Project overview

Tulsi Chamber Phase Ii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800027210. Tulsi Chamber Phase Ii is located at 385. This is a New being developed by Surana Construction (Chembur ).

Tulsi Chamber Phase Ii has 1001, 1002, 1003, 1004, 1101, 1102, 301, 302, 303, 304, 401, 402, 403, 404, 501, 502, 503, 504, 601, 602, 603, 604, 701, 702, 703, 704, 801, 802, 901, 902, 903 & 904 Apartments with carpet areas ranging from 320 to 393 Sq.ft. Carpet. The Project has total 64 of which 57 are currently available for sale.

Tulsi Chamber Phase Ii is being developed on a total land area of 43239 Sq.ft. Tulsi Chamber Phase Ii has 2 Wings / Towers Tulsi Chambers,Tulsi Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tulsi Chamber Phase Ii
  • Location:
  • 385
  • Const. Stage:
    New
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Surana Construction (Chembur )
  • Phone:
  • Address:
  • Singapore Arcade
Project RERA Details
MAHA REARA No: P51800027210
Project Type Others
RERA Project Status New
Architect Gurunath L Pangam
Funding Bank AXIS BANK
Proposed Possession 30 Jun 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 13 Aug 2024
Last Retrived 26 Jul 2025
Tulsi Chamber Phase Ii QR Code
Tulsi Chamber Phase Ii
MahaRERA - P51800027210
Apartment Details & Configuration
TypeArea
140181.79 Sq.mts. ( 880 Sq.ft. )
140248.71 Sq.mts. ( 524 Sq.ft. )
140351.83 Sq.mts. ( 558 Sq.ft. )
140448.61 Sq.mts. ( 523 Sq.ft. )
140550.17 Sq.mts. ( 540 Sq.ft. )
1405A83.55 Sq.mts. ( 899 Sq.ft. )
140693.55 Sq.mts. ( 1007 Sq.ft. )
140755.34 Sq.mts. ( 596 Sq.ft. )
1408A94.32 Sq.mts. ( 1015 Sq.ft. )
1408B63.85 Sq.mts. ( 687 Sq.ft. )
1408C38 Sq.mts. ( 409 Sq.ft. )
100129.73 Sq.mts. ( 320 Sq.ft. )
100436.51 Sq.mts. ( 393 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tulsi Chamber Phase Iilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Wip
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Tulsi Chamber Phase Ii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tulsi Chamber Phase Ii by Surana Construction (Chembur )last updated on 26 Jul 2025 as per information obtained from MARA RERA.

43239 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

64 apartments in total
Total
64
Booked
7
Available
57

Saleable Area Statistics (Sq. ft.)

33218 Total
Total
33218
Booked
3081
Available
30137
Total 64 apartments in project. 7 apartments booked. 10% apartments booked.
Total 33218 Sq.ft. saleable area. 3081 saleable area booked.
9% area booked.

Tulsi Chambers

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tulsi ChambersDec 20232000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
140181.79 Sq.mts. ( 880 Sq.ft. )1
None Booked0% Booked
0% Booked
140248.71 Sq.mts. ( 524 Sq.ft. )1
None Booked0% Booked
0% Booked
140351.83 Sq.mts. ( 558 Sq.ft. )1
None Booked0% Booked
0% Booked
140448.61 Sq.mts. ( 523 Sq.ft. )1
None Booked0% Booked
0% Booked
140550.17 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
1405A83.55 Sq.mts. ( 899 Sq.ft. )1
None Booked0% Booked
0% Booked
140693.55 Sq.mts. ( 1007 Sq.ft. )1
None Booked0% Booked
0% Booked
140755.34 Sq.mts. ( 596 Sq.ft. )1
None Booked0% Booked
0% Booked
1408A94.32 Sq.mts. ( 1015 Sq.ft. )1
1 Booked100% Booked
100% Booked
1408B63.85 Sq.mts. ( 687 Sq.ft. )1
None Booked0% Booked
0% Booked
1408C38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
150181.79 Sq.mts. ( 880 Sq.ft. )1
None Booked0% Booked
0% Booked
150351.83 Sq.mts. ( 558 Sq.ft. )1
None Booked0% Booked
0% Booked
150448.61 Sq.mts. ( 523 Sq.ft. )1
None Booked0% Booked
0% Booked
150550.17 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
1505A83.55 Sq.mts. ( 899 Sq.ft. )1
None Booked0% Booked
0% Booked
150693.55 Sq.mts. ( 1007 Sq.ft. )1
None Booked0% Booked
0% Booked
150755.34 Sq.mts. ( 596 Sq.ft. )1
None Booked0% Booked
0% Booked
1508A94.32 Sq.mts. ( 1015 Sq.ft. )1
None Booked0% Booked
0% Booked
1508B63.85 Sq.mts. ( 687 Sq.ft. )1
None Booked0% Booked
0% Booked
1508C38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
160181.79 Sq.mts. ( 880 Sq.ft. )1
None Booked0% Booked
0% Booked
160248.71 Sq.mts. ( 524 Sq.ft. )1
None Booked0% Booked
0% Booked
160351.83 Sq.mts. ( 558 Sq.ft. )1
None Booked0% Booked
0% Booked
160448.61 Sq.mts. ( 523 Sq.ft. )1
None Booked0% Booked
0% Booked
160550.17 Sq.mts. ( 540 Sq.ft. )1
None Booked0% Booked
0% Booked
1605A83.55 Sq.mts. ( 899 Sq.ft. )1
None Booked0% Booked
0% Booked
160693.55 Sq.mts. ( 1007 Sq.ft. )1
None Booked0% Booked
0% Booked
160755.34 Sq.mts. ( 596 Sq.ft. )1
None Booked0% Booked
0% Booked
1608A94.32 Sq.mts. ( 1015 Sq.ft. )1
None Booked0% Booked
0% Booked
1608B63.85 Sq.mts. ( 687 Sq.ft. )1
None Booked0% Booked
0% Booked
1608C38 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 1 apartments booked. 3% apartments booked.
Work Description in Building Tulsi ChambersCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress50% done
50% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress30% done
30% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tulsi Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tulsi ResidencyDec 202314100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
100129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
100229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
100329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
100436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
110129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
110229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
30129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
30229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
30329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
30436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
40129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
40229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
40329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
40436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
50129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
50229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
50329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
50436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
60129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
60229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
60329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
60436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
70129.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
70229.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
70329.73 Sq.mts. ( 320 Sq.ft. )1
None Booked0% Booked
0% Booked
70436.51 Sq.mts. ( 393 Sq.ft. )1
None Booked0% Booked
0% Booked
80129.73 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
80236.51 Sq.mts. ( 393 Sq.ft. )1
1 Booked100% Booked
100% Booked
90129.73 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
90229.73 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
90329.73 Sq.mts. ( 320 Sq.ft. )1
1 Booked100% Booked
100% Booked
90436.51 Sq.mts. ( 393 Sq.ft. )1
1 Booked100% Booked
100% Booked
32 total apartments / 6 apartments booked. 18% apartments booked.
Work Description in Building Tulsi ResidencyCompletion
Basement (if any)
work-in-progress90% done
90% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress50% done
50% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress29% done
29% Booked
Plinth
work-in-progress90% done
90% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress90% done
90% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress50% done
50% Booked
Channel Partners
Channel Partners Registered by Developer
Surana Construction (Chembur )
for Project
Tulsi Chamber Phase Ii
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation