Project overview

Unimont Imperia is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000022177. Unimont Imperia is located at Cts No. 3528/1 To 3528/5 And 3530/2 Of Village Varose. This is a New being developed by Rsm Designers.

Unimont Imperia has 1 BHK & 2 BHK Apartments with carpet areas ranging from 292 to 545 Sq.ft. Carpet. The Project has total 646 of which 452 are currently available for sale.

Unimont Imperia is being developed on a total land area of 140664 Sq.ft. out of which 14833 Sq.ft. i.e 11% is reserved for recreational purposes. Unimont Imperia has 5 Wings / Towers Wing A - Residential Cum Commercial,Wing B - Residential,Wing C- Residential,Wing D - Residential,Wing E - Residential

ProjectDeveloperLocationPossession
Raghunath Vihar Phase 1Trust BuildconCts 3009 Sn 2 Hn 231-07-2023 00:00:00
Mountain View Residency 2Immaculate Developers2486/2487/2488/230-03-2025 00:00:00
Mountain View Residency 1Immaculate Developers2486/2487/2488/130-03-2025 00:00:00
Khopoli Business CentreRajendra Ramvilas JakhotiaCts No. 3816 To 382731-12-2030 00:00:00
Vimal ApartmentDevesh Vasant PatilPlot No.11 ,Survey No 33A/4D, C.T.S. No. 167201-04-2028 00:00:00
Kalyanji CallistaB.Kalyanji Realty497130-04-2025 00:00:00
Ashiyana Infinity Phase 2Ashiyana Dream Homes Pvt. Ltd.2475A 2476A 3077A 3054A1 2 3 Survey No 9 10 H No 3C 1 3B 2 3A 1 1A 131-12-2027 00:00:00
Ashiyana Tower Building No 2Ateeque Yusuf KhotCts No 3978 - 3981, 3894 - 389931-12-2023 00:00:00
Project Details
  • Project:
    Unimont Imperia
  • Location:
  • Cts No. 3528/1 To 3528/5 And 3530/2 Of Village Varose
  • Const. Stage:
    New
  • Possession:
    28 Aug 2026
Developer Details

  • Developer:
    Rsm Designers
  • Phone:
  • Address:
  • Satra Plaza
Project RERA Details
MAHA REARA No: P52000022177
Project Type Others
RERA Project Status New
Architect Destination Architecture Interior Designs
Funding Bank STATE BANK OF INDIA
Proposed Possession 28 Aug 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2023
Last Retrived 28 Jul 2025
Unimont Imperia QR Code
Unimont Imperia
MahaRERA - P52000022177
Apartment Details & Configuration
TypeArea
1 BHK31.26 Sq.mts. ( 336 Sq.ft. )
1 BHK35.08 Sq.mts. ( 378 Sq.ft. )
1 BHK35.54 Sq.mts. ( 383 Sq.ft. )
1 BHK42.1 Sq.mts. ( 453 Sq.ft. )
2 BHK52.79 Sq.mts. ( 568 Sq.ft. )
2 BHK55.33 Sq.mts. ( 596 Sq.ft. )
2 BHK58.33 Sq.mts. ( 628 Sq.ft. )
3 BHK72.69 Sq.mts. ( 782 Sq.ft. )
Office space21.73 Sq.mts. ( 234 Sq.ft. )
Office space10.73 Sq.mts. ( 115 Sq.ft. )
Office space14.3 Sq.mts. ( 154 Sq.ft. )
Office space19.39 Sq.mts. ( 209 Sq.ft. )
Shop19.8 Sq.mts. ( 213 Sq.ft. )
Shop13.89 Sq.mts. ( 150 Sq.ft. )
Shop36.55 Sq.mts. ( 393 Sq.ft. )
Shop24.89 Sq.mts. ( 268 Sq.ft. )
Shop26.73 Sq.mts. ( 288 Sq.ft. )
Shop52.04 Sq.mts. ( 560 Sq.ft. )
1 BHK27.8 Sq.mts. ( 299 Sq.ft. )
1 BHK28.08 Sq.mts. ( 302 Sq.ft. )
1 BHK30.28 Sq.mts. ( 326 Sq.ft. )
1 BHK31.64 Sq.mts. ( 341 Sq.ft. )
2 BHK39.81 Sq.mts. ( 429 Sq.ft. )
2 BHK40.48 Sq.mts. ( 436 Sq.ft. )
2 BHK49.29 Sq.mts. ( 531 Sq.ft. )
2 BHK51.24 Sq.mts. ( 552 Sq.ft. )
1 BHK29.97 Sq.mts. ( 323 Sq.ft. )
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )
1 BHK34.05 Sq.mts. ( 367 Sq.ft. )
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )
2 BHK46.36 Sq.mts. ( 499 Sq.ft. )
1 BHK27.33 Sq.mts. ( 294 Sq.ft. )
1 BHK27.35 Sq.mts. ( 294 Sq.ft. )
1 BHK29.55 Sq.mts. ( 318 Sq.ft. )
1 BHK31.57 Sq.mts. ( 340 Sq.ft. )
2 BHK39.76 Sq.mts. ( 428 Sq.ft. )
1 BHK27.17 Sq.mts. ( 292 Sq.ft. )
1 BHK29.4 Sq.mts. ( 316 Sq.ft. )
1 BHK31.16 Sq.mts. ( 335 Sq.ft. )
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )
2 BHK35.36 Sq.mts. ( 381 Sq.ft. )
2 BHK50.66 Sq.mts. ( 545 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Unimont Imperialast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
1378.20
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Commenced. Will Be Provided As Per Msedcl Norm
Energy management
Not Commenced.Will Be Provided As Per Mc Norms.
Fire Protection And Fire Safety Requirements
Not Commenced.Will Be Provided As Per Cfo Noc.
Landscaping & Tree Planting
Not Commenced.Will Be Provided As Per Mc Norms.
Open Parking
70
Sewerage (Chamber, Lines, Septic Tank , STP)60% completed
60% Complete
Commenced.Will Be Provided As Per Mc Norms.
SOCIETY OFFICE MULTIPURPOSE HALL FITNESS CENTRE INDOOR GAMES SWIMMING POOL BADMINTON COURT25% completed
25% Complete
Commenced. Will Be Provided As Per Plans
Solid Waste Management And Disposal
Not Commenced. Will Be Provided As Per Mc Norms.
Storm Water Drains20% completed
20% Complete
Commenced.Will Be Provided As Per Mc Norms.
Street Lighting
Not Commenced.Will Be Provided As Per Mc Norms.
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting80% completed
80% Complete
Commenced.Will Be Provided As Per Mc Norms.
Water Supply
Not Commenced. Will Be Provided As Per Mc Norms.
Buildings / Wings in Unimont Imperia
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Unimont Imperia by Rsm Designerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

140664 Sq. ft.

Project Area

14833 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

646 apartments in total
Total
646
Booked
194
Available
452

Saleable Area Statistics (Sq. ft.)

252001 Total
Total
252001
Booked
65841
Available
186160
Total 646 apartments in project. 194 apartments booked. 30% apartments booked.
Total 252001 Sq.ft. saleable area. 65841 saleable area booked.
26% area booked.

Wing A - Residential Cum Commercial

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A - Residential Cum CommercialAug 202513101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.26 Sq.mts. ( 336 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK35.08 Sq.mts. ( 378 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK35.54 Sq.mts. ( 383 Sq.ft. )26
None Booked0% Booked
0% Booked
1 BHK42.1 Sq.mts. ( 453 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK52.79 Sq.mts. ( 568 Sq.ft. )14
None Booked0% Booked
0% Booked
2 BHK55.33 Sq.mts. ( 596 Sq.ft. )29
None Booked0% Booked
0% Booked
2 BHK58.33 Sq.mts. ( 628 Sq.ft. )53
None Booked0% Booked
0% Booked
3 BHK72.69 Sq.mts. ( 782 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space21.73 Sq.mts. ( 234 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space10.73 Sq.mts. ( 115 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space14.3 Sq.mts. ( 154 Sq.ft. )2
None Booked0% Booked
0% Booked
Office space19.39 Sq.mts. ( 209 Sq.ft. )6
None Booked0% Booked
0% Booked
Shop19.8 Sq.mts. ( 213 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop13.89 Sq.mts. ( 150 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop36.55 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.89 Sq.mts. ( 268 Sq.ft. )12
10 Booked83% Booked
83% Booked
Shop26.73 Sq.mts. ( 288 Sq.ft. )2
2 Booked100% Booked
100% Booked
Shop52.04 Sq.mts. ( 560 Sq.ft. )1
1 Booked100% Booked
100% Booked
206 total apartments / 16 apartments booked. 7% apartments booked.
Work Description in Building Wing A - Residential Cum CommercialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress27% done
27% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress26% done
26% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B - Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - ResidentialAug 202513101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.8 Sq.mts. ( 299 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK28.08 Sq.mts. ( 302 Sq.ft. )22
None Booked0% Booked
0% Booked
1 BHK30.28 Sq.mts. ( 326 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK31.64 Sq.mts. ( 341 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK39.81 Sq.mts. ( 429 Sq.ft. )36
None Booked0% Booked
0% Booked
2 BHK40.48 Sq.mts. ( 436 Sq.ft. )12
4 Booked33% Booked
33% Booked
2 BHK49.29 Sq.mts. ( 531 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK51.24 Sq.mts. ( 552 Sq.ft. )2
None Booked0% Booked
0% Booked
96 total apartments / 4 apartments booked. 4% apartments booked.
Work Description in Building Wing B - ResidentialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress74% done
74% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress64% done
64% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C- Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing C- ResidentialAug 202513101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.08 Sq.mts. ( 302 Sq.ft. )22
9 Booked40% Booked
40% Booked
1 BHK29.97 Sq.mts. ( 323 Sq.ft. )48
18 Booked37% Booked
37% Booked
1 BHK30.28 Sq.mts. ( 326 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )22
9 Booked40% Booked
40% Booked
1 BHK34.05 Sq.mts. ( 367 Sq.ft. )12
None Booked0% Booked
0% Booked
2 BHK37.34 Sq.mts. ( 402 Sq.ft. )24
12 Booked50% Booked
50% Booked
2 BHK46.36 Sq.mts. ( 499 Sq.ft. )4
None Booked0% Booked
0% Booked
136 total apartments / 48 apartments booked. 35% apartments booked.
Work Description in Building Wing C- ResidentialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress87% done
87% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress72% done
72% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing D - Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing D - ResidentialAug 202513101101
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.33 Sq.mts. ( 294 Sq.ft. )12
10 Booked83% Booked
83% Booked
1 BHK27.35 Sq.mts. ( 294 Sq.ft. )24
17 Booked70% Booked
70% Booked
1 BHK29.55 Sq.mts. ( 318 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK31.57 Sq.mts. ( 340 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK39.76 Sq.mts. ( 428 Sq.ft. )23
20 Booked86% Booked
86% Booked
2 BHK51.24 Sq.mts. ( 552 Sq.ft. )4
2 Booked50% Booked
50% Booked
69 total apartments / 51 apartments booked. 73% apartments booked.
Work Description in Building Wing D - ResidentialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress23% done
23% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing E - Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing E - ResidentialAug 202513101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.17 Sq.mts. ( 292 Sq.ft. )24
14 Booked58% Booked
58% Booked
1 BHK29.4 Sq.mts. ( 316 Sq.ft. )24
13 Booked54% Booked
54% Booked
1 BHK31.16 Sq.mts. ( 335 Sq.ft. )4
2 Booked50% Booked
50% Booked
1 BHK31.54 Sq.mts. ( 339 Sq.ft. )48
31 Booked64% Booked
64% Booked
1 BHK33.48 Sq.mts. ( 360 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK34.05 Sq.mts. ( 367 Sq.ft. )7
4 Booked57% Booked
57% Booked
2 BHK35.36 Sq.mts. ( 381 Sq.ft. )24
11 Booked45% Booked
45% Booked
2 BHK50.66 Sq.mts. ( 545 Sq.ft. )4
None Booked0% Booked
0% Booked
139 total apartments / 75 apartments booked. 53% apartments booked.
Work Description in Building Wing E - ResidentialCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Rsm Designers
for Project
Unimont Imperia
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation