Project overview

Vaishnavi Heights is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700011393. Vaishnavi Heights is located at 35/1/12B. This is a Ongoing being developed by Sanjay Shantaram Kankoshe.

Vaishnavi Heights has Residential Apartments with carpet areas ranging from 1115 to 1115 Sq.ft. Carpet. The Project has total 130 of which 57 are currently available for sale.

Vaishnavi Heights is being developed on a total land area of 46285 Sq.ft. out of which 4376 Sq.ft. i.e 9% is reserved for recreational purposes. Vaishnavi Heights has 3 Wings / Towers Type A,Type B,Type C

ProjectDeveloperLocationPossession
Tulsi TowerShri Kalki EnterprisesS. No 20, H.No 1230-09-2020 00:00:00
Mangeshi City IiiMangesh Dashrath Gaikar9/2-A, 9/2-B, 9/2-C30-05-2022 00:00:00
Mahaveer Heavens Phase IMahaveer Infrastructure Pvt LtdPlot No. 3, Survey No. 30/1/830-12-2023 00:00:00
Shankheshwar Platinum Phase 2Shankheshwar KreatersS No142 Pt,144Pt,146Pt Plot B30-03-2022 00:00:00
Mangeshi SohanMangeshi And Deveshwar DevelopersS No 56 Hissa A5, A6 S No 57 Hissa 221,222609-03-2026 00:00:00
Suviam Pearl Phase ILaxmi Construction CoSurvey No.36, Hissa No.3/131-12-2026 00:00:00
Mohan TribecaMohan Lifespaces Llp9/4/2, 9/5/1, 9/5/2, 15/6/1, 15/6/2, 17/2/6, 17/3, 18/2/1, 23/2/1, 62/131-12-2026 00:00:00
Anand HomesShrinath DevelopersS. No. 40 H.No. 1 /H Plot No. 10, S.No. 40 H.No. 1/G Plot No. 930-12-2020 00:00:00
Punyodaya Rio Type AVastusankalp Developers35/1/12A31-12-2019 00:00:00
Mohan Altezza IiMohan Lifespaces Llp9/4/2, 9/5/1, 9/5/2, 15/6/1, 15/6/2, 17/2/6, 17/3, 18/2/1, 23/2/1, 62/131-12-2019 00:00:00
Tulsi ArianaTulsi RealtySurvey No. 26, Hissa No.1/2A30-12-2027 00:00:00
Mahaveer Horizon Wing A And Wing BMahaveer Infrastructure Pvt Ltd28/4/5/2/131-12-2028 00:00:00
36 Mansions A WingSri Lifespace18/1/C, 18/1/D31-12-2027 00:00:00
Om ResidencyShree Ashapura Combines66/3/130-06-2021 00:00:00
Mangeshi CrystalMangesh Dashrath Gaikar36/1 B Part30-06-2018 00:00:00
Punyodaya Rio Type BVastusankalp Developers35/1/12A30-03-2022 00:00:00
Sri ParkviewSri Lifespace19(P)31-12-2027 00:00:00
Sagar HeightsAadinath DevelopersSurvey No. 61/3/1 / New Cts No. 729/A , 734/A31-12-2025 00:00:00
Tulsi PalaceV V Construction CoSurvey No. 2631-12-2027 00:00:00
Mahaveer Heavens Phase IiMahaveer Infrastructure Pvt Ltd29/11, 29/12P30-12-2023 00:00:00
Audumber ShrushtiKathod Dama BhoirS.No. 121 H. No. 4/5/630-12-2023 00:00:00
Shankheshwar Platinum-Phase 1Shankheshwar KreatersS No 142 Pt, 144 Pt, 146 Pt Plot B31-03-2019 00:00:00
Kohinoor LifestyleSonu Anil Hotchandani5/130-12-2020 00:00:00
Vasant EliteM/S Vasant Builders And Developers23/4 And 22/130-06-2018 00:00:00
Mohan SkyvilleMohan Lifespaces Llp9/4/2,9/5/1,9/5/2,15/16/1,15/6/2,17/2/6,17/3,18/2/1,23/2/1,62/130-06-2019 00:00:00
Midtown HeritageMaruti Developers J.V.22 P, 23/3B P, 23/4 P12-01-2021 00:00:00
Vaishnavi HeightsSanjay Shantaram Kankoshe35/1/12B31-12-2017 00:00:00
Krishna PrideGajanan Krupa DevelopersAdharwadi Jail Road30-06-2020 00:00:00
Phoenix AvenuePhoenix Infrastructure And Developers601130-06-2018 00:00:00
Gawade GazelleSai Durga DevelopersS. No. 35 H. No. 1/16/2 Plot No. 2231-03-2024 00:00:00
Maatr InfinityMaatr InfraSurvey No. 2031-03-2027 00:00:00
Balaji ConstructionBalaji ConstructionS. No35, H No 1/16/4 Plot No 2830-04-2023 00:00:00
Project Details
  • Project:
    Vaishnavi Heights
  • Location:
  • 35/1/12B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2017
Developer Details

  • Developer:
    Sanjay Shantaram Kankoshe
  • Phone:
  • Address:
  • Dhanlaxmi Shopping Centre
Project RERA Details
MAHA REARA No: P51700011393
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vitan Consultants
Funding Bank YES BANK
Proposed Possession 31 Dec 2017
Revised Possession 31 Dec 2017
Extended Possession 30 Oct 2020
Litigations No Litigations
Last Modified 17 Jun 2020
Last Retrived 26 Jul 2025
Vaishnavi Heights QR Code
Vaishnavi Heights
MahaRERA - P51700011393
Apartment Details & Configuration
TypeArea
Bank247.5 Sq.mts. ( 2664 Sq.ft. )
Residential254.42 Sq.mts. ( 2739 Sq.ft. )
Shop193.32 Sq.mts. ( 2081 Sq.ft. )
Residential3702.08 Sq.mts. ( 39849 Sq.ft. )
Shop206.44 Sq.mts. ( 2222 Sq.ft. )
Residential103.55 Sq.mts. ( 1115 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vaishnavi Heightslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Prior To Oc
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Prior To Oc
Energy management
Prior To Oc
Fire Protection And Fire Safety Requirements20% completed
20% Complete
Prior To Oc
Landscaping & Tree Planting30% completed
30% Complete
Prior To Oc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Na
Solid Waste Management And Disposal
Prior To Oc
Storm Water Drains50% completed
50% Complete
Prior To Oc
Street Lighting
Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting50% completed
50% Complete
Prior To Oc
Water Supply
Prior To Oc
Buildings / Wings in Vaishnavi Heights
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vaishnavi Heights by Sanjay Shantaram Kankoshelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

46285 Sq. ft.

Project Area

4376 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

130 apartments in total
Total
130
Booked
73
Available
57

Saleable Area Statistics (Sq. ft.)

3895967 Total
Total
3895967
Booked
2607974
Available
1287992
Total 130 apartments in project. 73 apartments booked. 56% apartments booked.
Total 3895967 Sq.ft. saleable area. 2607974 saleable area booked.
67% area booked.

Type A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type AJan 19003103003
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Bank247.5 Sq.mts. ( 2664 Sq.ft. )2
None Booked0% Booked
0% Booked
Residential254.42 Sq.mts. ( 2739 Sq.ft. )4
None Booked0% Booked
0% Booked
Shop193.32 Sq.mts. ( 2081 Sq.ft. )10
None Booked0% Booked
0% Booked
16 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type BJan 190017101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential3702.08 Sq.mts. ( 39849 Sq.ft. )96
65 Booked67% Booked
67% Booked
Shop206.44 Sq.mts. ( 2222 Sq.ft. )12
8 Booked66% Booked
66% Booked
108 total apartments / 73 apartments booked. 67% apartments booked.
Work Description in Building Type BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress90% done
90% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress50% done
50% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress81% done
81% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the flats / premises
work-in-progress90% done
90% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress90% done
90% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Type C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Type CJan 19003100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Residential103.55 Sq.mts. ( 1115 Sq.ft. )6
None Booked0% Booked
0% Booked
6 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Type CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress80% done
80% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Sanjay Shantaram Kankoshe
for Project
Vaishnavi Heights
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation