacvgi5golpjkj0jazmo/A==31-12-2026 00:00:00
ChidakashKhemant Jakhubhai NanduUmf6hlb7zxesm8nhrfanpaxewf5wi83irdp9yzlnol0=31-12-2026 00:00:00
RajeswariShree Krishna Homes Pvt LtdEuapfw9stv46l2mixsuhyf/Lzndq03aupnl11dpjwdrvskj9j+Djsqjvrdnankv526lrfi6il9d2uwprtx26vw==31-12-2017 00:00:00
Le JardinJay Construction IndiaRnsb/6Fiegb2bmbciozzkcr8tc/Mf3ockzqqlcb9ftq=18-05-2018 00:00:00
Krishna NiwasShree Krishna Homes Pvt LtdHftfhuh0ueoewnlild8z0g==31-12-2017 00:00:00
InsigniaTwo Taurus Realty Llp36Tyxwwpap/Yp7ido5hlsipg5tt6bx9jo5vginzdjvko7nawyaxxuvpirzi+4Wch31-12-2026 00:00:00
Shankar Darshan Chs LtdMajestic Royale DevelopersHsywqnpa1t2q4lafevjm6a==31-12-2026 00:00:00
27 PallazzoSiddharth Pankaj ChothaniNogbs845os59iqffgm0jzw==31-12-2025 00:00:00
Rustomjee Balmoral - Wing AKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Poddar Spraha Diamond Phase-IPoddar Housing And Development LimitedYzs6ldsd5jgmdf6q+2Z17t3yziz2chxzq02l9urz440=30-12-2021 00:00:00
Casa CelesteAster Developers400071, Mumbai City31-12-2019 00:00:00
Kranti HeightsSidhivinayak ConstructionsSkovcgaap3dtiyi+9Zks6q==30-09-2026 00:00:00
Queens GloryVaibhavlaxmi Builders And Developers37Ssakgvkgq7e2d20futbw==31-12-2027 00:00:00
Serenity HeightsS And T DevelopersUqhiyviobpnikfwkesavnnha89rzuz9pljvftwkjy3s=31-12-2027 00:00:00
Sayba SamriddhiShanaya StarBs9puxm1bqsisr/Aqbfw4cavsxrqhmkbpraucstgx6iomej6noz+2Ndajbyelzrk30-06-2027 00:00:00
Adityaraj PlatinumAdityaraj Housing Company7Fjzydied8jevk7qc57bappcwpcbylcivrlp8i98teuzyjpsj5ouoityjjf1fntq31-08-2028 00:00:00
Swastik LegacySwastik RealtorsKrhz1lyejoqptf2dyw2dkg==31-12-2028 00:00:00
NarullaMajestic Royale Developers02Fscijbtumlbrsf9tu+Q1jyawjp39kx4bargb/Celg=30-06-2028 00:00:00
Sidhivinayak AuraMgs Property Developers Pvt. Ltd.Knbvmyxxgvrkco0mqhltkzuhla2jbt5uuylg81fxrua=31-12-2027 00:00:00
Amardeep ChsAkshay Sthapatya H.S.A.Dejn748y3uwozbf3kg4erw==31-12-2018 00:00:00
Balaji EmpireM/S Trimurti &Amp; K. Mukesh Builders And DevelopersMumbai Suburban, 40007131-12-2008 00:00:00
Hubtown Seasons - DaintreeJoynest Premises Private Limited0Tiqwlacztorg6g+Gc6tng==30-12-2024 00:00:00
Trishabh Greens - Wing CRishabh EnterprisesFhzrtgrxrbma/2Rd/Uyjttczlzjtao4rkay18cxvgd6ima1u7ulz7ra3/Pmcqruh30-06-2027 00:00:00
Sidheshwar RoyaleM/S Yug DevelopersWndv139exldjrxhwzs4awg==31-03-2026 00:00:00
Tricity NatrajTricity Realty Llp2Fvpssxcptlyvygpdi4wda==31-12-2025 00:00:00
Shree VaniShree Krishna Properties31-03-2028 00:00:00
GracelandTrisons Builders31-12-2028 00:00:00
A.R VintageA.R AssociatesLtdmkpkuips1mzz3cloht8ftolasdvwyg7bfenjyjr0=30-05-2022 00:00:00
Mahavir SereneInfinity Construction Co31-12-2029 00:00:00
Swastik RevantaSwastik Realtors31-12-2028 00:00:00
Prima Complex5Th Avenue Habitat Llp30-06-2028 00:00:00
One UttamShree Krishna Living Llp31-12-2029 00:00:00
Rustomjee Balmoral - Wing CKeystone Realtors Limited15-12-2030 00:00:00
One UttamShree Krishna Living Llp31-12-2029 00:00:00
One OasisSuryanagri Builders Llp31-12-2027 00:00:00
Golfshire AVensco Projects Llp31-12-2030 00:00:00
NishirajUnique Builders & DevelopersQk5jh782+Wqvo5fcumgjc6mtu8doykjogrcdznwtnsi=31-03-2019 00:00:00
Rgs AnantyaSingh Holding Pvt LtdLuiq0ccm9vcnbcydbkkgtg==30-06-2023 00:00:00
Trishabh MirayaMetro Properties31-12-2028 00:00:00
Golfshire BVensco Projects Llp31-12-2030 00:00:00
Rustomjee Balmoral - Wing DKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Rustomjee Balmoral - Wing FKeystone Realtors Limited8G1lshiocgx2d5z+Lt8ccdbyel5xke5z+Zirw74qpwi=15-04-2030 00:00:00
Project Details
  • Project:
    Vandana Artemis
  • Location:
  • 0Xbm3vnls0kqunva9hktsg==
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2021
Developer Details

  • Developer:
    Three Towers Lifespace Llp
  • Phone:
  • Address:
  • Sunil Sadan
Project RERA Details
MAHA REARA No: P51800009244
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 30 Dec 2021
Revised Possession 30 Dec 2021
Extended Possession 31 Dec 2024
Litigations No Litigations
Last Modified 23 Oct 2023
Last Retrived 13 Feb 2026
Vandana Artemis QR Code
Vandana Artemis
MahaRERA - P51800009244
Apartment Details & Configuration
TypeArea
1RK39.12 Sq.mts. ( 421 Sq.ft. )
3 BHK78.81 Sq.mts. ( 848 Sq.ft. )
Shop77.6 Sq.mts. ( 835 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vandana Artemislast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station35% completed
35% Complete
Shall Be Done Prior To Oc
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Shall Be Done Prior To Oc
Landscaping & Tree Planting
Tree Planting As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)75% completed
75% Complete
Shall Be Done Prior To Oc
Solid Waste Management And Disposal25% completed
25% Complete
As Per Norms
Storm Water Drains
As Per Swd Remarks
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rainwater Harvesting As Per Consultant
Water Supply60% completed
60% Complete
Connection Will Be Received After Oc
Buildings / Wings in Vandana Artemis
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vandana Artemis by Three Towers Lifespace Llplast updated on 13 Feb 2026 as per information obtained from MARA RERA.

6690 Sq. ft.

Project Area

958 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

18 apartments in total
Total
18
Booked
15
Available
3

Saleable Area Statistics (Sq. ft.)

14829 Total
Total
14829
Booked
12725
Available
2105
Total 18 apartments in project. 15 apartments booked. 83% apartments booked.
Total 14829 Sq.ft. saleable area. 12725 saleable area booked.
86% area booked.

Vandana Artemis

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Vandana ArtemisFeb 2021161010021
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK39.12 Sq.mts. ( 421 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK78.81 Sq.mts. ( 848 Sq.ft. )16
15 Booked93% Booked
93% Booked
Shop77.6 Sq.mts. ( 835 Sq.ft. )1
None Booked0% Booked
0% Booked
18 total apartments / 15 apartments booked. 83% apartments booked.
Work Description in Building Vandana ArtemisCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress75% done
75% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress75% done
75% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress75% done
75% Booked
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked
Channel Partners
Channel Partners Registered by Developer
Three Towers Lifespace Llp
for Project
Vandana Artemis
last updated on 13 Feb 2026 as per information obtained from MARA RERA.