Project overview
Tulsi Aanand is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700032811. Tulsi Aanand is located at S No-40 H No-1P / S No-40 H No-2P. This is a New being developed by Raj Group.
Tulsi Aanand has 1 BHK & 2 BHK Apartments with carpet areas ranging from 357 to 549 Sq.ft. Carpet. The Project has total 320 of which 320 are currently available for sale.
Tulsi Aanand is being developed on a total land area of 85574 Sq.ft. out of which 8130 Sq.ft. i.e 10% is reserved for recreational purposes. Tulsi Aanand has 2 Wings / Towers Wing A,Wing B
| Project | Developer | Location | Possession |
-
Developer:
Raj Group
-
Phone:
-
Address:
-
Guru Ashray
| MAHA REARA No: |
P51700032811 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
S R Khambayat Partner Of Raj Associates |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
31 Dec 2025 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
13 Dec 2024 |
| Last Retrived |
26 Jul 2025 |
Tulsi Aanand QR Code
Tulsi Aanand
MahaRERA - P51700032811
| Type | Area |
| 1 BHK | 33.12 Sq.mts. ( 357 Sq.ft. ) |
| 1 BHK | 33.89 Sq.mts. ( 365 Sq.ft. ) |
| 2 BHK | 50.63 Sq.mts. ( 545 Sq.ft. ) |
| 2 BHK | 50.55 Sq.mts. ( 544 Sq.ft. ) |
| 2 BHK | 50.97 Sq.mts. ( 549 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of Tulsi Aanandlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Total 714.20 Sq Mtr- Work Yet Not Started |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station
|
|
Electrical Meter Room Work Not Yet Started |
|
|
|
Work Not Yet Started |
Fire Protection And Fire Safety
Requirements
|
|
Work Not Yet Started |
Landscaping & Tree Planting
|
|
Work Not Yet Started |
|
|
|
As Per Building Plans Sanctioned |
Sewerage (Chamber, Lines, Septic Tank , STP)
|
|
Muncipal Sewrage Line Available. Work Not Yert Sta |
Solid Waste Management And Disposal
|
|
Na |
|
|
|
Work Not Yet Started |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Na |
Water Conservation, Rain water Harvesting
|
|
Work Not Yet Started |
|
|
|
Maharashtra Jeevan Pradhikaran (M.J.P) Will Provid |
Buildings / Wings in Tulsi Aanand
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tulsi Aanand by Raj Grouplast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
320
apartments in total
Saleable Area Statistics (Sq. ft.)
132169
Total
Total 320 apartments in project. 0 apartments booked. 0% apartments booked.
Total 132169 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing A | Dec 2025 | 15 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 33.12 Sq.mts. ( 357 Sq.ft. ) | 98 | |
| 1 BHK | 33.89 Sq.mts. ( 365 Sq.ft. ) | 40 | |
| 2 BHK | 50.63 Sq.mts. ( 545 Sq.ft. ) | 28 | |
166 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing A | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Wing B | Dec 2025 | 14 | 1 | 0 | 1 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 33.12 Sq.mts. ( 357 Sq.ft. ) | 76 | |
| 1 BHK | 33.89 Sq.mts. ( 365 Sq.ft. ) | 13 | |
| 2 BHK | 50.55 Sq.mts. ( 544 Sq.ft. ) | 26 | |
| 2 BHK | 50.97 Sq.mts. ( 549 Sq.ft. ) | 39 | |
154 total apartments / 0 apartments booked. 0% apartments booked. |
| Work Description in Building Wing B | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises | |
| Overall Percentage of Completion of the work done For the entire Building /Wing | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing | |
| X number of Basement(s) and Plinth | |
| X number of Podiums | |
| X number of Slabs of Super Structure | |
Channel Partners Registered by Developer
Raj Group
for Project
Tulsi Aanand
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |