Project overview

Tulsi Centre Point is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000000571. Tulsi Centre Point is located at 1/25 To 137, 1/38B To 1/41B. This is a Ongoing being developed by Navkar Developers.

Tulsi Centre Point has 1 BHK, 1RK, 2 BHK, 3 BHK, OFFICE & SHOP Apartments with carpet areas ranging from 116 to 101 Sq.ft. Carpet. The Project has total 214 of which 133 are currently available for sale.

Tulsi Centre Point is being developed on a total land area of 63072 Sq.ft. out of which 5802 Sq.ft. i.e 9% is reserved for recreational purposes. Tulsi Centre Point has 1 Wings / Towers Tulsicentrepoint

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tulsi Centre Point
  • Location:
  • 1/25 To 137, 1/38B To 1/41B
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Navkar Developers
  • Phone:
  • Address:
  • Mithiliya Nagari
Project RERA Details
MAHA REARA No: P52000000571
Project Type Others
RERA Project Status Ongoing
Architect Siddarth Shrish Shirur
Funding Bank KOTAK MAHINDRA BANK LIMITED
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Dec 2021
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 28 Jul 2025
Tulsi Centre Point QR Code
Tulsi Centre Point
MahaRERA - P52000000571
Apartment Details & Configuration
TypeArea
1 BHK28.19 Sq.mts. ( 303 Sq.ft. )
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )
1 BHK30.12 Sq.mts. ( 324 Sq.ft. )
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )
1RK17.61 Sq.mts. ( 190 Sq.ft. )
1RK19.08 Sq.mts. ( 205 Sq.ft. )
1RK20.44 Sq.mts. ( 220 Sq.ft. )
2 BHK42.11 Sq.mts. ( 453 Sq.ft. )
2 BHK44.16 Sq.mts. ( 475 Sq.ft. )
3 BHK63.54 Sq.mts. ( 684 Sq.ft. )
OFFICE6.52 Sq.mts. ( 70 Sq.ft. )
OFFICE7.98 Sq.mts. ( 86 Sq.ft. )
OFFICE8.42 Sq.mts. ( 91 Sq.ft. )
OFFICE9.38 Sq.mts. ( 101 Sq.ft. )
OFFICE10.75 Sq.mts. ( 116 Sq.ft. )
OFFICE11.41 Sq.mts. ( 123 Sq.ft. )
OFFICE12.81 Sq.mts. ( 138 Sq.ft. )
OFFICE13.06 Sq.mts. ( 141 Sq.ft. )
OFFICE13.74 Sq.mts. ( 148 Sq.ft. )
OFFICE14.64 Sq.mts. ( 158 Sq.ft. )
OFFICE19.45 Sq.mts. ( 209 Sq.ft. )
OFFICE17.41 Sq.mts. ( 187 Sq.ft. )
OFFICE18.18 Sq.mts. ( 196 Sq.ft. )
OFFICE15.49 Sq.mts. ( 167 Sq.ft. )
OFFICE16.38 Sq.mts. ( 176 Sq.ft. )
SHOP16.79 Sq.mts. ( 181 Sq.ft. )
SHOP15.84 Sq.mts. ( 171 Sq.ft. )
SHOP18.44 Sq.mts. ( 198 Sq.ft. )
SHOP17.72 Sq.mts. ( 191 Sq.ft. )
SHOP19.55 Sq.mts. ( 210 Sq.ft. )
SHOP20.67 Sq.mts. ( 222 Sq.ft. )
SHOP26.5 Sq.mts. ( 285 Sq.ft. )
SHOP14.99 Sq.mts. ( 161 Sq.ft. )
SHOP14.05 Sq.mts. ( 151 Sq.ft. )
SHOP13.36 Sq.mts. ( 144 Sq.ft. )
SHOP11.71 Sq.mts. ( 126 Sq.ft. )
SHOP10.77 Sq.mts. ( 116 Sq.ft. )
SHOP8.43 Sq.mts. ( 91 Sq.ft. )
SHOP6.6 Sq.mts. ( 71 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tulsi Centre Pointlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Will Start As Work Progresses
Community Buildings85% completed
85% Complete
Club House
Electrical Meter Room, Sub-Station, Receiving Station
Will Start As Work Progresses
Energy management
Will Start As Work Progresses
Fire Protection And Fire Safety Requirements
Will Start As Work Progresses
Landscaping & Tree Planting
Will Start As Work Progresses
Open Parking1% completed
1% Complete
Will Start As Work Progresses
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Septic Tank Work Progress Given
Solid Waste Management And Disposal
Na
Storm Water Drains
Will Start As Work Progresses
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
Will Take As Work Progresses
Buildings / Wings in Tulsi Centre Point
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tulsi Centre Point by Navkar Developerslast updated on 28 Jul 2025 as per information obtained from MARA RERA.

63072 Sq. ft.

Project Area

5802 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

214 apartments in total
Total
214
Booked
81
Available
133

Saleable Area Statistics (Sq. ft.)

53876 Total
Total
53876
Booked
22749
Available
31127
Total 214 apartments in project. 81 apartments booked. 37% apartments booked.
Total 53876 Sq.ft. saleable area. 22749 saleable area booked.
42% area booked.

Tulsicentrepoint

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TulsicentrepointDec 2019710101317
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK28.19 Sq.mts. ( 303 Sq.ft. )34
14 Booked41% Booked
41% Booked
1 BHK29.22 Sq.mts. ( 315 Sq.ft. )14
4 Booked28% Booked
28% Booked
1 BHK30.12 Sq.mts. ( 324 Sq.ft. )17
9 Booked52% Booked
52% Booked
1 BHK32.98 Sq.mts. ( 355 Sq.ft. )2
None Booked0% Booked
0% Booked
1 BHK33.72 Sq.mts. ( 363 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.58 Sq.mts. ( 383 Sq.ft. )3
None Booked0% Booked
0% Booked
1RK17.61 Sq.mts. ( 190 Sq.ft. )5
5 Booked100% Booked
100% Booked
1RK19.08 Sq.mts. ( 205 Sq.ft. )1
1 Booked100% Booked
100% Booked
1RK20.44 Sq.mts. ( 220 Sq.ft. )13
11 Booked84% Booked
84% Booked
2 BHK42.11 Sq.mts. ( 453 Sq.ft. )19
12 Booked63% Booked
63% Booked
2 BHK44.16 Sq.mts. ( 475 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK63.54 Sq.mts. ( 684 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE6.52 Sq.mts. ( 70 Sq.ft. )2
1 Booked50% Booked
50% Booked
OFFICE7.98 Sq.mts. ( 86 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE8.42 Sq.mts. ( 91 Sq.ft. )4
None Booked0% Booked
0% Booked
OFFICE9.38 Sq.mts. ( 101 Sq.ft. )2
1 Booked50% Booked
50% Booked
OFFICE10.75 Sq.mts. ( 116 Sq.ft. )3
None Booked0% Booked
0% Booked
OFFICE11.41 Sq.mts. ( 123 Sq.ft. )4
3 Booked75% Booked
75% Booked
OFFICE12.81 Sq.mts. ( 138 Sq.ft. )7
None Booked0% Booked
0% Booked
OFFICE13.06 Sq.mts. ( 141 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE13.74 Sq.mts. ( 148 Sq.ft. )4
None Booked0% Booked
0% Booked
OFFICE14.64 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
OFFICE19.45 Sq.mts. ( 209 Sq.ft. )3
1 Booked33% Booked
33% Booked
OFFICE17.41 Sq.mts. ( 187 Sq.ft. )1
None Booked0% Booked
0% Booked
OFFICE18.18 Sq.mts. ( 196 Sq.ft. )4
None Booked0% Booked
0% Booked
OFFICE15.49 Sq.mts. ( 167 Sq.ft. )2
None Booked0% Booked
0% Booked
OFFICE16.38 Sq.mts. ( 176 Sq.ft. )9
2 Booked22% Booked
22% Booked
SHOP16.79 Sq.mts. ( 181 Sq.ft. )5
None Booked0% Booked
0% Booked
SHOP15.84 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.44 Sq.mts. ( 198 Sq.ft. )8
3 Booked37% Booked
37% Booked
SHOP17.72 Sq.mts. ( 191 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP19.55 Sq.mts. ( 210 Sq.ft. )2
None Booked0% Booked
0% Booked
SHOP20.67 Sq.mts. ( 222 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP26.5 Sq.mts. ( 285 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.99 Sq.mts. ( 161 Sq.ft. )8
None Booked0% Booked
0% Booked
SHOP14.05 Sq.mts. ( 151 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP13.36 Sq.mts. ( 144 Sq.ft. )8
SHOP11.71 Sq.mts. ( 126 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP10.77 Sq.mts. ( 116 Sq.ft. )3
None Booked0% Booked
0% Booked
SHOP9.38 Sq.mts. ( 101 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP8.43 Sq.mts. ( 91 Sq.ft. )4
3 Booked75% Booked
75% Booked
SHOP6.6 Sq.mts. ( 71 Sq.ft. )2
1 Booked50% Booked
50% Booked
214 total apartments / 81 apartments booked. 37% apartments booked.
Work Description in Building TulsicentrepointCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress85% done
85% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Navkar Developers
for Project
Tulsi Centre Point
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation