Project overview
Umiya Dham is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007114. Umiya Dham is located at Valivli. This is a On-Going Project being developed by Shree Mangalmurti Developers.
Umiya Dham has RESIDENCY Apartments with carpet areas ranging from 316 to 448 Sq.ft. Carpet. The Project has total 78 of which 21 are currently available for sale.
Umiya Dham is being developed on a total land area of 54681 Sq.ft. out of which 4262 Sq.ft. i.e 8% is reserved for recreational purposes. Umiya Dham has 3 Wings / Towers A,A1,B
| Project | Developer | Location | Possession |
| Shashwat Park | Modern Construction | Gat No. 65 Hissa No. 2V | 31-12-2018 00:00:00 |
| Sadguru Harmony Ph-1 Wing A | Sadguru Associate | Gut No 219/1/2 218 | 31-12-2019 00:00:00 |
| Shivam Complex Wing D And E | Umiya Enterprises | S No 105A H No 22P | 30-09-2018 00:00:00 |
-
Project:
Umiya Dham
-
Location:
-
Valivli
-
Const. Stage:
On-Going Project
-
Possession:
31 Jul 2019
-
Developer:
Shree Mangalmurti Developers
-
Phone:
-
Address:
-
D/101, Umiya Dham, Ambernath Barvi Dem Road, Jalaramdham, Valavali Gaon, 421503
| MAHA REARA No: |
P51700007114 |
| Project Type |
Residential |
| RERA Project Status |
On-Going Project |
| Architect |
Raj Associates Partner Sandhya R Khanbayat |
| Funding Bank |
AXIS BANK |
| Proposed Possession |
31 Jul 2019 |
| Revised Possession |
31 Jul 2022 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
23 Dec 2021 |
| Last Retrived |
28 Jul 2025 |
Umiya Dham QR Code
Umiya Dham
MahaRERA - P51700007114
| Type | Area |
| RESIDENCY | 28.45 Sq.mts. ( 306 Sq.ft. ) |
| RESIDENCY | 29.11 Sq.mts. ( 313 Sq.ft. ) |
| RESIDENCY | 29.53 Sq.mts. ( 318 Sq.ft. ) |
| RESIDNCY | 27.49 Sq.mts. ( 296 Sq.ft. ) |
| SHOP | 8.31 Sq.mts. ( 89 Sq.ft. ) |
| SHOP | 9.94 Sq.mts. ( 107 Sq.ft. ) |
| SHOP | 13.44 Sq.mts. ( 145 Sq.ft. ) |
| RESIDENCY | 38.28 Sq.mts. ( 412 Sq.ft. ) |
| RESIDENCY | 39.42 Sq.mts. ( 424 Sq.ft. ) |
| SHOP | 8.82 Sq.mts. ( 95 Sq.ft. ) |
| SHOP | 10.74 Sq.mts. ( 116 Sq.ft. ) |
| RESIDENCY | 29.39 Sq.mts. ( 316 Sq.ft. ) |
| RESIDENCY | 32.4 Sq.mts. ( 349 Sq.ft. ) |
| RESIDENCY | 41.64 Sq.mts. ( 448 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Umiya Dhamlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
O.S Area 395.95 Work Yet Not Started |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station80% completed
|
|
Meter Room Provided Work Partly Completed |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements
|
|
Na |
Landscaping & Tree Planting50% completed
|
|
Partly Tree Planting Completed |
|
|
|
As Per Plan Work As Not Started |
Sewerage (Chamber, Lines, Septic Tank , STP)60% completed
|
|
Septic Tank Only Work Completed |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Work Yet Not Started |
Street Lighting50% completed
|
|
Internal Light Completed |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Rain Water Harvesting Work Not Started |
|
|
|
Mjp Will Provided Water Connection After O.C. |
Buildings / Wings in Umiya Dham
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Umiya Dham by Shree Mangalmurti Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
78
apartments in total
Saleable Area Statistics (Sq. ft.)
22795
Total
Total 78 apartments in project. 57 apartments booked. 73% apartments booked.
Total 22795 Sq.ft. saleable area. 16320 saleable area booked.
72% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A | Jul 2021 | 6 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENCY | 28.45 Sq.mts. ( 306 Sq.ft. ) | 6 | |
| RESIDENCY | 29.11 Sq.mts. ( 313 Sq.ft. ) | 5 | |
| RESIDENCY | 29.53 Sq.mts. ( 318 Sq.ft. ) | 15 | |
| RESIDNCY | 27.49 Sq.mts. ( 296 Sq.ft. ) | 5 | |
| SHOP | 8.31 Sq.mts. ( 89 Sq.ft. ) | 3 | |
| SHOP | 9.94 Sq.mts. ( 107 Sq.ft. ) | 3 | |
| SHOP | 13.44 Sq.mts. ( 145 Sq.ft. ) | 3 | |
40 total apartments / 39 apartments booked. 97% apartments booked. |
| Work Description in Building A | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| A1 | Jan 1900 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENCY | 29.53 Sq.mts. ( 318 Sq.ft. ) | 4 | |
| RESIDENCY | 38.28 Sq.mts. ( 412 Sq.ft. ) | 4 | |
| RESIDENCY | 39.42 Sq.mts. ( 424 Sq.ft. ) | 4 | |
| SHOP | 8.31 Sq.mts. ( 89 Sq.ft. ) | 1 | |
| SHOP | 8.82 Sq.mts. ( 95 Sq.ft. ) | 1 | |
| SHOP | 9.94 Sq.mts. ( 107 Sq.ft. ) | 2 | |
| SHOP | 10.74 Sq.mts. ( 116 Sq.ft. ) | 1 | |
| SHOP | 13.44 Sq.mts. ( 145 Sq.ft. ) | 2 | |
19 total apartments / 2 apartments booked. 10% apartments booked. |
| Work Description in Building A1 | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| B | Jul 2021 | 5 | 1 | 0 | 0 | 0 | 0 | 0 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| RESIDENCY | 29.39 Sq.mts. ( 316 Sq.ft. ) | 10 | |
| RESIDENCY | 32.4 Sq.mts. ( 349 Sq.ft. ) | 5 | |
| RESIDENCY | 41.64 Sq.mts. ( 448 Sq.ft. ) | 4 | |
19 total apartments / 16 apartments booked. 84% apartments booked. |
| Work Description in Building B | Completion |
| Excavation | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Shree Mangalmurti Developers
for Project
Umiya Dham
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |