Project overview

Vaikunth Cluster 4A is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700005256. Vaikunth Cluster 4A is located at 100/24-30,100/31A,31B. This is a New being developed by Piramal Estate Private Limited.

Vaikunth Cluster 4A has 2 BHK Apartments with carpet areas ranging from 495 to 517 Sq.ft. Carpet. The Project has total 583 of which 18 are currently available for sale.

Vaikunth Cluster 4A is being developed on a total land area of 36826 Sq.ft. out of which 1789 Sq.ft. i.e 5% is reserved for recreational purposes. Vaikunth Cluster 4A has 2 Wings / Towers Vama,Vyan

ProjectDeveloperLocationPossession
Sai ApartmentsGajanan Kotkar & Nandini Kotkar5931-12-2018 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas Enterprises616,617,61831-12-2017 00:00:00
Royal Height - Building BNew Royal Construction Company.1025 Part And 112030-12-2021 00:00:00
GiriviharAbhinandan Enterprise77-A/4 And 631-05-2019 00:00:00
Nandishwar PlazaNandishwar Cons CoS No 13 Hissa No 410-08-2023 00:00:00
Empire TowersLakhani Realty Llp208/4 214/631-07-2024 00:00:00
Manorama ChsRupa Properties & Securities Pvt. Ltd.Cts No 926 To 933 And 94231-12-2019 00:00:00
Vaikunth Cluster 4APiramal Estate Private Limited100/24-30,100/31A,31B31-07-2024 00:00:00
AudumberAadyashakti EnterprisesSn 6631-12-2018 00:00:00
ShivkrupaAnant Arjun Madhavi3931-03-2018 00:00:00
Snehadeep Co-Operative Housing Society LtdJoshi EnterprisesSurvey No.8, Tikka No.2 Part Corresponding Totikka No.16, Cts No. 6031-12-2017 00:00:00
Redevelopment Of Manas ChsArvij Builders And Developers Private LimitedCts No 118/B Of Naupada, M G Road, Thane07-05-2022 00:00:00
Dreamland Co-Op. Hsg. Soc. Ltd.Vaastusukh DevelopersTika No.2130-12-2021 00:00:00
Viraj HeightsV-Raj BuildconTika No 20 Part, City Survey No 1025 A Part30-12-2026 00:00:00
Vakratunda ChsArya Enterprises43/931-12-2025 00:00:00
Suprabhat C.H.S. Ltd.Suprabhat Cooperative Housing Society LimitedCts 1732, Tika No 1331-05-2024 00:00:00
Diwa Swapna Co. Op. Housing SocietyL. K. RealtorsS/No.37/3, C.T.S No.366, 36731-07-2025 00:00:00
PadmalaxmiKedar Bhikaji Bapat945 946 947 And 94831-03-2018 00:00:00
Ashwa PlatinumAshwamedh Builders And Developers75531-12-2019 00:00:00
Imperial Heights S1 S2Kamran Livestock & Real Estate Pvt Ltd2/9 Pt 2/11 Pt 2/12 Pt 2/13 Pt31-12-2019 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - Sandhya3 Cts No 27 Tikka No 2131-03-2019 00:00:00
Sahakar NiwasJnm EnterprisesCts 147/2, Tika 12, Fp 262 Part31-08-2018 00:00:00
Ghantali Sainath PlazaKalpataru EnterprisesTika No.15 Cts No 13A Pt10-08-2022 00:00:00
CrossvillaShreeya EnterprisesCts 25,16130-06-2021 00:00:00
Shree SadanShrinivas Dattatray Kale761 Tika No 1131-01-2020 00:00:00
Rajesh Co-Operative Housing SocietyJoshi EnterprisesThane, 40060208-08-2019 00:00:00
Laxmi KeshavAditya AssociatesTika No.22, Cts No. 63/2/A At Gokhale Road, Naupada Thane West31-12-2019 00:00:00
PrabhatSamay Homes423 To 42731-01-2021 00:00:00
Abhijeet Co-Op Hsg SocietyContinental Maniratna Builders &Amp; Developers400602, Thane30-11-2020 00:00:00
Shree Pradyumna Co. Op. Hsg. Soc. Ltd.Joshi And Yash Realtors LlpCts No 53 Tika No 1230-06-2025 00:00:00
Datta SamarthPandurang Arjun ChawanSurvey No. 1277, 1278/A, 1279/A, 1280/A, 1281/A30-06-2024 00:00:00
Pushpak HeightsJ K AssociatesCts No 13/431-12-2024 00:00:00
The Vivek Flat Owners Chs LtdYash AshokaFinalplot No-226, Sub Plot.1825-12-2022 00:00:00
Shyam-KamalManvaibhav Constructions157A-3,157B,158 Tika No.530-12-2021 00:00:00
Redevelopment Of Parijat Building Of Sanksriti Nagar Coop Hsg Soc LtdOjass ConstructionsTps 1, Final Plot No 226, Sub Plot No 1719-12-2021 00:00:00
Madan VilasIshaan Enterprise24/1 27/2 31/131-03-2018 00:00:00
Thana Co-Op Housing Society SopanAditya AssociatesCts Nos 108 / 8, 110A / 4, 108/9 Part Veer Savarkar Path Old Bombay Agra Road Thane West31-12-2019 00:00:00
