Project overview

Ujwala Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P99000048778. Ujwala Residency is located at Cts No 2079 2080& 2081. This is a New being developed by Ujwala Realtors.

Ujwala Residency has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 275 to 661 Sq.ft. Carpet. The Project has total 13 of which 13 are currently available for sale.

Ujwala Residency is being developed on a total land area of 5767 Sq.ft. Ujwala Residency has 1 Wings / Towers Ujwala Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ujwala Residency
  • Location:
  • Cts No 2079 2080& 2081
  • Const. Stage:
    New
  • Possession:
    31 Dec 2025
Developer Details

  • Developer:
    Ujwala Realtors
  • Phone:
  • Address:
  • Holbhat
Project RERA Details
MAHA REARA No: P99000048778
Project Type Others
RERA Project Status New
Architect A M Faroz And Associates
Funding Bank BASSEIN CATHOLIC COOPERATIVE BANK LIMITED
Proposed Possession 31 Dec 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 17 Jan 2023
Last Retrived 28 Jul 2025
Ujwala Residency QR Code
Ujwala Residency
MahaRERA - P99000048778
Apartment Details & Configuration
TypeArea
1 BHK27.13 Sq.mts. ( 292 Sq.ft. )
2 BHK61.41 Sq.mts. ( 661 Sq.ft. )
Office space55.73 Sq.mts. ( 600 Sq.ft. )
Office space58.32 Sq.mts. ( 628 Sq.ft. )
Shop25.53 Sq.mts. ( 275 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ujwala Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
In Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
In Progress
Open Parking
In Progress
Sewerage (Chamber, Lines, Septic Tank , STP)
In Progress
Solid Waste Management And Disposal
Na
Storm Water Drains
In Progress
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
In Progress
Water Supply
Facility Will Start Once Vvcmc Water Supply Commen
Buildings / Wings in Ujwala Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ujwala Residency by Ujwala Realtorslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

5767 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

13 apartments in total
Total
13
Booked
0
Available
13

Saleable Area Statistics (Sq. ft.)

5512 Total
Total
5512
Booked
0
Available
5512
Total 13 apartments in project. 0 apartments booked. 0% apartments booked.
Total 5512 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Ujwala Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Ujwala ResidencyDec 202571010401
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.13 Sq.mts. ( 292 Sq.ft. )6
None Booked0% Booked
0% Booked
2 BHK61.41 Sq.mts. ( 661 Sq.ft. )3
None Booked0% Booked
0% Booked
Office space55.73 Sq.mts. ( 600 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space58.32 Sq.mts. ( 628 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop25.53 Sq.mts. ( 275 Sq.ft. )2
None Booked0% Booked
0% Booked
13 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Ujwala ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress80% done
80% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress50% done
50% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress41% done
41% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress30% done
30% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ujwala Realtors
for Project
Ujwala Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation