Project overview

Trinity Towers is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800008384. Trinity Towers is located at 2-A Pt Of Village Powai. This is a Ongoing being developed by Parorch Developers Llp.

Trinity Towers has 3 BHK, 4 BHK & 6.5 BHK Apartments with carpet areas ranging from 1665 to 4074 Sq.ft. Carpet. The Project has total 125 of which 86 are currently available for sale.

Trinity Towers is being developed on a total land area of 35396 Sq.ft. out of which 13619 Sq.ft. i.e 38% is reserved for recreational purposes. Trinity Towers has 1 Wings / Towers Trinity Towers

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Trinity Towers
  • Location:
  • 2-A Pt Of Village Powai
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2026
Developer Details

  • Developer:
    Parorch Developers Llp
  • Phone:
  • Address:
  • Anuradha Society
Project RERA Details
MAHA REARA No: P51800008384
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Dot Architects
Funding Bank JANAKALYAN SAHAKARI BANK LIMITED
Proposed Possession 30 Dec 2026
Revised Possession 30 Dec 2026
Extended Possession
Litigations No Litigations
Last Modified 18 Aug 2017
Last Retrived 26 Jul 2025
Trinity Towers QR Code
Trinity Towers
MahaRERA - P51800008384
Apartment Details & Configuration
TypeArea
3 BHK154.7 Sq.mts. ( 1665 Sq.ft. )
4 BHK197.75 Sq.mts. ( 2129 Sq.ft. )
4 BHK201.39 Sq.mts. ( 2168 Sq.ft. )
6.5 BHK315.09 Sq.mts. ( 3392 Sq.ft. )
6.5 BHK378.52 Sq.mts. ( 4074 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Trinity Towerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
-
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
-
Energy management
-
Fire Protection And Fire Safety Requirements
-
Landscaping & Tree Planting
-
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
-
Solid Waste Management And Disposal
-
Storm Water Drains
-
Street Lighting
-
Treatment And Disposal Of Sewage And Sullage Water
-
Water Conservation, Rain water Harvesting
-
Water Supply
-
Buildings / Wings in Trinity Towers
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trinity Towers by Parorch Developers Llplast updated on 26 Jul 2025 as per information obtained from MARA RERA.

35396 Sq. ft.

Project Area

13619 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

125 apartments in total
Total
125
Booked
39
Available
86

Saleable Area Statistics (Sq. ft.)

241648 Total
Total
241648
Booked
74835
Available
166814
Total 125 apartments in project. 39 apartments booked. 31% apartments booked.
Total 241648 Sq.ft. saleable area. 74835 saleable area booked.
31% area booked.

Trinity Towers

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity TowersDec 20253810140112
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
3 BHK154.7 Sq.mts. ( 1665 Sq.ft. )62
25 Booked40% Booked
40% Booked
4 BHK197.75 Sq.mts. ( 2129 Sq.ft. )33
7 Booked21% Booked
21% Booked
4 BHK201.39 Sq.mts. ( 2168 Sq.ft. )28
6.5 BHK315.09 Sq.mts. ( 3392 Sq.ft. )1
1 Booked100% Booked
100% Booked
6.5 BHK378.52 Sq.mts. ( 4074 Sq.ft. )1
1 Booked100% Booked
100% Booked
125 total apartments / 39 apartments booked. 31% apartments booked.
Work Description in Building Trinity TowersCompletion
Basement (if any)
work-in-progress70% done
70% Booked
Excavation
work-in-progress70% done
70% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
work-in-progress70% done
70% Booked
Podiums (if any)
work-in-progress25% done
25% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
work-in-progress70% done
70% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
work-in-progress25% done
25% Booked
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Parorch Developers Llp
for Project
Trinity Towers
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation