Project overview

Tridhaatu Bhaveshwar Vilas is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800002054. Tridhaatu Bhaveshwar Vilas is located at 17Th Road. This is a On-Going Project being developed by Tridhaatu Bhaveshwar Developers Llp.

Tridhaatu Bhaveshwar Vilas has 2 BHK & 3 BHK Apartments with carpet areas ranging from 704 to 1023 Sq.ft. Carpet. The Project has total 24 of which 4 are currently available for sale.

Tridhaatu Bhaveshwar Vilas is being developed on a total land area of 8208 Sq.ft. Tridhaatu Bhaveshwar Vilas has 1 Wings / Towers Tridhaatu Bhaveshwar Vilas

ProjectDeveloperLocationPossession
Pure GoldSudhir Vasu Shetty119 And 119 131-03-2018 00:00:00
Tulsi ElanzaMetro Capital11A 11B S No 504 50331-12-2019 00:00:00
EdificeBuildproCts 302 Plot No 3431-12-2017 00:00:00
Godrej PrimeGodrej Redevelopers (Mumbai) Pvt. Ltd.Cts Nos.53/Pt And 52/Pt30-05-2023 00:00:00
Satra HarmonyRrb Realtors Pvt Ltd.831 -Pt31-12-2019 00:00:00
Runwal Forest Tower 1-4Wheelabrator Alloy Castings LimitedPt.596-598, 602/1-9, 606/1-83, 605/1-17, 607A607d596/1-6, 601-606, 599A/1-81, 607/1-3130-04-2022 00:00:00
Krishvi ResidencyShagun Chembur (Aop)176031-12-2019 00:00:00
Stella Sapphire B WingVaibhavlaxmi Builders And Developers51 Part31-12-2018 00:00:00
Little Malabar HillPardis Construction Llp267/1 And 267/2, Cts No 267 Part30-09-2020 00:00:00
Central ParkShree Ganesh Enterprises552/1 To 9 /14-A, 55231-12-2019 00:00:00
Midas-Bhakti MeadowsIrene Edwyn Dmello4530-06-2019 00:00:00
Srushti KiranChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Kalpana SrushtiChinnaiah GowdaMumbai Suburban, 40008901-09-2022 00:00:00
Srushti GaganChinnaiah Gowda400089, Mumbai Suburban01-09-2022 00:00:00
Poonam EnclavePrakash PatelMumbai Suburban, 40007131-12-2015 00:00:00
Tilak Nagar Union Co-Operative Housing Society LtdOm Sai EnterprisesMumbai Suburban31-12-2021 00:00:00
Srushti GardenChinnaiah Gowda400089, Mumbai Suburban01-09-2022 00:00:00
Redevelopment Of Building No 96Aditya EnterprisesCts No. 507 Pt31-05-2019 00:00:00
Godrej CentralGodrej Landmark Redevelopers Private LimitedCts 49/Pt, 5630-03-2021 00:00:00
PanoramaEkta Shubham VentureCts No 1746/2131-12-2019 00:00:00
Lucky Chs LtdDsd Infrastructure Pvt. Ltd.1417, 1417/1 To 631-03-2019 00:00:00
Vishnubhuvan Chs LtdShree S S Developers Private Limited222Pt30-12-2022 00:00:00
Vandana ArtemisThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Building On Plot Bearing Cts No 833 Pt At Mhada Layout As Rna Continental Subhash Nagar Mumbai 71G A Builders Pvt Ltd.833 Pt At Mhada Layout As Rna Continental Subhash Nagar Chembur East Mumbai 40007131-01-2021 00:00:00
Veena SerenityVeena Realcon Private Limited58-Pt01-12-2021 00:00:00
LegranzEkta Shubham VenturePlot No. 5, Cts No. 11431-12-2018 00:00:00
OrionNivaan Infratech Private LimitedCts Nos. 471 47231-12-2017 00:00:00
Lakshmi VaniTridhaatu Realty & Infra Pvt LimitedPlotno53 And 54Cts No 936 936-1 936-2 936-3 936-4 936-5 936-6 936-7 936-8 936-9 936-10 936-11 936 1230-04-2018 00:00:00
Sabari ShobhaSabari Developers LlpCts 1612, 1612-1 To 4 Chembur Village30-11-2020 00:00:00
Vishwas ChsSiroya Yug Realtors400071, Mumbai Suburban15-08-2018 00:00:00
Marvel Gold - Phase ISwaroop Constructions Private Limited408 Part 408/1 To 3 412 Part 412/2 To 10 412/18 412/20 To 5430-12-2021 00:00:00
Rite SkyluxeRite Developers Pvt. Ltd.Cts No 831-Pt 831-59 To 7031-12-2018 00:00:00
GeetanjaliKukreja Construction CoPlot No. 184. Ss Iii, M West Ward, 15Th Road, Village Chembur31-12-2017 00:00:00
Aaradhya OneAm Developers561A31-12-2018 00:00:00
Srishti SolitaireSiddhivinayak EnterpriseCts 242A - 242C31-12-2018 00:00:00
Harvest MoonCalvin PropertiesCts No 1389 Plot No 460 Chembur31-12-2019 00:00:00
Shweta ChsAtharva DevelopersChembur Village, C T S No 56 Pt, Building No. 8 Of Sahakar Nagar -131-12-2018 00:00:00
Trishabh SignetDimension Housing Realty Llp129531-12-2019 00:00:00
Chembur Shri Sai Shraddha ChsUnity Land Consultancy116 Part31-12-2018 00:00:00
Shree DeeplaxamiPuro Constructions1332, 44631-12-2019 00:00:00
Shree Samarth Galaxy Sra Chs LtdShree S S Developers Private Limited222Pt Of Village Kanjur31-12-2018 00:00:00
Ariso ApartmentKyraa Housing Projects828 Part/ 64 To 75, Cts No 828 Part30-12-2024 00:00:00
Amber EmpireAmber Capro Private Limited556 Part31-03-2019 00:00:00
Dev DarshanCity Estate Developers LimitedCts No 636, 636 1 To 16 & Cts No 634, 6341 To 2630-12-2022 00:00:00
49 ElinaHuges Real Estates Developers Llp3531-12-2019 00:00:00
Vishnu ApolloThree Towers Lifespace Llp54 Part30-12-2021 00:00:00
Shree Shivsamarth ResidencyShree Shiv Samarth Developers89, 88/1 Pt, 88Pt, 87/1 To 431-12-2018 00:00:00
Vardhan HeightsVardhan Housing711, 710, 712/1 To 7, 709/1 To 11, 712, 711/1 To 14, 716 And Land Under Nilamutha Line, 710/1 To 23, Cts No 708 Pt, 715/1 To 3630-12-2022 00:00:00
Sai SansarConcrete Builders1274/1, Cts 1274, Plot No 42730-12-2023 00:00:00
Shree Saraswati Chsl Plot 8 ANav Durga Construction CompanyCts No 8 A31-12-2018 00:00:00
Skyline Sparkle Wing C Skyline Greathills39331-12-2019 00:00:00
Amrita PriveSkree Krishna PropertiesCts No. 1450, Plot No 532 Of Ss Ii30-06-2019 00:00:00
Project Details
  • Project:
    Tridhaatu Bhaveshwar Vilas
  • Location:
  • 17Th Road
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Oct 2018
Developer Details

  • Developer:
    Tridhaatu Bhaveshwar Developers Llp
  • Phone:
  • Address:
  • 3Rd Floor D Wing, Tridhaatu Aum, Sri Swati Chsl, Behind Borbadevi Mandir, Govandi East, 400088
Project RERA Details
MAHA REARA No: P51800002054
Project Type Residential
RERA Project Status On-Going Project
Architect Deole Bros
Funding Bank HDFC Bank
Proposed Possession 31 Oct 2018
Revised Possession 30 Dec 2023
Extended Possession 29 Dec 2024
Litigations No Litigations
Last Modified 24 Jan 2024
Last Retrived 28 Jul 2025
Tridhaatu Bhaveshwar Vilas QR Code
Tridhaatu Bhaveshwar Vilas
MahaRERA - P51800002054
Apartment Details & Configuration
TypeArea
2 BHK65.36 Sq.mts. ( 704 Sq.ft. )
2 BHK65.89 Sq.mts. ( 709 Sq.ft. )
2 BHK66.41 Sq.mts. ( 715 Sq.ft. )
2 BHK68.23 Sq.mts. ( 734 Sq.ft. )
2 BHK69.23 Sq.mts. ( 745 Sq.ft. )
2 BHK69.73 Sq.mts. ( 751 Sq.ft. )
2 BHK72.52 Sq.mts. ( 781 Sq.ft. )
2 BHK74.35 Sq.mts. ( 800 Sq.ft. )
3 BHK86.36 Sq.mts. ( 930 Sq.ft. )
3 BHK88.38 Sq.mts. ( 951 Sq.ft. )
3 BHK94.41 Sq.mts. ( 1016 Sq.ft. )
3 BHK94.7 Sq.mts. ( 1019 Sq.ft. )
3 BHK95.01 Sq.mts. ( 1023 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tridhaatu Bhaveshwar Vilaslast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Sub Station
Energy management
Na
Fire Protection And Fire Safety Requirements
As Per Cfo Norms
Landscaping & Tree Planting
As Per Tree Noc
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
No Septic Tank
Solid Waste Management And Disposal25% completed
25% Complete
Only Vermiculture Bins
Storm Water Drains
Internal Swd Within Our Property
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting
Water Supply
As Per Mcgm
Buildings / Wings in Tridhaatu Bhaveshwar Vilas
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tridhaatu Bhaveshwar Vilas by Tridhaatu Bhaveshwar Developers Llplast updated on 28 Jul 2025 as per information obtained from MARA RERA.

8208 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
20
Available
4

Saleable Area Statistics (Sq. ft.)

20439 Total
Total
20439
Booked
17022
Available
3417
Total 24 apartments in project. 20 apartments booked. 83% apartments booked.
Total 20439 Sq.ft. saleable area. 17022 saleable area booked.
83% area booked.

Tridhaatu Bhaveshwar Vilas

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tridhaatu Bhaveshwar VilasDec 2022151010031
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.36 Sq.mts. ( 704 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.89 Sq.mts. ( 709 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK66.41 Sq.mts. ( 715 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK68.23 Sq.mts. ( 734 Sq.ft. )4
4 Booked100% Booked
100% Booked
2 BHK69.23 Sq.mts. ( 745 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK69.73 Sq.mts. ( 751 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK72.52 Sq.mts. ( 781 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK74.35 Sq.mts. ( 800 Sq.ft. )3
None Booked0% Booked
0% Booked
3 BHK86.36 Sq.mts. ( 930 Sq.ft. )2
2 Booked100% Booked
100% Booked
3 BHK88.38 Sq.mts. ( 951 Sq.ft. )5
5 Booked100% Booked
100% Booked
3 BHK94.41 Sq.mts. ( 1016 Sq.ft. )1
None Booked0% Booked
0% Booked
3 BHK94.7 Sq.mts. ( 1019 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK95.01 Sq.mts. ( 1023 Sq.ft. )2
2 Booked100% Booked
100% Booked
24 total apartments / 20 apartments booked. 83% apartments booked.
Work Description in Building Tridhaatu Bhaveshwar VilasCompletion
Excavation
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress80% done
80% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress90% done
90% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress90% done
90% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress95% done
95% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Tridhaatu Bhaveshwar Developers Llp
for Project
Tridhaatu Bhaveshwar Vilas
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation