Project overview

Two Roses is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004187. Two Roses is located at Plot No 5 Cts No F/866. This is a Ongoing being developed by Prakash Estates.

Two Roses has B WING Apartments with carpet areas ranging from 24556 to 24556 Sq.ft. Carpet. The Project has total 61 of which 9 are currently available for sale.

Two Roses is being developed on a total land area of 21862 Sq.ft. out of which 21869 Sq.ft. i.e 100% is reserved for recreational purposes. Two Roses has 2 Wings / Towers A Wing,B Wing

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Two Roses
  • Location:
  • Plot No 5 Cts No F/866
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Prakash Estates
  • Phone:
  • Address:
  • Raj Residency
Project RERA Details
MAHA REARA No: P51800004187
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect A R Mehta & Associates
Funding Bank BHARAT COOPERATIVE BANK MUMBAI LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Two Roses QR Code
Two Roses
MahaRERA - P51800004187
Apartment Details & Configuration
TypeArea
A WING2772.98 Sq.mts. ( 29848 Sq.ft. )
B WING2281.32 Sq.mts. ( 24556 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Two Roseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
100
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
100
Landscaping & Tree Planting100% completed
95% Complete
100
Open Parking100% completed
95% Complete
100
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
100
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
100
Street Lighting100% completed
95% Complete
100
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
100
Water Supply100% completed
95% Complete
100
Buildings / Wings in Two Roses
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Two Roses by Prakash Estateslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

21862 Sq. ft.

Project Area

21869 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

61 apartments in total
Total
61
Booked
52
Available
9

Saleable Area Statistics (Sq. ft.)

1667275 Total
Total
1667275
Booked
1419809
Available
247466
Total 61 apartments in project. 52 apartments booked. 85% apartments booked.
Total 1667275 Sq.ft. saleable area. 1419809 saleable area booked.
85% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingDec 2019171012111
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A WING2772.98 Sq.mts. ( 29848 Sq.ft. )32
27 Booked84% Booked
84% Booked
32 total apartments / 27 apartments booked. 84% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingDec 201919101281
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
B WING2281.32 Sq.mts. ( 24556 Sq.ft. )29
25 Booked86% Booked
86% Booked
29 total apartments / 25 apartments booked. 86% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Prakash Estates
for Project
Two Roses
last updated on 26 Jul 2025 as per information obtained from MARA RERA.