Anmol SapphireM/S Ekdant Housing53/B/701-08-2019 00:00:00
Automatic Co-Operative Housing Society LtdJoshi Enterprises1/31330-06-2021 00:00:00
SushanVenus RealtorsCn No/ Cts No 28/B30-12-2022 00:00:00
Ramleela Co-Operative Housing Society LimitedYash Infra190018-12-2021 00:00:00
Suyog Society ChsDream Realtors168/331-12-2019 00:00:00
Tropical EliteSchema Enterprises Private Limited88A,88B,9131-05-2018 00:00:00
Orchid Square Phase 2M/S Squarefeet Eco Housing Llp128/631-12-2018 00:00:00
Pradeep Co-Operative Housing Society Ltd.Squarefeet Real EstateFinal Plot No. 269 And 270, T.P. Scheme No. 130-09-2027 00:00:00
Vinu Icchapurti ApartmentAtharva Constructions191, 193 & 194 Tika No 131-03-2026 00:00:00
Shree Krishna ChsVaibhav Developers4031-12-2025 00:00:00
Satyabhama Chs LtdMahesh Shriram BorkarCts No 8830-06-2024 00:00:00
Highland Sky Towers A BuildingProvidence Realty LlpCts No 15,47,4831-12-2026 00:00:00
Redevelopment Of The Bombay Thana ChsGaurang Properties Pvt. Ltd.Shivaji Nagar, 40060231-12-2019 00:00:00
MaithiliSharda Vastu Nirmitee Pvt. Ltd.25/Fp 145/341 -10/345 - 2 -3/350-5 P31-03-2019 00:00:00
New Aparna ShaileshDinanath Kashinath Thanekar168130-12-2024 00:00:00
RhythmAradhana Lifespace LlpCts 247/230-06-2026 00:00:00
Geeta PlazaRoyal DevelopersCts No243,244,24830-06-2026 00:00:00
Shree GaurangGaurang AssociatesThane30-12-2022 00:00:00
Siddhashram Chs LtdStandard InfrastructureCts No.89A,89B01-10-2018 00:00:00
Ramkrishna NiketanYash Govinda Build Infra LlpCts No33e30-12-2020 00:00:00
Vaikunth Cluster 4Piramal Estate Private LimitedNo 7/1 To 14, 8/1To37, 39To42, 9/1To17, 10/2To9, 10/10A,10/10B,10/11To18, 99/13B, 15B30-12-2023 00:00:00
StarlivingTheme Developers Private LimitedT No 21 Cts No 7 Pt And 8 Pt T No 19 Cts No 30 And 3130-12-2025 00:00:00
SindhusmrutiYogiraj Powertech Pvt LtdTikka No 22 Cts No 5/130-11-2018 00:00:00
Amrut PlazaShreeram Builders293,29430-12-2026 00:00:00
New Thana ChsGaurang Properties Pvt. Ltd.Eastern Express Highway, 40060223-09-2018 00:00:00
Sapphire HeightsSpace Corporation25225-12-2024 00:00:00
Vaikunth Cluster 1Piramal Estate Private LimitedNo 7/1 To 14 8/1To37 39To42 9/1To17 10/2To9 10/10A 10/10B 10/11To18 99/13B 15B 100/14A30-12-2022 00:00:00
Sai DarshanShree Sai EnterprisesGut No 11230-12-2022 00:00:00
Devdatta Co-Op. Hsg. Soc. Ltd.Shree Swami Krupa Builders And Developers400602, Thane, Naupada30-12-2023 00:00:00
Balkrushna ArcadeShivaji Parshuram KathorePlot Bearing Cts No 52130-09-2021 00:00:00
Raghuanand ChsVijay Sawant400602, Thane30-06-2018 00:00:00
Suraj Rama HeightsShree Rama Shree Construction Pvt LtdFp No 383 And Fp 38530-06-2021 00:00:00
Mauli Krupa ApartmentJayvijay Builders And Developers87,8830-09-2018 00:00:00
Gaurang RoyaleGaurang Properties Pvt. Ltd.Gokhale Road31-12-2019 00:00:00
Vaikunth Cluster 2Piramal Estate Private LimitedNo 7/1 To 14, 8/1To37, 39To42, 9/1To17, 10/2To9, 10/10A,10/10B,10/11To18, 99/13B, 15B30-12-2024 00:00:00
Eashan Dattaprasad Co Op Hsg Society LtdSripad Vallabh Ventures46A Tika No 15 Sector 230-03-2023 00:00:00
Sai Lavkik HeightsSailavkik Realty Private Limited144B 145 Tika No 0130-12-2021 00:00:00
Shree DattaAadyashakti EnterprisesCts No. 41A,41B,41C And 42.30-12-2022 00:00:00
Highland Sky Tower Damani B BuildingProvidence Realty LlpCts No 15,47,4830-04-2025 00:00:00
TarabaugVidyadhar Achyut VaishampayanCts 114. 7A, 1A Of Tika No. 2120-12-2024 00:00:00
Shahs AvenueShah EnterprisesNaupada31-12-2025 00:00:00
Matru MandirParnad Anil GupteTika No21 Cts No4f31-12-2026 00:00:00
Amar PushpakunjAvighna Redevelopers2014-A/1B, Sector No.1 Of Mouje Kopari31-07-2026 00:00:00
Navkamal Pushpa ChsDream RealtorsCts No.-109 ,Tika No.-22, Sector-231-05-2026 00:00:00
Project Details
  • Project:
    Vaikunth Cluster 4A
  • Location:
  • 100/24-30,100/31A,31B
  • Const. Stage:
    New
  • Possession:
    31 Jul 2024
Developer Details

  • Developer:
    Piramal Estate Private Limited
  • Phone:
  • Address:
  • Piramal Tower
Project RERA Details
MAHA REARA No: P51700005256
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Nov 2023
Last Retrived 26 Jul 2025
Vaikunth Cluster 4A QR Code
Vaikunth Cluster 4A
MahaRERA - P51700005256
Apartment Details & Configuration
TypeArea
2 BHK47 Sq.mts. ( 506 Sq.ft. )
2 BHK48 Sq.mts. ( 517 Sq.ft. )
2 BHK49 Sq.mts. ( 527 Sq.ft. )
2 BHK46 Sq.mts. ( 495 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vaikunth Cluster 4Alast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Yet To Be Started
Community Buildings90% completed
90% Complete
A Part Of A Larger Layout
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
As Per Statutory Requirements
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Statutory Requirements
Landscaping & Tree Planting60% completed
60% Complete
Work Yet To Be Started
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Stp As Part Of Larger Layout
Solid Waste Management And Disposal100% completed
95% Complete
Work Yet To Be Started
Storm Water Drains100% completed
95% Complete
As Per Statutory Requirements
Street Lighting50% completed
50% Complete
Work Yet To Be Started
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Work Yet To Be Started
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Statutory Requirements
Water Supply100% completed
95% Complete
Work Yet To Be Started
Buildings / Wings in Vaikunth Cluster 4A
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vaikunth Cluster 4A by Piramal Estate Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

36826 Sq. ft.

Project Area

1789 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

583 apartments in total
Total
583
Booked
565
Available
18

Saleable Area Statistics (Sq. ft.)

296247 Total
Total
296247
Booked
287119
Available
9128
Total 583 apartments in project. 565 apartments booked. 96% apartments booked.
Total 296247 Sq.ft. saleable area. 287119 saleable area booked.
97% area booked.

Vama

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VamaJul 20244011050292
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK47 Sq.mts. ( 506 Sq.ft. )189
183 Booked96% Booked
96% Booked
2 BHK48 Sq.mts. ( 517 Sq.ft. )94
93 Booked98% Booked
98% Booked
2 BHK49 Sq.mts. ( 527 Sq.ft. )11
10 Booked90% Booked
90% Booked
294 total apartments / 286 apartments booked. 97% apartments booked.
Work Description in Building VamaCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress96% done
96% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress96% done
96% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress91% done
91% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress91% done
91% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress85% done
85% Booked
Sanitary Fittings within the flats / premises
work-in-progress85% done
85% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress87% done
87% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress87% done
87% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vyan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VyanJul 20244011050290
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46 Sq.mts. ( 495 Sq.ft. )48
47 Booked97% Booked
97% Booked
2 BHK47 Sq.mts. ( 506 Sq.ft. )188
179 Booked95% Booked
95% Booked
2 BHK48 Sq.mts. ( 517 Sq.ft. )53
53 Booked100% Booked
100% Booked
289 total apartments / 279 apartments booked. 96% apartments booked.
Work Description in Building VyanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress96% done
96% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress96% done
96% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress33% done
33% Booked
Sanitary Fittings within the flats / premises
work-in-progress33% done
33% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress93% done
93% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress93% done
93% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Piramal Estate Private Limited
for Project
Vaikunth Cluster 4A
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation