Project overview

Uma Kunj Cooperative Housing Society Limited is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700033015. Uma Kunj Cooperative Housing Society Limited is located at Survey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B. This is a New being developed by Pravin Arvind Apte.

Uma Kunj Cooperative Housing Society Limited has 1 BHK, 1RK, 2 BHK, Basement Store, Commercial & Shop Apartments with carpet areas ranging from 110 to 857 Sq.ft. Carpet. The Project has total 56 of which 51 are currently available for sale.

Uma Kunj Cooperative Housing Society Limited is being developed on a total land area of 9225 Sq.ft. Uma Kunj Cooperative Housing Society Limited has 1 Wings / Towers Uma Kunj Cooperative Housing Society Limited

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
Saishyam ArcadeShubh BuildspaceSurvey No 20, Hissa No 2,431-12-2025 00:00:00
Shreeji IconicRaj Laxmi DevelopersSr No 137B And Sr No 9 H No 1031-12-2028 00:00:00
Samarth Shivani Co-Operative Housing Society LimitedGururaj Enterprises Builders And DevelopersS.No. 31, H. No. 2/A, Plot No. 8 & 931-08-2025 00:00:00
Surval HeightsGayatri DevelopersSurvey No 46 H No 11/12 And S No 83 H No 7/831-12-2023 00:00:00
Shubh Vastu Wing B And CShubh HomesSurvey No.143, Hissa No.3, 4 And 731-12-2025 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Jeevan LifestylesJeevan EnterprisesS N 148 / 13/1531-03-2019 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Marathon Nagari Nx Vigo DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.30-06-2019 00:00:00
Marathon Nagari Nx Vitoria DMarathon Realty Pvt Ltd79/3Pt. 83/10Pt.31-12-2019 00:00:00
M/S. Shubham Karoti Complex Phase - IM/S. Shubham Karoti Enterprises146/4 B Plot 1,231-03-2018 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Ved HeightsOm RealityS.No. 96, H. No. 231-12-2026 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Vedant VastuVedant VentureSurvey No. 63, Hissa No. 4A8, Plot No. 831-12-2018 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Mohan ArecaMohan Lifespaces LlpSurvey No 4/Hissa No 1P31-12-2019 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Ram RiveraS No 29/A/3 Plot No 13 And 1430-09-2025 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Park One Phase IiShree Laxmi EnterprisesSurvey No. 125, H.No. 1/A31-12-2027 00:00:00
Mohan Areca IiMohan Lifespaces LlpSurvey No.4/Hissa No 1P31-12-2019 00:00:00
Suraj Co.Op.Hsg.Soc.LtdAsd EnterprisesS No /Gut No 48/3 Plot No 6 To 1030-05-2024 00:00:00
Prachi ResidencyPrachi DevelopersS No 42 H No 1A Plot 4 And S No 42 H No 230-12-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Sarveshwar Co-Op Hsg SocDalal BuildscapeTaluka Ambernath30-06-2024 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IiiM/S. Shubham Karoti EnterprisesThane, 42150331-03-2020 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
NisargShree Sai Unity Builders And DevelopersSurvey No 60 Hissa No 1 Plot No 1 And 231-12-2017 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Vastu RachanaGagangiri InfraSurvey No. 69 H . No, 920-12-2026 00:00:00
Nav Avani ChsMangalya InfraS. No. 51, H. No. 3/A/30, Plot No. 3031-01-2025 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
Shiv ParadiseShiv CorporationPlot No 14 & 15 S No 45 H No 1/A/17 And 1 /A/1831-12-2025 00:00:00
Fulora Co-Op Housing Society LtdPinnacle CreatorsSurvey No 13 Hissa No 6 A 1731-07-2025 00:00:00
Satyam Sheela Wing FShreeji DevelopersSurvey No 72/4 And Survey No 73/1/B, Shirgaon,Badlapur-42150331-07-2026 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Swaroop OrchidSwaroop ConstructionS No 87 Hissa No 1130-06-2018 00:00:00
Shubh AanganShubh EnterprisesSurvey No 52 H No 3131-12-2019 00:00:00
The Address Ph-1 Wing ASadguru Associate421503, Thane, Badlapur31-08-2020 00:00:00
First EleganceGurupreet Singh Baldev Singh SandhuSurvey No 26, Hissa No2/A/23, Plot No 20, Shirgaon31-12-2025 00:00:00
Shreeji Landmark Phase 1Deep Laxmi Associates167 Part31-03-2027 00:00:00
Parijat Plaza Type BM/S Parijat ConstructionsS No 49 H No 20 P No 10 S No 50 H No 731-05-2018 00:00:00
Vastu Swapnapurty ResidencyVastu Builders And Developers3831-07-2023 00:00:00
Maitri HillsEshwar EnterprisesSurvey No 7 A H No 4 P Plo No 9 And 1030-06-2019 00:00:00
Sai HighlandShree Saikrupa DevelopersGat No 91 Hissa No 330-03-2022 00:00:00
Patil Hill ViewEkdant DevelopersS No 42 Hissa No 5 S No 57 Hissa 330-06-2018 00:00:00
Neelkanth DeepKeshav RealtySno-7A, H No-1/2 Plot-2 Moje Belavali30-06-2019 00:00:00
Shreshtha Swapna Co-Op Housing Society LtdOm Shree Sai Builders And DevelopersTaluka Ambarnath31-12-2024 00:00:00
Uma Kunj Cooperative Housing Society LimitedPravin Arvind ApteSurvey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B15-12-2025 00:00:00
Audumbar DarshanAudumbar EnterprisesSurvey No 55 H No 3/A/10 Plot No 231-01-2024 00:00:00
Shiv Tirth B WingGajraj EnterprisesSr No 36 Hissa No 3P Cts No 37931-12-2025 00:00:00
Shivam Homes Wing A And BShivam Homes42150331-12-2025 00:00:00
Vishwa Sky HighVineet InfrastructureSr No 7/A Hissa No 6/33,6/29,7/C,6/30/Kh,6/30/A Plot No 33,2924-11-2027 00:00:00
Nav Balaji Co-Op Hsg. Soc. Ltd.Ruturaj DevelopersSurvey No 29/A31-12-2025 00:00:00
Mauli ParkM/S. Mauli DevelopersSurvey No 83 Hissa No 1531-03-2028 00:00:00
Shiv Paradise Wing CShiv CorporationPlot No 14 & 15 Village Shirgaon, Survey No 45 H No 1/A/17 & 1/A/18, Survey No 45 H No 1/B31-12-2026 00:00:00
Mahalaxmi ResidenceShree Mahalaxmi DevelopersCs No 1263 C.No. 19 Cs No 1264 C.No. 3931-12-2024 00:00:00
Vitthai Anant PlazaSharad GaikwadBadlapur31-12-2026 00:00:00
Shree Datta Samartha ChslShree Sai Swami EnterprisesS No-40 H No-6 P No-630-06-2023 00:00:00
Bhakti Park B WingBhakti CorporationSurvey No 83 Hissa No 12A31-03-2018 00:00:00
M/S. Shubham Karoti Complex Phase - IiM/S. Shubham Karoti Enterprises1484 B Plot 731-12-2018 00:00:00
Pathak ResidencyShree Mahalaxmi ConstructionsS No 82 1 A 1B31-03-2019 00:00:00
Shree AtharvAtharv EnterprisesS No 43 Hissa 1A31-12-2025 00:00:00
Sonal ParadiseShubh GroupGut No 84, Gut No 86/1/A31-12-2026 00:00:00
Mahalaxmi Ashish Co.Op. Housing Society Ltd.Vpm Developers17/3/5/A/5 Plot No 531-03-2025 00:00:00
Saffron HillsAlpha CombinesSno 148 Hno 15A30-06-2019 00:00:00
Morya ResidencySairatna ConstructionS No 36 And 37 Hissa No D1 D3 5A7 And 8 Plot No 7 8 And 930-09-2020 00:00:00
Shubh HillsVardhman Enterprises1273C31-07-2018 00:00:00
MahalaxmiNayna Mukesh SapraS No 63 H No 4A Plot No 21 And 2231-12-2028 00:00:00
Shreeji Landmark NxShubh InfraSurvey No.136, Hissa No 1/B And 2A,31-12-2026 00:00:00
Om Chandraprakash Co. Op. Housing Society Ltd.Mega Arcade DevelopersPlot No 16, Survey No. 26/3/A31-05-2027 00:00:00
Sai Girnar Chs LtdMitra RealityS.No. 24/1/1 Plot No.2 And 25/2/5, 25/2/6 And 25/2/7 Plot No. 2, 3 And 431-12-2028 00:00:00
Jai Ganesh Co-Operative Housing Society LtdDeepali LandscapeSurvey No 42(P), Plot No H-1 (9 To 16 & 17 To 22)31-12-2026 00:00:00
Shreeji Landmark Phase IiShubh HousingSurvey No 136, Hissa No 331-12-2026 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Aryan One Wing G And HKonark Lifespaces70/1,70/2,71/1,75/1 ,75/2,75/3,75/5,75/6,76/1,76/2,76/3,77,78/3,79/9,79/1031-07-2018 00:00:00
Jijabai ParkDnyaneshwar Mauli Builder & Developers83/1031-12-2018 00:00:00
Krishna HillsShree Omsai ConstructionThane, 40053131-07-2017 00:00:00
Raj HeightBhavani Enterprises98/131-12-2019 00:00:00
Shree Sai PoojaM/S Mahalaxmi Construction Co.15/331-12-2019 00:00:00
Blue Diamond ResidencyKimaya ConstructionSurvey No 61 Hissa No 331-12-2019 00:00:00
Project Details
  • Project:
    Uma Kunj Cooperative Housing Society Limited
  • Location:
  • Survey No 50, H No.2B, S No. 51 H No.4/A/36 Plot No 35B
  • Const. Stage:
    New
  • Possession:
    15 Dec 2025
Developer Details

  • Developer:
    Pravin Arvind Apte
  • Phone:
  • Address:
  • Shraddha Sagar Apartment
Project RERA Details
MAHA REARA No: P51700033015
Project Type Others
RERA Project Status New
Architect Miheer Tendolkar
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 15 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 03 Feb 2022
Last Retrived 26 Jul 2025
Uma Kunj Cooperative Housing Society Limited QR Code
Uma Kunj Cooperative Housing Society Limited
MahaRERA - P51700033015
Apartment Details & Configuration
TypeArea
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )
1 BHK33.05 Sq.mts. ( 356 Sq.ft. )
1 BHK33.65 Sq.mts. ( 362 Sq.ft. )
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )
1 BHK36.55 Sq.mts. ( 393 Sq.ft. )
1 BHK39.67 Sq.mts. ( 427 Sq.ft. )
1 BHK40.15 Sq.mts. ( 432 Sq.ft. )
1RK30.87 Sq.mts. ( 332 Sq.ft. )
1RK22.12 Sq.mts. ( 238 Sq.ft. )
2 BHK41.78 Sq.mts. ( 450 Sq.ft. )
2 BHK42.05 Sq.mts. ( 453 Sq.ft. )
2 BHK44.71 Sq.mts. ( 481 Sq.ft. )
2 BHK51.48 Sq.mts. ( 554 Sq.ft. )
Basement Store79.62 Sq.mts. ( 857 Sq.ft. )
Commercial167.94 Sq.mts. ( 1808 Sq.ft. )
Shop55.46 Sq.mts. ( 597 Sq.ft. )
Shop40.05 Sq.mts. ( 431 Sq.ft. )
Shop24.75 Sq.mts. ( 266 Sq.ft. )
Shop32.94 Sq.mts. ( 355 Sq.ft. )
Shop10.2 Sq.mts. ( 110 Sq.ft. )
Shop13.92 Sq.mts. ( 150 Sq.ft. )
Shop15.84 Sq.mts. ( 171 Sq.ft. )
Shop18.54 Sq.mts. ( 200 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Uma Kunj Cooperative Housing Society Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting100% completed
95% Complete
-
Open Parking
-
Sewerage (Chamber, Lines, Septic Tank , STP)
Connection To Municipal Sewerline
Solid Waste Management And Disposal
Dustbin
Storm Water Drains100% completed
95% Complete
Surface Drain Off
Street Lighting25% completed
25% Complete
Lighting Surroundings
Treatment And Disposal Of Sewage And Sullage Water
Connection To Municipal Sewerline
Water Conservation, Rain water Harvesting
Rain Water Pipe Discharge From Terrace To Borewell
Water Supply
Mjpl
Buildings / Wings in Uma Kunj Cooperative Housing Society Limited
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Uma Kunj Cooperative Housing Society Limited by Pravin Arvind Aptelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

9225 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

56 apartments in total
Total
56
Booked
5
Available
51

Saleable Area Statistics (Sq. ft.)

23222 Total
Total
23222
Booked
2006
Available
21216
Total 56 apartments in project. 5 apartments booked. 8% apartments booked.
Total 23222 Sq.ft. saleable area. 2006 saleable area booked.
9% area booked.

Uma Kunj Cooperative Housing Society Limited

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Uma Kunj Cooperative Housing Society LimitedDec 202581100015
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK29.87 Sq.mts. ( 322 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK33.05 Sq.mts. ( 356 Sq.ft. )3
None Booked0% Booked
0% Booked
1 BHK33.65 Sq.mts. ( 362 Sq.ft. )6
None Booked0% Booked
0% Booked
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK35.75 Sq.mts. ( 385 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK36.55 Sq.mts. ( 393 Sq.ft. )6
2 Booked33% Booked
33% Booked
1 BHK39.67 Sq.mts. ( 427 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK40.15 Sq.mts. ( 432 Sq.ft. )1
None Booked0% Booked
0% Booked
1RK30.87 Sq.mts. ( 332 Sq.ft. )12
1RK22.12 Sq.mts. ( 238 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK41.78 Sq.mts. ( 450 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK42.05 Sq.mts. ( 453 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK44.71 Sq.mts. ( 481 Sq.ft. )3
None Booked0% Booked
0% Booked
2 BHK51.48 Sq.mts. ( 554 Sq.ft. )6
Basement Store79.62 Sq.mts. ( 857 Sq.ft. )1
None Booked0% Booked
0% Booked
Commercial167.94 Sq.mts. ( 1808 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop55.46 Sq.mts. ( 597 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop40.05 Sq.mts. ( 431 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop24.75 Sq.mts. ( 266 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop32.94 Sq.mts. ( 355 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.2 Sq.mts. ( 110 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.92 Sq.mts. ( 150 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.84 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.54 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
56 total apartments / 5 apartments booked. 8% apartments booked.
Work Description in Building Uma Kunj Cooperative Housing Society LimitedCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress25% done
25% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pravin Arvind Apte
for Project
Uma Kunj Cooperative Housing Society Limited
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation