Project overview

Umiya Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007983. Umiya Residency is located at Ganeshmandir Road. This is a On-Going Project being developed by Patidar Developers.

Umiya Residency has Others Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 52 of which 44 are currently available for sale.

Umiya Residency is being developed on a total land area of 31216 Sq.ft. out of which 4596 Sq.ft. i.e 15% is reserved for recreational purposes. Umiya Residency has 3 Wings / Towers Building No 1,Building No 2,Building No 3

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Umiya Residency
  • Location:
  • Ganeshmandir Road
  • Const. Stage:
    On-Going Project
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Patidar Developers
  • Phone:
  • Address:
  • 112,, Vasudev Laxmi Chs.,, Kelkar Road,, Near Pooja Madhuban Talkies, Dombivli East, 421201
Project RERA Details
MAHA REARA No: P51700007983
Project Type Residential
RERA Project Status On-Going Project
Architect Sandip S Paranjape
Funding Bank IDBI BANK
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2023
Extended Possession 31 Dec 2025
Litigations No Litigations
Last Modified 07 Mar 2024
Last Retrived 28 Jul 2025
Umiya Residency QR Code
Umiya Residency
MahaRERA - P51700007983
Apartment Details & Configuration
TypeArea
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK35.52 Sq.mts. ( 382 Sq.ft. )
1 BHK36.98 Sq.mts. ( 398 Sq.ft. )
1 BHK38.04 Sq.mts. ( 409 Sq.ft. )
1 BHK39.59 Sq.mts. ( 426 Sq.ft. )
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )
1 BHK41.73 Sq.mts. ( 449 Sq.ft. )
1 BHK42.87 Sq.mts. ( 461 Sq.ft. )
1RK29.87 Sq.mts. ( 322 Sq.ft. )
2 BHK52.51 Sq.mts. ( 565 Sq.ft. )
Shop26.94 Sq.mts. ( 290 Sq.ft. )
Shop45.04 Sq.mts. ( 485 Sq.ft. )
Others0 Sq.mts. ( 0 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Umiya Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Done For Bldg 2 And 3
CCTV Cameras in Entry Area70% completed
70% Complete
Na
Community Buildings
To Be Providfor Bldg 1
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
To Be Providfor Bldg 1
Energy management70% completed
70% Complete
To Be Providfor Bldg 1
Fire Protection And Fire Safety Requirements
Work Done For Bldg 2 And 3
Landscaping & Tree Planting70% completed
70% Complete
Na
Open Parking
To Be Providfor Bldg 1
Sewerage (Chamber, Lines, Septic Tank , STP)70% completed
70% Complete
To Be Providfor Bldg 1
Solid Waste Management And Disposal
To Be Providfor Bldg 1
Storm Water Drains70% completed
70% Complete
Not Yet Started
Street Lighting
Work Done For Bldg 2 And 3
Treatment And Disposal Of Sewage And Sullage Water
Work Done For Bldg 2 And 3
Water Conservation, Rain water Harvesting70% completed
70% Complete
Work Done For Bldg 2 And 3
Water Supply70% completed
70% Complete
Work Done For Bldg 2 And 3
Buildings / Wings in Umiya Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Umiya Residency by Patidar Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

31216 Sq. ft.

Project Area

4596 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

52 apartments in total
Total
52
Booked
8
Available
44

Saleable Area Statistics (Sq. ft.)

22720 Total
Total
22720
Booked
3954
Available
18766
Total 52 apartments in project. 8 apartments booked. 15% apartments booked.
Total 22720 Sq.ft. saleable area. 3954 saleable area booked.
17% area booked.

Building No 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 1Jun 20233000020
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.52 Sq.mts. ( 382 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.98 Sq.mts. ( 398 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK38.04 Sq.mts. ( 409 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK39.59 Sq.mts. ( 426 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK39.76 Sq.mts. ( 428 Sq.ft. )7
None Booked0% Booked
0% Booked
1 BHK41.73 Sq.mts. ( 449 Sq.ft. )7
1 BHK42.87 Sq.mts. ( 461 Sq.ft. )7
2 Booked28% Booked
28% Booked
1RK29.87 Sq.mts. ( 322 Sq.ft. )5
1 Booked20% Booked
20% Booked
2 BHK52.51 Sq.mts. ( 565 Sq.ft. )7
4 Booked57% Booked
57% Booked
Shop26.94 Sq.mts. ( 290 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop45.04 Sq.mts. ( 485 Sq.ft. )1
None Booked0% Booked
0% Booked
52 total apartments / 8 apartments booked. 15% apartments booked.
Work Description in Building Building No 1Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress40% done
40% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress40% done
40% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 2Jun 20234100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Others0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 2Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure

Building No 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 3Jun 20227100050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
Others0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building Building No 3Completion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Patidar Developers
for Project
Umiya Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation