Tridhaatu Kshitij is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900009306. Tridhaatu Kshitij is located at Final Plot No 230. This is a Ongoing being developed by Tridhaatu Construction Private Limited.

Tridhaatu Kshitij has WING A 2BHK, WING A 3BHK, WING A 4.5BHK, WING A 4BHK, WING A Duplex, WING B 2BHK, WING B 3BHK & WING B 4.5BHK DUPLEX Apartments with carpet areas ranging from 1108 to 900 Sq.ft. Carpet. The Project has total 81 of which 47 are currently available for sale.

Tridhaatu Kshitij is being developed on a total land area of 36993 Sq.ft. out of which 5549 Sq.ft. i.e 15% is reserved for recreational purposes. Tridhaatu Kshitij has 1 Wings / Towers Tridhaatu Kshitij

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tridhaatu Kshitij
  • Location:
  • Final Plot No 230
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2023
Developer Details

  • Developer:
    Tridhaatu Construction Private Limited
  • Phone:
  • Address:
  • Tridhaatu Aum
Project RERA Details
MAHA REARA No: P51900009306
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Planet E Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2023
Revised Possession 30 Dec 2023
Extended Possession
Litigations No Litigations
Last Modified 08 May 2019
Last Retrived 26 Jul 2025
Tridhaatu Kshitij QR Code
Tridhaatu Kshitij
MahaRERA - P51900009306
Apartment Details & Configuration
TypeArea
WING A 2BHK77.02 Sq.mts. ( 829 Sq.ft. )
WING A 2BHK77.52 Sq.mts. ( 834 Sq.ft. )
WING A 3BHK128.13 Sq.mts. ( 1379 Sq.ft. )
WING A 3BHK128.79 Sq.mts. ( 1386 Sq.ft. )
WING A 4.5BHK224.57 Sq.mts. ( 2417 Sq.ft. )
WING A 4BHK159.71 Sq.mts. ( 1719 Sq.ft. )
WING A 4BHK171.9 Sq.mts. ( 1850 Sq.ft. )
WING A Duplex304.71 Sq.mts. ( 3280 Sq.ft. )
WING B 2BHK83.64 Sq.mts. ( 900 Sq.ft. )
WING B 3BHK102.92 Sq.mts. ( 1108 Sq.ft. )
WING B 3BHK108.77 Sq.mts. ( 1171 Sq.ft. )
WING B 4.5BHK DUPLEX195.92 Sq.mts. ( 2109 Sq.ft. )
WING B 4.5BHK DUPLEX195.94 Sq.mts. ( 2109 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tridhaatu Kshitijlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Substation Only
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Norms
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Septic Tank
Solid Waste Management And Disposal
Only Vermiculture Bins
Storm Water Drains
Internal Swd Within Our Property
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
From Mcgm
Buildings / Wings in Tridhaatu Kshitij
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tridhaatu Kshitij by Tridhaatu Construction Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

36993 Sq. ft.

Project Area

5549 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

81 apartments in total
Total
81
Booked
34
Available
47

Saleable Area Statistics (Sq. ft.)

102885 Total
Total
102885
Booked
40010
Available
62876
Total 81 apartments in project. 34 apartments booked. 41% apartments booked.
Total 102885 Sq.ft. saleable area. 40010 saleable area booked.
39% area booked.

Tridhaatu Kshitij

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tridhaatu KshitijDec 20223313100167
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
WING A 2BHK77.02 Sq.mts. ( 829 Sq.ft. )5
3 Booked60% Booked
60% Booked
WING A 2BHK77.52 Sq.mts. ( 834 Sq.ft. )18
12 Booked66% Booked
66% Booked
WING A 3BHK128.13 Sq.mts. ( 1379 Sq.ft. )5
2 Booked40% Booked
40% Booked
WING A 3BHK128.79 Sq.mts. ( 1386 Sq.ft. )18
12 Booked66% Booked
66% Booked
WING A 4.5BHK224.57 Sq.mts. ( 2417 Sq.ft. )4
None Booked0% Booked
0% Booked
WING A 4BHK159.71 Sq.mts. ( 1719 Sq.ft. )3
3 Booked100% Booked
100% Booked
WING A 4BHK171.9 Sq.mts. ( 1850 Sq.ft. )1
1 Booked100% Booked
100% Booked
WING A Duplex304.71 Sq.mts. ( 3280 Sq.ft. )1
None Booked0% Booked
0% Booked
WING B 2BHK83.64 Sq.mts. ( 900 Sq.ft. )1
None Booked0% Booked
0% Booked
WING B 3BHK102.92 Sq.mts. ( 1108 Sq.ft. )17
WING B 3BHK108.77 Sq.mts. ( 1171 Sq.ft. )5
None Booked0% Booked
0% Booked
WING B 4.5BHK DUPLEX195.92 Sq.mts. ( 2109 Sq.ft. )1
None Booked0% Booked
0% Booked
WING B 4.5BHK DUPLEX195.94 Sq.mts. ( 2109 Sq.ft. )2
None Booked0% Booked
0% Booked
81 total apartments / 34 apartments booked. 41% apartments booked.
Work Description in Building Tridhaatu KshitijCompletion
Basement (if any)
work-in-progress70% done
70% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Plinth
work-in-progress70% done
70% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress30% done
30% Booked
Stilt Floor
work-in-progress60% done
60% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
work-in-progress70% done
70% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Tridhaatu Construction Private Limited
for Project
Tridhaatu Kshitij
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation