Project overview

Umiya Darshan is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700008860. Umiya Darshan is located at S No 140 H No 1B, Valivali, Badlapur. This is a Ongoing being developed by Shree Umiya Group.

Umiya Darshan has RESIDENTIAL Apartments with carpet areas ranging from 233 to 391 Sq.ft. Carpet. The Project has total 124 of which 31 are currently available for sale.

Umiya Darshan is being developed on a total land area of 41872 Sq.ft. Umiya Darshan has 2 Wings / Towers Wing A,Wing B

ProjectDeveloperLocationPossession
Shashwat ParkModern ConstructionGat No. 65 Hissa No. 2V31-12-2018 00:00:00
Sadguru Harmony Ph-1 Wing ASadguru AssociateGut No 219/1/2 21831-12-2019 00:00:00
Shivam Complex Wing D And EUmiya EnterprisesS No 105A H No 22P30-09-2018 00:00:00
Project Details
  • Project:
    Umiya Darshan
  • Location:
  • S No 140 H No 1B, Valivali, Badlapur
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Shree Umiya Group
  • Phone:
  • Address:
  • Umiya Darshan
Project RERA Details
MAHA REARA No: P51700008860
Project Type Others
RERA Project Status Ongoing
Architect Raj Associates
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession 30 Jun 2019
Litigations No Litigations
Last Modified 31 Oct 2018
Last Retrived 26 Jul 2025
Umiya Darshan QR Code
Umiya Darshan
MahaRERA - P51700008860
Apartment Details & Configuration
TypeArea
COMMERCIAL6.4 Sq.mts. ( 69 Sq.ft. )
COMMERCIAL6.93 Sq.mts. ( 75 Sq.ft. )
COMMERCIAL8.86 Sq.mts. ( 95 Sq.ft. )
COMMERCIAL9.35 Sq.mts. ( 101 Sq.ft. )
COMMERCIAL11.43 Sq.mts. ( 123 Sq.ft. )
COMMERCIAL11.47 Sq.mts. ( 123 Sq.ft. )
COMMERCIAL11.61 Sq.mts. ( 125 Sq.ft. )
COMMERCIAL12.25 Sq.mts. ( 132 Sq.ft. )
COMMERCIAL15.83 Sq.mts. ( 170 Sq.ft. )
COMMERCIAL16.01 Sq.mts. ( 172 Sq.ft. )
COMMERCIAL17.83 Sq.mts. ( 192 Sq.ft. )
RESIDENTIAL22.3 Sq.mts. ( 240 Sq.ft. )
RESIDENTIAL22.32 Sq.mts. ( 240 Sq.ft. )
RESIDENTIAL25.8 Sq.mts. ( 278 Sq.ft. )
RESIDENTIAL29.08 Sq.mts. ( 313 Sq.ft. )
RESIDENTIAL30.2 Sq.mts. ( 325 Sq.ft. )
RESIDENTIAL31.23 Sq.mts. ( 336 Sq.ft. )
RESIDENTIAL38.87 Sq.mts. ( 418 Sq.ft. )
RESIDENTIAL43.46 Sq.mts. ( 468 Sq.ft. )
RESIDENTIAL21.61 Sq.mts. ( 233 Sq.ft. )
RESIDENTIAL21.66 Sq.mts. ( 233 Sq.ft. )
RESIDENTIAL22.18 Sq.mts. ( 239 Sq.ft. )
RESIDENTIAL25.56 Sq.mts. ( 275 Sq.ft. )
RESIDENTIAL25.95 Sq.mts. ( 279 Sq.ft. )
RESIDENTIAL27.26 Sq.mts. ( 293 Sq.ft. )
RESIDENTIAL28.33 Sq.mts. ( 305 Sq.ft. )
RESIDENTIAL31.31 Sq.mts. ( 337 Sq.ft. )
RESIDENTIAL36.36 Sq.mts. ( 391 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Umiya Darshanlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Work Has Been Completed
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Work Has Been Completed
Energy management100% completed
95% Complete
Solar Panel Work Has Been Completed
Fire Protection And Fire Safety Requirements90% completed
90% Complete
Work In Progress
Landscaping & Tree Planting100% completed
95% Complete
Work Has Been Completed
Open Parking100% completed
95% Complete
As Per Plan Work Has Been Completed
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Septy Tank Work Completed
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Work Has Been Completed
Street Lighting100% completed
95% Complete
Work Has Been Completed
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Work Has Been Completed
Water Supply
Mjp Will Provide Water Supply After Oc
Buildings / Wings in Umiya Darshan
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Umiya Darshan by Shree Umiya Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

41872 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

124 apartments in total
Total
124
Booked
93
Available
31

Saleable Area Statistics (Sq. ft.)

36450 Total
Total
36450
Booked
28649
Available
7802
Total 124 apartments in project. 93 apartments booked. 75% apartments booked.
Total 36450 Sq.ft. saleable area. 28649 saleable area booked.
79% area booked.

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing AJun 20189110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL6.4 Sq.mts. ( 69 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL6.93 Sq.mts. ( 75 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL8.86 Sq.mts. ( 95 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL9.35 Sq.mts. ( 101 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL11.43 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL11.47 Sq.mts. ( 123 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL11.61 Sq.mts. ( 125 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL12.25 Sq.mts. ( 132 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL15.83 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL16.01 Sq.mts. ( 172 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL17.83 Sq.mts. ( 192 Sq.ft. )1
None Booked0% Booked
0% Booked
RESIDENTIAL22.3 Sq.mts. ( 240 Sq.ft. )7
5 Booked71% Booked
71% Booked
RESIDENTIAL22.32 Sq.mts. ( 240 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL25.8 Sq.mts. ( 278 Sq.ft. )7
7 Booked100% Booked
100% Booked
RESIDENTIAL29.08 Sq.mts. ( 313 Sq.ft. )1
1 Booked100% Booked
100% Booked
RESIDENTIAL30.2 Sq.mts. ( 325 Sq.ft. )8
8 Booked100% Booked
100% Booked
RESIDENTIAL31.23 Sq.mts. ( 336 Sq.ft. )15
12 Booked80% Booked
80% Booked
RESIDENTIAL38.87 Sq.mts. ( 418 Sq.ft. )7
6 Booked85% Booked
85% Booked
RESIDENTIAL43.46 Sq.mts. ( 468 Sq.ft. )7
5 Booked71% Booked
71% Booked
71 total apartments / 50 apartments booked. 70% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress90% done
90% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress90% done
90% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress79% done
79% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BJun 20189110000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
RESIDENTIAL21.61 Sq.mts. ( 233 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL21.66 Sq.mts. ( 233 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL22.18 Sq.mts. ( 239 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL25.56 Sq.mts. ( 275 Sq.ft. )5
5 Booked100% Booked
100% Booked
RESIDENTIAL25.95 Sq.mts. ( 279 Sq.ft. )8
6 Booked75% Booked
75% Booked
RESIDENTIAL27.26 Sq.mts. ( 293 Sq.ft. )8
7 Booked87% Booked
87% Booked
RESIDENTIAL28.33 Sq.mts. ( 305 Sq.ft. )5
3 Booked60% Booked
60% Booked
RESIDENTIAL31.31 Sq.mts. ( 337 Sq.ft. )3
3 Booked100% Booked
100% Booked
RESIDENTIAL36.36 Sq.mts. ( 391 Sq.ft. )8
5 Booked62% Booked
62% Booked
53 total apartments / 43 apartments booked. 81% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress60% done
60% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress80% done
80% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Shree Umiya Group
for Project
Umiya Darshan
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation