Project overview

VAAYU is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800029034. VAAYU is located at Cts No 51, Village Mandpeshwar. This is a New being developed by KOLTE-PATIL DEVELOPERS LIMITED.

VAAYU has 1 BHK, 1 BHK with Study, 2 BHK, 2 BHK with Study & 3 BHK with Study Apartments with carpet areas ranging from 440 to 1049 Sq.ft. Carpet. The Project has total 206 of which 5 are currently available for sale.

VAAYU is being developed on a total land area of 53763 Sq.ft. out of which 12931 Sq.ft. i.e 24% is reserved for recreational purposes. VAAYU has 4 Wings / Towers Wing A 21St Floor To 32Nd Floor Proposed,Wing A Ground Floor To 20Th Floor,Wing B,Wing C

ProjectDeveloperLocationPossession
Project Details
  • Project:
    VAAYU
  • Location:
  • Cts No 51, Village Mandpeshwar
  • Const. Stage:
    New
  • Possession:
    31 Jan 2025
Developer Details

  • Developer:
    KOLTE-PATIL DEVELOPERS LIMITED
  • Phone:
  • Address:
  • City Point
Project RERA Details
MAHA REARA No: P51800029034
Project Type Residential / Group Housing
RERA Project Status New
Architect Reza Kabul
Funding Bank AXIS BANK
Proposed Possession 31 Jan 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 23 Apr 2021
Last Retrived 13 Feb 2026
VAAYU QR Code
VAAYU
MahaRERA - P51800029034
Apartment Details & Configuration
TypeArea
proposed0 Sq.mts. ( 0 Sq.ft. )
2 BHK62.87 Sq.mts. ( 677 Sq.ft. )
2 BHK63.1 Sq.mts. ( 679 Sq.ft. )
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )
2 BHK63.6 Sq.mts. ( 685 Sq.ft. )
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )
1 BHK40.93 Sq.mts. ( 441 Sq.ft. )
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )
1RK27.25 Sq.mts. ( 293 Sq.ft. )
2 BHK50.37 Sq.mts. ( 542 Sq.ft. )
2 BHK64.21 Sq.mts. ( 691 Sq.ft. )
2 BHK67.12 Sq.mts. ( 722 Sq.ft. )
1 BHK40.94 Sq.mts. ( 441 Sq.ft. )
1 BHK with Study46.01 Sq.mts. ( 495 Sq.ft. )
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )
2 BHK58.3 Sq.mts. ( 628 Sq.ft. )
2 BHK64.23 Sq.mts. ( 691 Sq.ft. )
2 BHK67.15 Sq.mts. ( 723 Sq.ft. )
2 BHK with Study82.41 Sq.mts. ( 887 Sq.ft. )
3 BHK with Study97.48 Sq.mts. ( 1049 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of VAAYUlast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
1201.28 Sq Mt
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Meter Room &Amp; Sub-Station
Energy management80% completed
80% Complete
As Per Design &Amp; Drawing Of Consultant
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Provisional Fire Noc Received From Fire Dep
Fitness Center90% completed
90% Complete
As Per Design &Amp; Drawing Of Consultant
Landscaping & Tree Planting20% completed
20% Complete
As Per Design &Amp; Drawing Of Consultant
Mechanized Parking tower55% completed
55% Complete
As Per Design &Amp; Drawing Of Consultant
Open Parking
17 Nos
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Solid Waste Management And Disposal100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Storm Water Drains95% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Street Lighting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Design &Amp; Drawing Of Consultant
Water Supply100% completed
95% Complete
Preconstruction In Tankers &Amp; Post Constructionmcgm
Buildings / Wings in VAAYU
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of VAAYU by KOLTE-PATIL DEVELOPERS LIMITEDlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

53763 Sq. ft.

Project Area

12931 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

206 apartments in total
Total
206
Booked
201
Available
5

Saleable Area Statistics (Sq. ft.)

119653 Total
Total
119653
Booked
116638
Available
3015
Total 206 apartments in project. 201 apartments booked. 97% apartments booked.
Total 119653 Sq.ft. saleable area. 116638 saleable area booked.
97% area booked.

Wing A 21St Floor To 32Nd Floor Proposed

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A 21St Floor To 32Nd Floor ProposedJan 2025120000840
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
proposed0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Wing A 21St Floor To 32Nd Floor ProposedCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Wing A Ground Floor To 20Th Floor

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A Ground Floor To 20Th FloorJan 2025231112081
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK62.87 Sq.mts. ( 677 Sq.ft. )20
19 Booked95% Booked
95% Booked
2 BHK63.1 Sq.mts. ( 679 Sq.ft. )17
16 Booked94% Booked
94% Booked
2 BHK63.25 Sq.mts. ( 681 Sq.ft. )20
19 Booked95% Booked
95% Booked
2 BHK63.6 Sq.mts. ( 685 Sq.ft. )20
19 Booked95% Booked
95% Booked
77 total apartments / 73 apartments booked. 94% apartments booked.
Work Description in Building Wing A Ground Floor To 20Th FloorCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress75% done
75% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BAug 2024211112470
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK40.93 Sq.mts. ( 441 Sq.ft. )10
10 Booked100% Booked
100% Booked
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )18
18 Booked100% Booked
100% Booked
1RK27.25 Sq.mts. ( 293 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK50.37 Sq.mts. ( 542 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK64.21 Sq.mts. ( 691 Sq.ft. )15
15 Booked100% Booked
100% Booked
2 BHK67.12 Sq.mts. ( 722 Sq.ft. )1
1 Booked100% Booked
100% Booked
65 total apartments / 64 apartments booked. 98% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CAug 2024211112562
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.88 Sq.mts. ( 440 Sq.ft. )17
17 Booked100% Booked
100% Booked
1 BHK40.94 Sq.mts. ( 441 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK41.04 Sq.mts. ( 442 Sq.ft. )17
17 Booked100% Booked
100% Booked
1 BHK with Study46.01 Sq.mts. ( 495 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK50.43 Sq.mts. ( 543 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK58.3 Sq.mts. ( 628 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK64.23 Sq.mts. ( 691 Sq.ft. )8
8 Booked100% Booked
100% Booked
2 BHK67.15 Sq.mts. ( 723 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK with Study82.41 Sq.mts. ( 887 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK with Study97.48 Sq.mts. ( 1049 Sq.ft. )5
5 Booked100% Booked
100% Booked
64 total apartments / 64 apartments booked. 100% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
KOLTE-PATIL DEVELOPERS LIMITED
for Project
VAAYU
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation