Project overview

Vaikunth Cluster 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700003535. Vaikunth Cluster 1 is located at No 7/1 To 14 8/1To37 39To42 9/1To17 10/2To9 10/10A 10/10B 10/11To18 99/13B 15B 100/14A. This is a Ongoing being developed by Piramal Estate Private Limited.

Vaikunth Cluster 1 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 1227 to 1044 Sq.ft. Carpet. The Project has total 318 of which 37 are currently available for sale.

Vaikunth Cluster 1 is being developed on a total land area of 85583 Sq.ft. out of which 5804 Sq.ft. i.e 7% is reserved for recreational purposes. Vaikunth Cluster 1 has 6 Wings / Towers Town House D,Town House E,Town House F,Vatsal,Vivaan,Vyom

ProjectDeveloperLocationPossession
Sai ApartmentsGajanan Kotkar & Nandini Kotkar5931-12-2018 00:00:00
New Kirtikar ProposedChaturthi Developers40060201-07-2025 00:00:00
Shanti KunjShreyas Enterprises616,617,61831-12-2017 00:00:00
Royal Height - Building BNew Royal Construction Company.1025 Part And 112030-12-2021 00:00:00
GiriviharAbhinandan Enterprise77-A/4 And 631-05-2019 00:00:00
Nandishwar PlazaNandishwar Cons CoS No 13 Hissa No 410-08-2023 00:00:00
Empire TowersLakhani Realty Llp208/4 214/631-07-2024 00:00:00
Manorama ChsRupa Properties & Securities Pvt. Ltd.Cts No 926 To 933 And 94231-12-2019 00:00:00
Vaikunth Cluster 4APiramal Estate Private Limited100/24-30,100/31A,31B31-07-2024 00:00:00
AudumberAadyashakti EnterprisesSn 6631-12-2018 00:00:00
ShivkrupaAnant Arjun Madhavi3931-03-2018 00:00:00
Snehadeep Co-Operative Housing Society LtdJoshi EnterprisesSurvey No.8, Tikka No.2 Part Corresponding Totikka No.16, Cts No. 6031-12-2017 00:00:00
Sandhya BuildingS D Bhalerao Constructions Pvt Ltd - Sandhya3 Cts No 27 Tikka No 2131-03-2019 00:00:00
Sahakar NiwasJnm EnterprisesCts 147/2, Tika 12, Fp 262 Part31-08-2018 00:00:00
Ghantali Sainath PlazaKalpataru EnterprisesTika No.15 Cts No 13A Pt10-08-2022 00:00:00
Redevelopment Of Manas ChsArvij Builders And Developers Private LimitedCts No 118/B Of Naupada, M G Road, Thane07-05-2022 00:00:00
Dreamland Co-Op. Hsg. Soc. Ltd.Vaastusukh DevelopersTika No.2130-12-2021 00:00:00
Viraj HeightsV-Raj BuildconTika No 20 Part, City Survey No 1025 A Part30-12-2026 00:00:00
Indira Niwas AnnexShree Swami Krupa Builders And DevelopersCts 785 To 795 230 233 839 Tika No 10 11 Naupada Thane31-12-2018 00:00:00
Dhanashree Co-Operative Housing SocietyL. K. Realtors400602, Thane31-12-2019 00:00:00
Laabh NeelkanthLaabh BuildtechCts No 2931-12-2019 00:00:00
Laxmi KeshavAditya AssociatesTika No.22, Cts No. 63/2/A At Gokhale Road, Naupada Thane West31-12-2019 00:00:00
PrabhatSamay Homes423 To 42731-01-2021 00:00:00
Abhijeet Co-Op Hsg SocietyContinental Maniratna Builders &Amp; Developers400602, Thane30-11-2020 00:00:00
CrossvillaShreeya EnterprisesCts 25,16130-06-2021 00:00:00
Shree SadanShrinivas Dattatray Kale761 Tika No 1131-01-2020 00:00:00
Rajesh Co-Operative Housing SocietyJoshi EnterprisesThane, 40060208-08-2019 00:00:00
Shree Krishna ChsVaibhav Developers4031-12-2025 00:00:00
Satyabhama Chs LtdMahesh Shriram BorkarCts No 8830-06-2024 00:00:00
Highland Sky Towers A BuildingProvidence Realty LlpCts No 15,47,4831-12-2026 00:00:00
The Vivek Flat Owners Chs LtdYash AshokaFinalplot No-226, Sub Plot.1825-12-2022 00:00:00
Shyam-KamalManvaibhav Constructions157A-3,157B,158 Tika No.530-12-2021 00:00:00
Project Details
  • Project:
    Vaikunth Cluster 1
  • Location:
  • No 7/1 To 14 8/1To37 39To42 9/1To17 10/2To9 10/10A 10/10B 10/11To18 99/13B 15B 100/14A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Piramal Estate Private Limited
  • Phone:
  • Address:
  • Piramal Tower
Project RERA Details
MAHA REARA No: P51700003535
Project Type Residential / Group Housing
RERA Project Status Ongoing
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 05 Aug 2017
Last Retrived 26 Jul 2025
Vaikunth Cluster 1 QR Code
Vaikunth Cluster 1
MahaRERA - P51700003535
Apartment Details & Configuration
TypeArea
2 BHK93 Sq.mts. ( 1001 Sq.ft. )
2 BHK94 Sq.mts. ( 1012 Sq.ft. )
5 BHK & more188 Sq.mts. ( 2024 Sq.ft. )
5 BHK & more189 Sq.mts. ( 2034 Sq.ft. )
5 BHK & more190 Sq.mts. ( 2045 Sq.ft. )
5 BHK & more193 Sq.mts. ( 2077 Sq.ft. )
5 BHK & more194 Sq.mts. ( 2088 Sq.ft. )
5 BHK & more191 Sq.mts. ( 2056 Sq.ft. )
5 BHK & more192 Sq.mts. ( 2067 Sq.ft. )
5 BHK & more195 Sq.mts. ( 2099 Sq.ft. )
2 BHK86 Sq.mts. ( 926 Sq.ft. )
2 BHK87 Sq.mts. ( 936 Sq.ft. )
2 BHK88 Sq.mts. ( 947 Sq.ft. )
2 BHK89 Sq.mts. ( 958 Sq.ft. )
2 BHK104 Sq.mts. ( 1119 Sq.ft. )
2 BHK106 Sq.mts. ( 1141 Sq.ft. )
4 BHK168 Sq.mts. ( 1808 Sq.ft. )
1 BHK92 Sq.mts. ( 990 Sq.ft. )
2 BHK84 Sq.mts. ( 904 Sq.ft. )
2 BHK95 Sq.mts. ( 1023 Sq.ft. )
4 BHK177 Sq.mts. ( 1905 Sq.ft. )
2 BHK97 Sq.mts. ( 1044 Sq.ft. )
3 BHK114 Sq.mts. ( 1227 Sq.ft. )
3 BHK117 Sq.mts. ( 1259 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vaikunth Cluster 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
As Per Stat Requirements
Community Buildings100% completed
95% Complete
Library Room
Day care orcreche room
Work Started
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Receiving Station- As Part Of Larger Layout
Energy management
As Per Statutory Requirements
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Statutory Requirement
Hobby Area
Work Started
Indoor games room
Work Started
Landscaping & Tree Planting100% completed
95% Complete
As Per Statutory Requirements
Library room
Work Started
Open Parking
As Per Statutory Requirements
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As A Part Of Larger Layout
Solid Waste Management And Disposal100% completed
95% Complete
Day Care
Storm Water Drains100% completed
95% Complete
As A Part Of Larger Layout
Street Lighting100% completed
95% Complete
Work Yet To Be Started
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Indoor Games
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Statutory Requirement
Water Supply100% completed
95% Complete
As Per Statutory Requirement
Buildings / Wings in Vaikunth Cluster 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vaikunth Cluster 1 by Piramal Estate Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

85583 Sq. ft.

Project Area

5804 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

318 apartments in total
Total
318
Booked
281
Available
37

Saleable Area Statistics (Sq. ft.)

346558 Total
Total
346558
Booked
297743
Available
48815
Total 318 apartments in project. 281 apartments booked. 88% apartments booked.
Total 346558 Sq.ft. saleable area. 297743 saleable area booked.
86% area booked.

Town House D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Town House DDec 202271105027
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK93 Sq.mts. ( 1001 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK94 Sq.mts. ( 1012 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more188 Sq.mts. ( 2024 Sq.ft. )2
1 Booked50% Booked
50% Booked
5 BHK & more189 Sq.mts. ( 2034 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK & more190 Sq.mts. ( 2045 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more193 Sq.mts. ( 2077 Sq.ft. )1
1 Booked100% Booked
100% Booked
7 total apartments / 3 apartments booked. 42% apartments booked.
Work Description in Building Town House DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress43% done
43% Booked
Sanitary Fittings within the flats / premises
work-in-progress43% done
43% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Town House E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Town House EDec 202271105024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK93 Sq.mts. ( 1001 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK94 Sq.mts. ( 1012 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more194 Sq.mts. ( 2088 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK & more189 Sq.mts. ( 2034 Sq.ft. )3
1 Booked33% Booked
33% Booked
5 BHK & more190 Sq.mts. ( 2045 Sq.ft. )1
None Booked0% Booked
0% Booked
7 total apartments / 2 apartments booked. 28% apartments booked.
Work Description in Building Town House ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress88% done
88% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress88% done
88% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress29% done
29% Booked
Sanitary Fittings within the flats / premises
work-in-progress29% done
29% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Town House F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Town House FDec 202271105024
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK94 Sq.mts. ( 1012 Sq.ft. )2
None Booked0% Booked
0% Booked
5 BHK & more190 Sq.mts. ( 2045 Sq.ft. )1
None Booked0% Booked
0% Booked
5 BHK & more191 Sq.mts. ( 2056 Sq.ft. )2
None Booked0% Booked
0% Booked
5 BHK & more192 Sq.mts. ( 2067 Sq.ft. )1
1 Booked100% Booked
100% Booked
5 BHK & more195 Sq.mts. ( 2099 Sq.ft. )1
None Booked0% Booked
0% Booked
7 total apartments / 1 apartments booked. 14% apartments booked.
Work Description in Building Town House FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress86% done
86% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress86% done
86% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress85% done
85% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vatsal

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VatsalDec 20223311050246
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK86 Sq.mts. ( 926 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK87 Sq.mts. ( 936 Sq.ft. )63
63 Booked100% Booked
100% Booked
2 BHK88 Sq.mts. ( 947 Sq.ft. )9
7 Booked77% Booked
77% Booked
2 BHK89 Sq.mts. ( 958 Sq.ft. )3
3 Booked100% Booked
100% Booked
2 BHK104 Sq.mts. ( 1119 Sq.ft. )4
3 Booked75% Booked
75% Booked
2 BHK106 Sq.mts. ( 1141 Sq.ft. )4
1 Booked25% Booked
25% Booked
4 BHK168 Sq.mts. ( 1808 Sq.ft. )1
None Booked0% Booked
0% Booked
100 total apartments / 93 apartments booked. 93% apartments booked.
Work Description in Building VatsalCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vivaan

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VivaanDec 20223311050187
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK92 Sq.mts. ( 990 Sq.ft. )4
None Booked0% Booked
0% Booked
2 BHK92 Sq.mts. ( 990 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK84 Sq.mts. ( 904 Sq.ft. )24
23 Booked95% Booked
95% Booked
2 BHK95 Sq.mts. ( 1023 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK95 Sq.mts. ( 1023 Sq.ft. )17
13 Booked76% Booked
76% Booked
3 BHK92 Sq.mts. ( 990 Sq.ft. )17
17 Booked100% Booked
100% Booked
4 BHK177 Sq.mts. ( 1905 Sq.ft. )1
None Booked0% Booked
0% Booked
76 total apartments / 66 apartments booked. 86% apartments booked.
Work Description in Building VivaanCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Vyom

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VyomDec 20223311050266
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK97 Sq.mts. ( 1044 Sq.ft. )58
53 Booked91% Booked
91% Booked
3 BHK114 Sq.mts. ( 1227 Sq.ft. )32
32 Booked100% Booked
100% Booked
3 BHK117 Sq.mts. ( 1259 Sq.ft. )31
31 Booked100% Booked
100% Booked
121 total apartments / 116 apartments booked. 95% apartments booked.
Work Description in Building VyomCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Piramal Estate Private Limited
for Project
Vaikunth Cluster 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.