Project overview

V-Aqua Villa And Apartment is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000014510. V-Aqua Villa And Apartment is located at Palghar, 401403, Saye. This is a New Project being developed by V Life Spaces And Infra Developers Private Limited.

V-Aqua Villa And Apartment has RESIDENTIAL Apartments with carpet areas ranging from 1229 to 1229 Sq.ft. Carpet. The Project has total 31 of which 31 are currently available for sale.

V-Aqua Villa And Apartment is being developed on a total land area of 43400 Sq.ft. V-Aqua Villa And Apartment has 5 Wings / Towers Apartment A1,Garden Row House R2,Poolside Row House R3,Riverside Row House R1,Villa V1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    V-Aqua Villa And Apartment
  • Location:
  • Palghar, 401403, Saye
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    V Life Spaces And Infra Developers Private Limited
  • Phone:
  • Address:
  • 333 334 335, Raghuleela Mall, 1St Floor, Kandivali West Mumbai, Behind Poisor Depot, 400067
Project RERA Details
MAHA REARA No: P99000014510
Project Type Residential
RERA Project Status New Project
Funding Bank AXIS BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 30 Jan 2019
Last Retrived 28 Jul 2025
V-Aqua Villa And Apartment QR Code
V-Aqua Villa And Apartment
MahaRERA - P99000014510
Apartment Details & Configuration
TypeArea
RESIDENTIAL41.06 Sq.mts. ( 442 Sq.ft. )
RESIDENTIAL111.7 Sq.mts. ( 1202 Sq.ft. )
RESIDENTIAL131.24 Sq.mts. ( 1413 Sq.ft. )
RESIDENTIAL108.3 Sq.mts. ( 1166 Sq.ft. )
RESIDENTIAL114.14 Sq.mts. ( 1229 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of V-Aqua Villa And Apartmentlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
0
Energy management
0
Fire Protection And Fire Safety Requirements
0
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
0
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
0
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
0
Water Supply
0
Buildings / Wings in V-Aqua Villa And Apartment
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of V-Aqua Villa And Apartment by V Life Spaces And Infra Developers Private Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

43400 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

31 apartments in total
Total
31
Booked
0
Available
31

Saleable Area Statistics (Sq. ft.)

29017 Total
Total
29017
Booked
0
Available
29017
Total 31 apartments in project. 0 apartments booked. 0% apartments booked.
Total 29017 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Apartment A1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Apartment A1Jan 190042000180
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL41.06 Sq.mts. ( 442 Sq.ft. )12
None Booked0% Booked
0% Booked
12 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Apartment A1Completion
Excavation
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Garden Row House R2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Garden Row House R2Jan 19002100020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL111.7 Sq.mts. ( 1202 Sq.ft. )2
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Garden Row House R2Completion
Excavation
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Poolside Row House R3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Poolside Row House R3Jan 19003100040
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL131.24 Sq.mts. ( 1413 Sq.ft. )4
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Poolside Row House R3Completion
Excavation
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Riverside Row House R1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Riverside Row House R1Jan 19003100060
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL108.3 Sq.mts. ( 1166 Sq.ft. )5
None Booked0% Booked
0% Booked
5 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Riverside Row House R1Completion
Excavation
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Villa V1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Villa V1Jan 19004200080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL114.14 Sq.mts. ( 1229 Sq.ft. )8
None Booked0% Booked
0% Booked
8 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Villa V1Completion
Excavation
work-in-progress30% done
30% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
V Life Spaces And Infra Developers Private Limited
for Project
V-Aqua Villa And Apartment
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation