Project overview

Trinity Galaxy R1 And R4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007348. Trinity Galaxy R1 And R4 is located at Survey No 172 Hissa 13 14 15. This is a Ongoing being developed by Trinity Developers.

Trinity Galaxy R1 And R4 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 294 to 392 Sq.ft. Carpet. The Project has total 46 of which 20 are currently available for sale.

Trinity Galaxy R1 And R4 is being developed on a total land area of 23627 Sq.ft. Trinity Galaxy R1 And R4 has 2 Wings / Towers R1,R4

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
AlankapuriAshish Waman GoleS.No 17/H.No 1 & H.No 8/Plot No. 101-05-2027 00:00:00
Shrihari Chandan ApartmentAbhishek Shelters LimitedCts No 1269, 127031-03-2028 00:00:00
Shivshakti PrimeShivshakti BuildconSurvey No-53 Hissa No- 4/130-09-2027 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Trident Tower Type DShri Krishna HomesS No 15 H No 1 Plot No C31-03-2025 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Shree Datta Narhari ApartmentOmkar EnterprisesSurvey No 32,Hissa No 2,Plot No 901-12-2025 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Samarth VatikaShree Samarth Associates122Asurvey No 32 Shirgaon Badlapur30-12-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Bingo Dham Co-Op Hsg Soc LtdSai ConstructionsThane, 421503, Badlapur31-12-2022 00:00:00
Daksh PalaceThakur DevelopersManjarli30-09-2024 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Ekdanta ApartmemtEashanya Builder And Developers421503, Thane31-12-2019 00:00:00
Sai Aangan - C WingShree Sai Chatra DevelopersS No 87 H No 5 P No 1 S No 87 H No 12 And 1331-12-2018 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
Murlidhar PlazaSaipoojan EnterprisesGut No 40 Hissa No 1619-12-2021 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Shivam GreensM.K.DevelopersGut No 5 Hissa No 6, 11 And 1330-12-2023 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
Project Details
  • Project:
    Trinity Galaxy R1 And R4
  • Location:
  • Survey No 172 Hissa 13 14 15
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2018
Developer Details

  • Developer:
    Trinity Developers
  • Phone:
  • Address:
  • Suraj Apartment
Project RERA Details
MAHA REARA No: P51700007348
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Pramod Patil
Funding Bank IDBI BANK
Proposed Possession 30 Jun 2018
Revised Possession 30 Jun 2018
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 26 Jul 2025
Trinity Galaxy R1 And R4 QR Code
Trinity Galaxy R1 And R4
MahaRERA - P51700007348
Apartment Details & Configuration
TypeArea
1 BHK25.59 Sq.mts. ( 275 Sq.ft. )
1 BHK25.76 Sq.mts. ( 277 Sq.ft. )
1 BHK26.97 Sq.mts. ( 290 Sq.ft. )
Shop10.41 Sq.mts. ( 112 Sq.ft. )
Shop13.02 Sq.mts. ( 140 Sq.ft. )
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )
1 BHK27.94 Sq.mts. ( 301 Sq.ft. )
2 BHK36.4 Sq.mts. ( 392 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Trinity Galaxy R1 And R4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Solar Energy In Progress
Fire Protection And Fire Safety Requirements
In Progress
Landscaping & Tree Planting
0
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Stp Only Septic Tank Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply
In Progress
Buildings / Wings in Trinity Galaxy R1 And R4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trinity Galaxy R1 And R4 by Trinity Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

23627 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

46 apartments in total
Total
46
Booked
26
Available
20

Saleable Area Statistics (Sq. ft.)

12712 Total
Total
12712
Booked
7235
Available
5477
Total 46 apartments in project. 26 apartments booked. 56% apartments booked.
Total 12712 Sq.ft. saleable area. 7235 saleable area booked.
57% area booked.

R1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R1Jan 19008101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK25.59 Sq.mts. ( 275 Sq.ft. )14
7 Booked50% Booked
50% Booked
1 BHK25.76 Sq.mts. ( 277 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK26.97 Sq.mts. ( 290 Sq.ft. )14
9 Booked64% Booked
64% Booked
Shop10.41 Sq.mts. ( 112 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop13.02 Sq.mts. ( 140 Sq.ft. )4
3 Booked75% Booked
75% Booked
35 total apartments / 20 apartments booked. 57% apartments booked.
Work Description in Building R1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

R4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
R4Jan 19006101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK27.31 Sq.mts. ( 294 Sq.ft. )5
1 Booked20% Booked
20% Booked
1 BHK27.94 Sq.mts. ( 301 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK36.4 Sq.mts. ( 392 Sq.ft. )5
4 Booked80% Booked
80% Booked
11 total apartments / 6 apartments booked. 54% apartments booked.
Work Description in Building R4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress20% done
20% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress20% done
20% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress52% done
52% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Trinity Developers
for Project
Trinity Galaxy R1 And R4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation