Project overview

Vaayu is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800029034. Vaayu is located at Tmw9nfe5sca2v02yz6ugcndp9np7wwaduu3avkcg3wu=. This is a New being developed by Kolte-Patil Developers Limited.

Vaayu has 1 BHK, 1 BHK with Study, 2 BHK, 2 BHK with Study & 3 BHK with Study Apartments with carpet areas ranging from 440 to 1049 Sq.ft. Carpet. The Project has total 206 of which 5 are currently available for sale.

Vaayu is being developed on a total land area of 53763 Sq.ft. out of which 12931 Sq.ft. i.e 24% is reserved for recreational purposes. Vaayu has 4 Wings / Towers Wing A 21St Floor To 32Nd Floor Proposed,Wing A Ground Floor To 20Th Floor,Wing B,Wing C

ProjectDeveloperLocationPossession
Anuj Industrial ParkM/S Girija Developers400068, Thane, Dahisar28-02-2018 00:00:00
Shri Sai Vishram ChslAaryadeep Builders & DevelopersJklfixpku1smkr+Owj3cpv7m2sy8gca7hdp2wqm0gkosckrihtkpmvvr4n8uqvqa0dn8qcr0d0x6qct87y2dslfaumwptuizyyhwmjwkadq=31-12-2019 00:00:00
Dahisar Gulistan ChsDahisar Gulistan Co Operative Housing Society Limited8Mjovc+Xzzjc3zybtwmmlmnpojtumt3rdgcwz8tanoy=30-06-2021 00:00:00
Northern HeightsN.Rose Developers Pvt Ltd7N2rcvjy6rwzuwua/Syzni+3Fliy596lxm9w6ununbxki+Wgyhqfen+Fhhvd4e+P30-06-2021 00:00:00
Alexio Apartment ChslM. Mamtora AssociatesAancxpxjkubkm/0Aq4b3nw==15-09-2018 00:00:00
Happy Home ChslSumukh InfraMnfp0vddnmzo9yxe/Slzgw==30-12-2021 00:00:00
Dahisar Ujwal C.H.S. LtdThe Kt Group UjjwalaDahisar31-12-2017 00:00:00
Atmaram ChslNamorealty And Infra LlpZ4fgst0/7Wxtbhyw4bcevg==31-10-2019 00:00:00
New Mahavir Darshan ChslLmp GroupDqltll1zwvx7hll9jf3iyidldna/Wta2i9nya1pon18=31-03-2018 00:00:00
Bobe Chandralekha ChslSsakash Developers &Amp; Builders Pvt Ltd40006830-09-2015 00:00:00
Heaven PlazaN.Rose Developers Pvt LtdFl3trlpw3blarbwykrp55vupek9r2rupsn8vqiioyn/Qdzyo2pjzrarlpkawly9g30-09-2018 00:00:00
Sakshi EnclaveSakshi Saurabh Dant9Vzthpdvaoltbj2impakpuoibjch2ayf1rvwjo9hiuy=31-03-2019 00:00:00
Yellow RosesNavkar Infra ProjectsZ8hynr6khcp8jm4maexfyw==19-07-2020 00:00:00
VaayuKolte-Patil Developers LimitedTmw9nfe5sca2v02yz6ugcndp9np7wwaduu3avkcg3wu=31-01-2025 00:00:00
Prime AudumbarPrime Group LlpY2dyesdy0qpjw0b4rxxiuw==31-03-2024 00:00:00
Mayaank HeightsN. K. LifestyleDiegi7u3j/Qlnxv0+6D1mweyjh4rfk4llzed68eptkorzkkw+Qcg0+Jjvimyvplb31-03-2024 00:00:00
Shree Manik VishwaAnil Gangaram SawantQjcpvhhftg5tvwgixxxsw9q0bhjbfhwpwme+Grvdb+W=28-08-2022 00:00:00
Nishchay - Wing EShreeraj Developer LlpRqey4x9ui6rbj3kh1o4vmg==30-12-2024 00:00:00
Nishchay Wing DShreeraj Developer LlpNructmdx/Qwjwpgvblmjfg==30-12-2024 00:00:00
Romell CornerstoneRomell Real Estate Private LimitedSorsdibvalcyurqpqft2hsie+Zdzrdlhbtx56z4imbe=31-03-2024 00:00:00
Romell SereneRomell Real Estate Private Limited/5Gxyqwghgmeabyeqbhufq==31-03-2025 00:00:00
Prime Group Project Grand SlamPrime GroupTv+9Kfkbks34/Wnv8+Lvog==31-12-2023 00:00:00
Rishabraj AgnelRishabraj Estate Developers Pvt LtdUkjnowmojowwdrpsg5v7u7fkckk03cwpxt5+Wmfws2w=31-08-2024 00:00:00
Rishabraj PrideRril LimitedQhdtfrbx0dw7wtuo72cl8ydbr7vcebl62ecbfp24wre9c/Zppwyn+65Xdpldtdk0tk/Gell2ltplt+Bf7w1ttfei5hzdnq/R79foca+4Boxo+E/Cf2ezq0iyggujvttf31-08-2023 00:00:00
Maan PappilonMaan RealtyIgelg9wpboypohv3adn/Qg==31-12-2018 00:00:00
Om Shiv Matoshree Sra Chs LtdArjun Anant WaghmareW0jcqvudagkx+Mkk5kojzg==31-05-2019 00:00:00
AcropolisVora AssociatesVzdcxyssph3tzfpmuge2srh7h1sjiglqswhbpu6rvbg=30-12-2023 00:00:00
Ruby ChsHasmukh R HiraniAh6w7t8tlcd5valrztxxaq==31-03-2019 00:00:00
PalladiumChheda BuildersDpqmhn8phfewsanknvdoytvexedv6l8aiq8dyqaxr9q=30-12-2021 00:00:00
MadonnaMichael Rodrigues8Smururjovg+3V6y1pwekq==15-12-2019 00:00:00
RayManish Builders & DevelopersFavdyi8cdw1hyo+Lj1j9dzcitdjl5b9zkzbawlvnmbm=31-10-2025 00:00:00
Mary VillaH&D Projects5Rib3y/Gfb127cgowsyuyw==31-12-2023 00:00:00
Redevelopment Of Nirav ChslNavin ShahVamanrao Bhoir Marg31-12-2024 00:00:00
Suma Sam ChslSuma Sam Co-Op. Hsg. Soc. Ltd.Pam0xxt7iqbxxnqercbcww==30-10-2022 00:00:00
Prime ClassicPrime Group LlpCn4jc5xifhnwqhbo9obotw==31-01-2023 00:00:00
Shilptaru ResidencyKonark Shakti Group Of Company/L882p/9Lztdm43l7ng/Cg==30-06-2023 00:00:00
Ozone ResidencyBlue Ocean Realty0Yuqidtu/Mgta0tvyei+2Hs6xb19tyludl9kqguovbul3e58av8rlrpr7eizr8ulas3zban6tc5gduvweem1h8pptgy3kq4a8jeezp+1Rkumxkxceqlfwwt6aywxtatswbqxllhfpc7qqpa/9Uyhxsqf2/Z+Iynpkfef3wgwf8y=31-12-2027 00:00:00
Borivali Sai Hill ChsThe Green Venturez RealtorsZfptieagfr+Yel9oqtgseg==31-12-2026 00:00:00
Raghukul ChslRamniyati Realities Llp9Zigemu0fmceglhidkg9fg==31-12-2029 00:00:00
Rishabraj Villa StellaH Rishabraj Realty0Ou6fraggqwiaave//Lavfvzy/Ybar4nimpx10ejjvo=31-12-2024 00:00:00
Rishabraj PercyH Rishabraj RealtyH2vjeilyevre8ws2yjpfta==31-12-2024 00:00:00
Borivali Shalimar Co-Operative Housing Society LimitedTasmai ShreeRtdrjlgjdnnblqyhxxjjgw==31-12-2024 00:00:00
GAGANGIRI LEGACYSHRI GAGANGIRI CONSTRUCTION CODahisar, Mumbai Suburban, Borivali31-12-2026 00:00:00
The Konark RiseKonark Rajendra ShahW4eokwe5+Wczcufswo4adq==31-03-2026 00:00:00
Saffron PeaceRishabraj Namo Enterprise LlpP/Iv3lc1lped5agqsumg92v/Zdrbvgt269yko7pdi5w=31-12-2027 00:00:00
Crescent HeightsHarshmaan Spaces LlpWw+Gwmxeb5ph0nrzbqrp+Ca+9D5hltkk+7Uqkzfxnnc=31-03-2025 00:00:00
Shiv ParbatV3 PartnersFo2virvki0wqjlt0kvglqa==15-03-2027 00:00:00
Prime AuraPrime Group9Xz9orwn6jkdiup8oopnug==31-12-2025 00:00:00
Dahisar Manisha Chs LtdMitnetra EnterpriseRteuk/Runtdkn2ugnw5fah5o1lyhgzyhh8ghe1u4x6u=31-12-2019 00:00:00
Romell ShraddhaShraddha Shivshakti DevelopersLtap1cgpq0i5beh8guodygimwlns7iad3drxwrpdpee=31-12-2018 00:00:00
Prime Group Project SatyaniwasNitin Vasudev BhandarkarYbubr0wqy7jazw7wmbxg2w==31-05-2019 00:00:00
Gokul VaibhavHeena LifestylesMumbai Suburban28-02-2018 00:00:00
Aavaas ClassicM. K. Realtors400068, Mumbai Suburban31-03-2017 00:00:00
Parinee AdneyParinee Realty Private LimitedEmd7bff9iummvbclccjtvboxqhrnxvppp7zv6pbbngykrs355dtp60wnhrew6csr31-12-2019 00:00:00
Nageshwar Sra ChsVishwambhar ConstructionsQ0poqsroxjvzabxg/Hm3xc+Exipgq7bsskgjevetgk1hlht5bp0i064vqc480xg5e/39Xu4azbyc2dbcigkfcw==31-12-2026 00:00:00
Varella MansionDean Home Llp2Prm01d6zzvl19chrqigp7fbfpjesbesvfgizeau/V8=31-10-2027 00:00:00
Rishabraj EmeraldH Rishabraj UniversalWglijtqx0e7mfsq+Nfhx7a==31-12-2026 00:00:00
Rishabraj AstralRishabraj Estate Developers Pvt LtdU0uz8ozt4qivwnkbxrhm4bb63nmdmqbnmjinsfkcp09g+Pdlhnpdlco8leiw4iqr31-08-2029 00:00:00
Kaveri Apartments Chsl Triveni EdenTriveni DevelopersMumbai Suburban31-12-2017 00:00:00
Haritara Residency / Haritara Co-Operative Housing Society Limited-Haritara Construction CompanyZiaw37a78auxa5xz4ojwbg==31-12-2018 00:00:00
Prime LegacyPrime GroupXhfazfgmsclklyactivyew==31-12-2024 00:00:00
Manhar ResidencyShlok Enterprises (Manhar)Evbofygagn0thl/Nuycnbq==31-12-2019 00:00:00
Navkar PalazzoNavkar Infra ProjectsBabhai Naka30-12-2022 00:00:00
Romell ArianaRomell Real Estate Private LimitedLubd56dfwl5szapog2fmucg/Lpa9+Pyt7tp/Jmj69ve=31-12-2028 00:00:00
Rijin CityshoreMitesh Bhikhubhai ShahDefmwjal/T3tcftqk0zxta==31-08-2027 00:00:00
RajhansPratham DevelopersDlgk5mh7wuq6ink2i+Ejhw==31-12-2019 00:00:00
Redevelopment Of Pushpawadi ChslPranav Constructions LimitedQxo1njydyf0c1wl4lccuia==30-12-2023 00:00:00
Dinaco Darshan Chs LtdDinaco Darshan ChslApcwurtetj0glzrgg1+Ysq==31-12-2024 00:00:00
Suryadarshan Chs LtdH&D Projects19Eqqc2wklfzmmbbkoadoq==30-04-2024 00:00:00
Sea Rock Chs LtdSea Rock Chs LtdG5chofgbehnjayayjl2wmw==30-06-2025 00:00:00
Dps Rivera Sanctum Infratech Private Limited05-12-2027 00:00:00
Dps SanctumSanctum Infratech Private LimitedQpybxkks/Zrjildelyn1ogcgs8qjxobyahxfc7jc1wa=31-12-2026 00:00:00
OptimusPanchnaad Developers31-12-2026 00:00:00
Modibrick GokulamModibrick Homes Private Limited31-12-2027 00:00:00
Rl SadguruRaut Landmark Llp30-06-2028 00:00:00
Concepta ChslHirani Realty17-12-2027 00:00:00
Nutan DahisarNootan Associates31-12-2028 00:00:00
Rishab Mahesh DarshanRishab Infra30-06-2029 00:00:00
Empire PrestonEmpire Realty31-07-2028 00:00:00
Yashwant HeightM.P. Global Height Private Limited9Zesqmdw60a83ddy7fhsjg==30-12-2021 00:00:00
Mv Dahisar Bhavana Mv Group31-05-2029 00:00:00
Ave MariaM D Infra31-03-2029 00:00:00
Amarnath Cooperative Housing Society LtdAnkeeta Associates30-11-2027 00:00:00
Project Details
  • Project:
    Vaayu
  • Location:
  • Tmw9nfe5sca2v02yz6ugcndp9np7wwaduu3avkcg3wu=
  • Const. Stage:
    New
  • Possession:
    31 Jan 2025
Developer Details

  • Developer:
    Kolte-Patil Developers Limited
  • Phone:
  • Address:
  • City Bay
Project RERA Details
MAHA REARA No: P51800029034
Project Type Residential / Group Housing
RERA Project Status New
Architect Reza Kabul
Funding Bank AXIS BANK
Proposed Possession 31 Jan 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Apr 2021
Last Retrived 13 Feb 2026
Vaayu QR Code
Vaayu
MahaRERA - P51800029034
Apartment Details & Configuration
TypeArea
proposed0 Sq.mts. ( 0 Sq.ft. )
2 BHK62.87 Sq.mts. ( 677 Sq.ft. )
2 BHK63.1 Sq.mts. ( 679 Sq.ft. )
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )
2 BHK63.6 Sq.mts. ( 685 Sq.ft. )
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )
1 BHK40.93 Sq.mts. ( 441 Sq.ft. )
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )
1RK27.25 Sq.mts. ( 293 Sq.ft. )
2 BHK50.37 Sq.mts. ( 542 Sq.ft. )
2 BHK64.21 Sq.mts. ( 691 Sq.ft. )
2 BHK67.12 Sq.mts. ( 722 Sq.ft. )
1 BHK40.94 Sq.mts. ( 441 Sq.ft. )
1 BHK with Study46.01 Sq.mts. ( 495 Sq.ft. )
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )
2 BHK58.3 Sq.mts. ( 628 Sq.ft. )
2 BHK64.23 Sq.mts. ( 691 Sq.ft. )
2 BHK67.15 Sq.mts. ( 723 Sq.ft. )
2 BHK with Study82.41 Sq.mts. ( 887 Sq.ft. )
3 BHK with Study97.48 Sq.mts. ( 1049 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Vaayulast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
1201.28 Sq Mt
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room &Amp; Sub-Station
Energy management80% completed
80% Complete
As Per Design &Amp; Drawing Of Consultant
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Provisional Fire Noc Received From Fire Dep
Fitness Center90% completed
90% Complete
As Per Design &Amp; Drawing Of Consultant
Landscaping & Tree Planting20% completed
20% Complete
As Per Design &Amp; Drawing Of Consultant
Mechanized Parking tower55% completed
55% Complete
As Per Design &Amp; Drawing Of Consultant
Open Parking
17 Nos
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Solid Waste Management And Disposal100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Storm Water Drains95% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Street Lighting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Supply100% completed
95% Complete
Preconstruction In Tankers &Amp; Post Constructionmcgm
Buildings / Wings in Vaayu
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Vaayu by Kolte-Patil Developers Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

53763 Sq. ft.

Project Area

12931 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

206 apartments in total
Total
206
Booked
201
Available
5

Saleable Area Statistics (Sq. ft.)

119653 Total
Total
119653
Booked
116638
Available
3015
Total 206 apartments in project. 201 apartments booked. 97% apartments booked.
Total 119653 Sq.ft. saleable area. 116638 saleable area booked.
97% area booked.

Wing A 21St Floor To 32Nd Floor Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A 21St Floor To 32Nd Floor ProposedJan 2025120000840
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
proposed0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Wing A 21St Floor To 32Nd Floor ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing A Ground Floor To 20Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A Ground Floor To 20Th FloorJan 2025231112081
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.87 Sq.mts. ( 677 Sq.ft. )20
19 Booked95% Booked
95% Booked
2 BHK63.1 Sq.mts. ( 679 Sq.ft. )17
16 Booked94% Booked
94% Booked
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )20
19 Booked95% Booked
95% Booked
2 BHK63.6 Sq.mts. ( 685 Sq.ft. )20
19 Booked95% Booked
95% Booked
77 total apartments / 73 apartments booked. 94% apartments booked.
Work Description in Building Wing A Ground Floor To 20Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BAug 2024211112470
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK40.93 Sq.mts. ( 441 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )18
18 Booked100% Booked
100% Booked
1RK27.25 Sq.mts. ( 293 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.37 Sq.mts. ( 542 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK64.21 Sq.mts. ( 691 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK67.12 Sq.mts. ( 722 Sq.ft. )1
1 Booked100% Booked
100% Booked
65 total apartments / 64 apartments booked. 98% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CAug 2024211112562
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )17
17 Booked100% Booked
100% Booked
1 BHK40.94 Sq.mts. ( 441 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )17
17 Booked100% Booked
100% Booked
1 BHK with Study46.01 Sq.mts. ( 495 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK58.3 Sq.mts. ( 628 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK64.23 Sq.mts. ( 691 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK67.15 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK with Study82.41 Sq.mts. ( 887 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK with Study97.48 Sq.mts. ( 1049 Sq.ft. )5
5 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Kolte-Patil Developers Limited
for Project
Vaayu
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation