Project overview

The Ace is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800030288. The Ace is located at C.T.S. No 496 Pt 496/8 To 17 At Village Pahadi Goregaon I.B Patel Road Goregaon East. This is a New being developed by Tanvi Construction Pvt Ltd.

The Ace has Office space Apartments with carpet areas ranging from 1187 to 964 Sq.ft. Carpet. The Project has total 99 of which 99 are currently available for sale.

The Ace is being developed on a total land area of 37276 Sq.ft. out of which 4648 Sq.ft. i.e 12% is reserved for recreational purposes. The Ace has 1 Wings / Towers V-Protein

ProjectDeveloperLocationPossession
Constrution Of 24 Lig Ts On Cts No 356 P At Siddharth Nagar Goregaon West Mumbai 400062Mumbai Housing And Area Development BoardCts No 356 Part30-06-2019 00:00:00
Samarth TanishNitin Dattaram Samant31830-12-2023 00:00:00
HimbinduM/S. Sahajanand Developers292/21 To 30, 292 Pt31-12-2018 00:00:00
Sheetal KrupaD.G.Land Developers Private Limited224/B/13 To 17, 225, 224/B/631-12-2018 00:00:00
Om Shubh LabhBali Realty Llp695, 695/1 To 695/630-06-2018 00:00:00
34 Park EstateM/S Reddy Builders & Developers50 A Part, 55 Part, 49 Part31-07-2028 00:00:00
Hetali BlessingsHetali Enterprises257/A04-08-2019 00:00:00
Chaitanya ResidencyEthics Infra Development Pvt Ltd93, 93/1 And 2, Cts No. 38030-04-2018 00:00:00
Aspen ParkMessrs. Unique Real Estate DevelopersCts No. 554/C30-12-2020 00:00:00
Janardan ChslMahesh Laxman ThakkarPlot No 7631-03-2019 00:00:00
Siddharth Nagar Sukhvilla Chs LtdDilip Hiralal DoshiPlot No 6 - Cts No 350 Part 350/ 13 To 1630-06-2018 00:00:00
Global ResidencyGlobal Housing VenturesCts 44401-07-2023 00:00:00
Laxmi HeightsLaxmidevi DevelopersPlot No 30731-12-2018 00:00:00
Swati C.H.S. LtdDilip Hiralal DoshiCts No 348 P 348 70 To 7230-06-2018 00:00:00
Siddarth Nagar Arunodaya Chs LtdChiraginfraprojectspvt LtdMumbai Suburban, 40006231-03-2018 00:00:00
Iris Business ParkIris Business Park400063, Mumbai Suburban31-12-2018 00:00:00
Ronit ResidencyRushi Builders And Developers400063, Mumbai Suburban31-12-2017 00:00:00
Dineshkunj Chs LtdSwastik Realty Pvt Ltd188 Cts No.60730-06-2018 00:00:00
Samarth ResidencyAjay Sitaram Surve560, 1 To 630-12-2022 00:00:00
GharkulAjitkumar Chs LtdMumbai Suburban, 40006331-12-2019 00:00:00
Applaud-38I M Buildcon38A, 18 P30-12-2024 00:00:00
Aether Wing B2 - Phase 1A - Upto 20Th FloorRomell Properties Private Limited175/4, 175/530-12-2023 00:00:00
Svarna KojagiriSvarna Realties LlpCts No 302 Plot No 05 Survey No 9330-12-2021 00:00:00
Hansini EleganceKarsan Bachu SatraCts No 475 475/1-6 Pahadi Goregaon And 116 116/1 Pahadi Eksar31-12-2019 00:00:00
Ashtha Goregaon WestTown Developers41631-12-2019 00:00:00
Sheetal AniketD.G. Land Developers Private Limited400063, Mumbai Suburban31-12-2018 00:00:00
Aspen GardenMessrs. Unique Real Estate DevelopersCts No. 554/A31-12-2018 00:00:00
HorizonJaycee Homes Private Limited400063, Mumbai Suburban31-03-2018 00:00:00
Dridhena Developers And RealtorsDridhena Developers And Realtors662, 662/1 To 528-02-2019 00:00:00
Dharmanath KrupaBali Landmarks Llp679/1 To 679/7, 67931-12-2018 00:00:00
Samruddhi HeightsSavita GajarePahadi Goregaon (West)30-12-2023 00:00:00
Pahhal AvenueUmmang Realtors Llp799/1 To 8, 79931-12-2019 00:00:00
Redevelopment Of Navchandrakunj ChslPranav Constructions LimitedPlot No.42, Cts No.734/A, 734/1 To 630-03-2022 00:00:00
Accord ClassicSuyojana Impex Pvt. Ltd46, 46/1 To 2630-03-2022 00:00:00
Solaris BhagyashreeSolaris Developers Private LimitedMumbai Suburban, 40006331-12-2018 00:00:00
Building On Sub Plot - D, Cts No 101/B Of Village GoregaonSkyline Construction Co.Part Of Sub Plot D Cts No 101 B Of Village Goregaon At Oshiwara District Centre Goregaon W Mumbai31-10-2019 00:00:00
Redevlopment Of Sundresh Chs LtdRaj Corporation27431-12-2017 00:00:00
Siddharth Nagar Abhiman Chs Ltd Building No-25Mumbai Shelter Housing Development Pvt Ltd347 Part31-12-2019 00:00:00
Romell Aether Wing B1Romell Properties Private Limited175/4 And 175/530-12-2021 00:00:00
Yash OrionYash Skyscrapers Private Limited460/4 B30-06-2018 00:00:00
Shivoham HeightsRajputana Heights6851 To 8, 685, 68431-12-2017 00:00:00
Shashikala Premises Co-Operative Society LimitedHeartland Habitats Llp90/714, 714-131-07-2019 00:00:00
VijayagarSkyline Landmark Projects Private Limited31131-12-2022 00:00:00
The AceTanvi Construction Pvt LtdC.T.S. No 496 Pt 496/8 To 17 At Village Pahadi Goregaon I.B Patel Road Goregaon East31-12-2024 00:00:00
Kabra DiamanteKabra And Associates73, 73 / 1 To 6531-12-2025 00:00:00
Aether Wing B2 - Phase 1B - From 21St To 33Rd FloorRomell Properties Private Limited175/5, 175/430-12-2023 00:00:00
Redevelopment Of Mettivilla ChslPranav Constructions LimitedCts No 659 659/1 To 659/530-12-2028 00:00:00
Deep Darshani ChsSarvoday Builders And Developers26, 26 1 To 1530-12-2021 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdCts No 610 A/1B/130-12-2024 00:00:00
Laxmi CallistaLaxmidevi Developers283A01-09-2019 00:00:00
Avant HillwayRaghvendra Construction Company Pvt LtdCts No 610A/1B/230-12-2024 00:00:00
Shiv GangaAnjani Kumar Co Pvt Ltd696, 696/130-06-2023 00:00:00
Mandor Heights Phase-IiA S K Construction Co626 626 1To430-03-2023 00:00:00
Siddharth Nagar Sukhvilla Chs Ltd Phase- 2Dilip Hiralal DoshiPlot No 6 Cts No 350 Part 350/13 To 1630-03-2022 00:00:00
Golden Star Residency Building No 2Arundhati Ajay Kadam1227/7, 1227/630-09-2018 00:00:00
DeshabhimaniSiroyafm Constructions Pvt LtdMumbai Suburban, 40006206-07-2010 00:00:00
GulmoharUdyam Enterprises400063, Mumbai Suburban30-06-2022 00:00:00
Asmi DreamzAjay Malshi Dedhia340 Pt, 33931-03-2018 00:00:00
Viniyog Chs Ltd.Vinayak Developers190, 190/1 To 430-07-2020 00:00:00
AnandiSadhna Global Construction400062, Mumbai Suburban31-12-2017 00:00:00
Regent PalaceSadhna InfrastructuresCts 649, 649/1 To 431-03-2018 00:00:00
Sheetal KundD.G.Land Developers Pvt Ltd365 A 365A 1 To 3 365 B365 C 101-07-2023 00:00:00
ShivshaktiSamarth Erectors & Developers532 D31-12-2018 00:00:00
Bhoomi Samarth A WingSamarth Erectors & Developers532 B/230-12-2021 00:00:00
Kanchan ChslC H Patil And Sons LlpCts No 9731-03-2019 00:00:00
Nirlon Employees Cooperative Housing Society Limited Building No 11, 12 ,13Shivam Parivar Developers Pvt Ltd355 Pt30-12-2024 00:00:00
Bhoomi Samarth B WingSamarth Erectors & Developers532 B/230-06-2024 00:00:00
Empire TowersSahakar Ventures371, 367 B, 66 B, 368 2, 367 A 2, 65 1, 66 1, 372, 65 B, Cts 367 A 1, 66 A, 368, 65 A, 368 1, 605, 370 1, 37030-09-2024 00:00:00
Express Zone MallCello Sonal ConstructionCts No. 1B/1/B/1, Village Dindoshi And 581/C/130-06-2024 00:00:00
Samosaran ApartmentsMahavir Construction Company400062, Mumbai Suburban31-12-2020 00:00:00
RadhakrishnaK.Pateland Co136 A31-12-2017 00:00:00
Siddharth Nagar Swami Vivekanand ChslDhariwal Developers (India) Private Limited353 Part30-12-2026 00:00:00
Siddharth Nagar Siddhivinayak Chs LtdInfinity ConstructionsCts 348/62 To 6531-12-2027 00:00:00
Luxury Chsl LtdLaxmidevi DevelopersBehind Filmistan30-06-2025 00:00:00
Shraddha AvenueAnil WadhareM G Road31-07-2022 00:00:00
Vallabh Krupa ChslGun Rajan Constructions644/A/131-10-2026 00:00:00
Goregaon Matrusmruti ChslMadhu Associates171, 171/1 To 1031-12-2025 00:00:00
Bhoomi Samarth C WingSamarth Erectors & Developers532 B230-06-2025 00:00:00
Ashish Building Of Emticibom Employees Chs LtdKarwa And Kewal Kiran Realtors8362, 8363, 836430-09-2024 00:00:00
New Bhagyashree Chs LtdK. Anand Construction Private LimitedPlot No 43 Cts No 175 1-431-12-2017 00:00:00
Conwood ParagonConsolidated Crop Protection Private LimitedMumbai Suburban, 40006301-07-2020 00:00:00
Om Sai Amrut ChsShree Sai Swami Developers335-1 To 2131-12-2018 00:00:00
VindhyagiriGio PropertiesC.T.S No.- 369C And 369C ( 17 To 21 ) And C.T.S No.- 70/4, Plot No. -525-02-2025 00:00:00
Siddharth Nagar Shivam Chs LtdVirendra Hiralal DoshiCts No 348 Part31-03-2025 00:00:00
Shree Hari EnclaveParesh PatelGoregaon West, Mumbai Suburban31-12-2025 00:00:00
KrishnaK Patel And Co Pvt Ltd383/1To6, 38330-06-2024 00:00:00
Bali LaxmiBali Spaces Llp531 531/1 To 531/930-06-2024 00:00:00
Rajan Dinakar Phatak And OthersWestin Sankalp Developers68/393, 393/1 To 230-06-2024 00:00:00
Astoria Tower BConwood Realty Private Limited158D/1B31-12-2020 00:00:00
Romell Aether Wing B 2-Phase 2 34Th To 39Th FloorsRomell Properties Private Limited175/5, 175/430-12-2025 00:00:00
Un NamedSanjay Fakirchand Garg32628-02-2021 00:00:00
Axiom AvenAxiom Realty Pvt LtdMumbai Suburban31-12-2018 00:00:00
Jaywant Villa Co.Operative Housing Society LtdMahendra SawantMumbai Suburban, 40006330-06-2018 00:00:00
Sector R 3 MhadaGuruashish Construction Private LimitedPlot No R-03 C T S No 22-A 4 Pt31-12-2017 00:00:00
Joseph VillaK.Pateland Co472A31-12-2024 00:00:00
Paras ResidencyAureum Spaces Llp141/A30-09-2025 00:00:00
Vkg CenturionM/S. Frontman Multitrade Pvt. Ltd.Cts No 532 Pt M-131-12-2025 00:00:00
Premleela HeightsPrem Leela DevelopersMumbai Suburban31-12-2015 00:00:00
Jaliyan Heights GoregaonJaliyan Developer237/1 To 1930-12-2022 00:00:00
AshwinSkyline Landmark Projects Private Limited30330-09-2025 00:00:00
Ashwin HeightsWestinrely Developers Pvt Ltd29731-12-2026 00:00:00
Aasamanta Laxmi NarayanAasamanta Realty384 & 384/131-03-2028 00:00:00
Ariha VincereVelstand Realty LlpPlot No. 152 Bearing Cts No. 627, 627/1 -4 And Plot No. 151 Bearing Cts No. 630, 630/1 - 1130-06-2027 00:00:00
RivaanM/S Meghna Infracon Llp275, 275/1 To 275/928-12-2028 00:00:00
Rajputana ResidencyRajputana Residency LlpPlot No 221 Cts No 555 555/1 To 2 Survey No 105 To 110 146 And 14731-12-2028 00:00:00
Arkade ViewsArkade Developers Limited455A31-12-2027 00:00:00
Hanuman Nagar Azad Nagar Sra ChsPratha Constructions532 A (Pt.)31-12-2029 00:00:00
Rekha ChslD S M Group13131-12-2026 00:00:00
VivantaKeyland Developers Private Limited181, 181/1 To 7131-12-2029 00:00:00
63 Rishabraj AvenueRishabraj Infra Llp58730-07-2028 00:00:00
OpulenceAriha Buildtech LlpCts No 446, 447, 447/1 To 14, 448, 448/1 To 23, 449, 449/1 To 22, 450, 450/1 To 22, 451, 451/1 To 25, 452 & 453, 453/1 To 21(Scheme-I)& Cts No 439, 440, 440/1 To 21, 441, 44231-12-2029 00:00:00
SamruddhiShree Sai Bhoomi RealtorsCts No 259, 259/1 To 2231-12-2029 00:00:00
Delta MeadowsDelta Synergy Llp56A ,56B30-06-2027 00:00:00
Project Details
  • Project:
    The Ace
  • Location:
  • C.T.S. No 496 Pt 496/8 To 17 At Village Pahadi Goregaon I.B Patel Road Goregaon East
  • Const. Stage:
    New
  • Possession:
    31 Dec 2024
Developer Details

  • Developer:
    Tanvi Construction Pvt Ltd
  • Phone:
  • Address:
  • Next To Sai Dham Temple
Project RERA Details
MAHA REARA No: P51800030288
Project Type Commercial
RERA Project Status New
Architect Bhavin Modi
Funding Bank KARNATAKA BANK LIMITED
Proposed Possession 31 Dec 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Mar 2025
Last Retrived 26 Jul 2025
The Ace QR Code
The Ace
MahaRERA - P51800030288
Apartment Details & Configuration
TypeArea
Office space37.23 Sq.mts. ( 401 Sq.ft. )
Office space41.1 Sq.mts. ( 442 Sq.ft. )
Office space42.03 Sq.mts. ( 452 Sq.ft. )
Office space42.28 Sq.mts. ( 455 Sq.ft. )
Office space42.31 Sq.mts. ( 455 Sq.ft. )
Office space42.82 Sq.mts. ( 461 Sq.ft. )
Office space43.03 Sq.mts. ( 463 Sq.ft. )
Office space45.57 Sq.mts. ( 491 Sq.ft. )
Office space46.12 Sq.mts. ( 496 Sq.ft. )
Office space48.26 Sq.mts. ( 519 Sq.ft. )
Office space48.31 Sq.mts. ( 520 Sq.ft. )
Office space48.45 Sq.mts. ( 522 Sq.ft. )
Office space48.9 Sq.mts. ( 526 Sq.ft. )
Office space51.72 Sq.mts. ( 557 Sq.ft. )
Office space53.02 Sq.mts. ( 571 Sq.ft. )
Office space56.48 Sq.mts. ( 608 Sq.ft. )
Office space56.84 Sq.mts. ( 612 Sq.ft. )
Office space57.72 Sq.mts. ( 621 Sq.ft. )
Office space60.3 Sq.mts. ( 649 Sq.ft. )
Office space60.34 Sq.mts. ( 649 Sq.ft. )
Office space61.2 Sq.mts. ( 659 Sq.ft. )
Office space61.23 Sq.mts. ( 659 Sq.ft. )
Office space63.04 Sq.mts. ( 679 Sq.ft. )
Office space68.17 Sq.mts. ( 734 Sq.ft. )
Office space71.23 Sq.mts. ( 767 Sq.ft. )
Office space73.58 Sq.mts. ( 792 Sq.ft. )
Office space79.21 Sq.mts. ( 853 Sq.ft. )
Office space89.54 Sq.mts. ( 964 Sq.ft. )
Office space110.27 Sq.mts. ( 1187 Sq.ft. )
Office space122.97 Sq.mts. ( 1324 Sq.ft. )
Office space137.15 Sq.mts. ( 1476 Sq.ft. )
Office space145.05 Sq.mts. ( 1561 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Acelast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Project Is Under Construction Stage
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Project Is Under Construction Stage
Energy management
Project Is Under Construction Stage
Fire Protection And Fire Safety Requirements
Project Is Under Construction Stage
Landscaping & Tree Planting
Project Is Under Construction Stage
Open Parking
Project Is Under Construction Stage
Sewerage (Chamber, Lines, Septic Tank , STP)
Project Is Under Construction Stage
Solid Waste Management And Disposal
Project Is Under Construction Stage
Storm Water Drains
Project Is Under Construction Stage
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Project Is Under Construction Stage
Water Supply
Project Is Under Construction Stage
Buildings / Wings in The Ace
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Ace by Tanvi Construction Pvt Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

37276 Sq. ft.

Project Area

4648 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

99 apartments in total
Total
99
Booked
0
Available
99

Saleable Area Statistics (Sq. ft.)

59258 Total
Total
59258
Booked
0
Available
59258
Total 99 apartments in project. 0 apartments booked. 0% apartments booked.
Total 59258 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

V-Protein

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
V-ProteinDec 20241411133673
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Office space37.23 Sq.mts. ( 401 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space41.1 Sq.mts. ( 442 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.03 Sq.mts. ( 452 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space42.28 Sq.mts. ( 455 Sq.ft. )16
None Booked0% Booked
0% Booked
Office space42.31 Sq.mts. ( 455 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space42.82 Sq.mts. ( 461 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space43.03 Sq.mts. ( 463 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space45.57 Sq.mts. ( 491 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space46.12 Sq.mts. ( 496 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space48.26 Sq.mts. ( 519 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space48.31 Sq.mts. ( 520 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space48.45 Sq.mts. ( 522 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space48.9 Sq.mts. ( 526 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space51.72 Sq.mts. ( 557 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space53.02 Sq.mts. ( 571 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space56.48 Sq.mts. ( 608 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space56.84 Sq.mts. ( 612 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space57.72 Sq.mts. ( 621 Sq.ft. )8
None Booked0% Booked
0% Booked
Office space60.3 Sq.mts. ( 649 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space60.34 Sq.mts. ( 649 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space61.2 Sq.mts. ( 659 Sq.ft. )9
None Booked0% Booked
0% Booked
Office space61.23 Sq.mts. ( 659 Sq.ft. )7
None Booked0% Booked
0% Booked
Office space63.04 Sq.mts. ( 679 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space68.17 Sq.mts. ( 734 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space71.23 Sq.mts. ( 767 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space73.58 Sq.mts. ( 792 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space79.21 Sq.mts. ( 853 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space89.54 Sq.mts. ( 964 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space110.27 Sq.mts. ( 1187 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space122.97 Sq.mts. ( 1324 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space137.15 Sq.mts. ( 1476 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space145.05 Sq.mts. ( 1561 Sq.ft. )1
None Booked0% Booked
0% Booked
99 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building V-ProteinCompletion
Basement (if any)
work-in-progress80% done
80% Booked
Excavation
work-in-progress80% done
80% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress80% done
80% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress36% done
36% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress80% done
80% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress36% done
36% Booked
Channel Partners
Channel Partners Registered by Developer
Tanvi Construction Pvt Ltd
for Project
The Ace
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation