Project overview

Vakratunda Chs is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700049403. Vakratunda Chs is located at 43/9. This is a New being developed by Arya Enterprises.

Vakratunda Chs has 1 BHK & 2 BHK Apartments with carpet areas ranging from 340 to 780 Sq.ft. Carpet. The Project has total 19 of which 14 are currently available for sale.

Vakratunda Chs is being developed on a total land area of 5760 Sq.ft. Vakratunda Chs has 1 Wings / Towers Vakratunda

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Vakratunda Chs
  • Location:
  • 43/9
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Arya Enterprises
  • Phone:
  • Address:
  • Om Raghuveer Chs Ltd
Project RERA Details
MAHA REARA No: P51700049403
Project Type Residential / Group Housing
RERA Project Status New
Architect Right Space Consultants
Funding Bank ICICI BANK LIMITED
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 08 Feb 2023
Last Retrived 26 Jul 2025
Vakratunda Chs QR Code
Vakratunda Chs
MahaRERA - P51700049403
Apartment Details & Configuration
TypeArea
1 BHK31.59 Sq.mts. ( 340 Sq.ft. )
1 BHK43.2 Sq.mts. ( 465 Sq.ft. )
2 BHK51.09 Sq.mts. ( 550 Sq.ft. )
2 BHK66.89 Sq.mts. ( 720 Sq.ft. )
2 BHK72.46 Sq.mts. ( 780 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vakratunda Chslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Work Not Started
Energy management
Work Not Started
Fire Protection And Fire Safety Requirements
Work Not Started
Landscaping & Tree Planting
Work Not Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Work Not Started
Solid Waste Management And Disposal
Na
Storm Water Drains
Work Not Started
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Work Not Started
Water Supply25% completed
25% Complete
Work Started
Buildings / Wings in Vakratunda Chs
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vakratunda Chs by Arya Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

5760 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

19 apartments in total
Total
19
Booked
5
Available
14

Saleable Area Statistics (Sq. ft.)

10530 Total
Total
10530
Booked
3025
Available
7505
Total 19 apartments in project. 5 apartments booked. 26% apartments booked.
Total 10530 Sq.ft. saleable area. 3025 saleable area booked.
29% area booked.

Vakratunda

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VakratundaDec 20257101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.59 Sq.mts. ( 340 Sq.ft. )4
1 Booked25% Booked
25% Booked
1 BHK43.2 Sq.mts. ( 465 Sq.ft. )6
2 BHK51.09 Sq.mts. ( 550 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK66.89 Sq.mts. ( 720 Sq.ft. )3
2 Booked66% Booked
66% Booked
2 BHK72.46 Sq.mts. ( 780 Sq.ft. )4
1 Booked25% Booked
25% Booked
19 total apartments / 5 apartments booked. 26% apartments booked.
Work Description in Building VakratundaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Arya Enterprises
for Project
Vakratunda Chs
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation