Project overview

Trinity Co Op Hsg Soc Ltd is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800001462. Trinity Co Op Hsg Soc Ltd is located at Cts No.64F6. This is a Ongoing being developed by Pioneer Enterprises.

Trinity Co Op Hsg Soc Ltd has 2 BHK, 3 BHK & SHOP Apartments with carpet areas ranging from 165 to 1018 Sq.ft. Carpet. The Project has total 174 of which 19 are currently available for sale.

Trinity Co Op Hsg Soc Ltd is being developed on a total land area of 51342 Sq.ft. out of which 7701 Sq.ft. i.e 15% is reserved for recreational purposes. Trinity Co Op Hsg Soc Ltd has 4 Wings / Towers Trinity A,Trinity B,Trinity C,Trinity D

ProjectDeveloperLocationPossession
Trinity Co Op Hsg Soc LtdPioneer EnterprisesCts No.64F630-12-2019 00:00:00
Redevelopment Of Tirandaz Subha Niketan Chs Ltd.Heritage Lifestyles & Developers Pvt. Ltd.10/8331-03-2019 00:00:00
AzureOne BuildconPlot 11 Sector 8 Taloja Navi Mumbai31-12-2019 00:00:00
Project Details
  • Project:
    Trinity Co Op Hsg Soc Ltd
  • Location:
  • Cts No.64F6
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2019
Developer Details

  • Developer:
    Pioneer Enterprises
  • Phone:
  • Address:
  • Millenium Tower
Project RERA Details
MAHA REARA No: P51800001462
Project Type Others
RERA Project Status Ongoing
Architect Bhavsar & Associates
Funding Bank THE COSMOS CO OPERATIVE BANK LIMITED
Proposed Possession 30 Dec 2019
Revised Possession 30 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 28 Jul 2017
Last Retrived 26 Jul 2025
Trinity Co Op Hsg Soc Ltd QR Code
Trinity Co Op Hsg Soc Ltd
MahaRERA - P51800001462
Apartment Details & Configuration
TypeArea
2 BHK51.48 Sq.mts. ( 554 Sq.ft. )
2 BHK51.57 Sq.mts. ( 555 Sq.ft. )
2 BHK51.74 Sq.mts. ( 557 Sq.ft. )
2 BHK56.13 Sq.mts. ( 604 Sq.ft. )
2 BHK56.24 Sq.mts. ( 605 Sq.ft. )
2 BHK56.41 Sq.mts. ( 607 Sq.ft. )
2 BHK69.81 Sq.mts. ( 751 Sq.ft. )
1 BHK44.29 Sq.mts. ( 477 Sq.ft. )
2 BHK51.58 Sq.mts. ( 555 Sq.ft. )
2 BHK51.61 Sq.mts. ( 556 Sq.ft. )
2 BHK51.76 Sq.mts. ( 557 Sq.ft. )
2 BHK55.84 Sq.mts. ( 601 Sq.ft. )
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )
2 BHK56.28 Sq.mts. ( 606 Sq.ft. )
2 BHK56.31 Sq.mts. ( 606 Sq.ft. )
2 BHK56.52 Sq.mts. ( 608 Sq.ft. )
2 BHK57.25 Sq.mts. ( 616 Sq.ft. )
2 BHK51.34 Sq.mts. ( 553 Sq.ft. )
2 BHK51.37 Sq.mts. ( 553 Sq.ft. )
2 BHK51.44 Sq.mts. ( 554 Sq.ft. )
2 BHK55.67 Sq.mts. ( 599 Sq.ft. )
2 BHK55.92 Sq.mts. ( 602 Sq.ft. )
2 BHK56 Sq.mts. ( 603 Sq.ft. )
2 BHK56.25 Sq.mts. ( 605 Sq.ft. )
2 BHK67.21 Sq.mts. ( 723 Sq.ft. )
3 BHK92.38 Sq.mts. ( 994 Sq.ft. )
3 BHK92.68 Sq.mts. ( 998 Sq.ft. )
3 BHK94.3 Sq.mts. ( 1015 Sq.ft. )
3 BHK94.47 Sq.mts. ( 1017 Sq.ft. )
3 BHK94.6 Sq.mts. ( 1018 Sq.ft. )
SHOP15.29 Sq.mts. ( 165 Sq.ft. )
SHOP16.17 Sq.mts. ( 174 Sq.ft. )
SHOP16.81 Sq.mts. ( 181 Sq.ft. )
SHOP17.33 Sq.mts. ( 187 Sq.ft. )
SHOP19.64 Sq.mts. ( 211 Sq.ft. )
SHOP20.25 Sq.mts. ( 218 Sq.ft. )
SHOP27.44 Sq.mts. ( 295 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Trinity Co Op Hsg Soc Ltdlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Done
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Done
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Done
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
Done
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Done
Water Supply90% completed
90% Complete
Work In Progress
Buildings / Wings in Trinity Co Op Hsg Soc Ltd
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Trinity Co Op Hsg Soc Ltd by Pioneer Enterpriseslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

51342 Sq. ft.

Project Area

7701 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

174 apartments in total
Total
174
Booked
155
Available
19

Saleable Area Statistics (Sq. ft.)

114219 Total
Total
114219
Booked
98060
Available
16160
Total 174 apartments in project. 155 apartments booked. 89% apartments booked.
Total 114219 Sq.ft. saleable area. 98060 saleable area booked.
86% area booked.

Trinity A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity AJan 1900131111033
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK51.48 Sq.mts. ( 554 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK51.57 Sq.mts. ( 555 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK51.74 Sq.mts. ( 557 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK56.13 Sq.mts. ( 604 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK56.24 Sq.mts. ( 605 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK56.41 Sq.mts. ( 607 Sq.ft. )9
9 Booked100% Booked
100% Booked
2 BHK69.81 Sq.mts. ( 751 Sq.ft. )2
2 Booked100% Booked
100% Booked
33 total apartments / 33 apartments booked. 100% apartments booked.
Work Description in Building Trinity ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Trinity B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity BJan 1900131111047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.29 Sq.mts. ( 477 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK51.57 Sq.mts. ( 555 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.58 Sq.mts. ( 555 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.61 Sq.mts. ( 556 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.76 Sq.mts. ( 557 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.84 Sq.mts. ( 601 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.2 Sq.mts. ( 605 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK56.28 Sq.mts. ( 606 Sq.ft. )10
9 Booked90% Booked
90% Booked
2 BHK56.31 Sq.mts. ( 606 Sq.ft. )19
18 Booked94% Booked
94% Booked
2 BHK56.52 Sq.mts. ( 608 Sq.ft. )9
8 Booked88% Booked
88% Booked
2 BHK57.25 Sq.mts. ( 616 Sq.ft. )1
1 Booked100% Booked
100% Booked
47 total apartments / 44 apartments booked. 93% apartments booked.
Work Description in Building Trinity BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Trinity C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity CJan 1900131111047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK51.34 Sq.mts. ( 553 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.37 Sq.mts. ( 553 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.44 Sq.mts. ( 554 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK51.58 Sq.mts. ( 555 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.67 Sq.mts. ( 599 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK55.92 Sq.mts. ( 602 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK56 Sq.mts. ( 603 Sq.ft. )10
10 Booked100% Booked
100% Booked
2 BHK56.24 Sq.mts. ( 605 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK56.25 Sq.mts. ( 605 Sq.ft. )10
9 Booked90% Booked
90% Booked
47 total apartments / 46 apartments booked. 97% apartments booked.
Work Description in Building Trinity CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Trinity D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Trinity DJan 19001410110123
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK67.21 Sq.mts. ( 723 Sq.ft. )13
11 Booked84% Booked
84% Booked
3 BHK92.38 Sq.mts. ( 994 Sq.ft. )12
6 Booked50% Booked
50% Booked
3 BHK92.68 Sq.mts. ( 998 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.3 Sq.mts. ( 1015 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.47 Sq.mts. ( 1017 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.6 Sq.mts. ( 1018 Sq.ft. )12
6 Booked50% Booked
50% Booked
SHOP15.29 Sq.mts. ( 165 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.17 Sq.mts. ( 174 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP16.81 Sq.mts. ( 181 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP17.33 Sq.mts. ( 187 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP19.64 Sq.mts. ( 211 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.25 Sq.mts. ( 218 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP27.44 Sq.mts. ( 295 Sq.ft. )1
1 Booked100% Booked
100% Booked
47 total apartments / 32 apartments booked. 68% apartments booked.
Work Description in Building Trinity DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Pioneer Enterprises
for Project
Trinity Co Op Hsg Soc Ltd
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation