Project overview

Transcon Triumph Tower 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800005361. Transcon Triumph Tower 1 is located at 704 Pt. This is a Ongoing being developed by Transcon Developers Pvt. Ltd..

Transcon Triumph Tower 1 has 2 BHK, 3 BHK, 3 BHK Type 1, 3 BHK Type 2 & 4 BHK Apartments with carpet areas ranging from 1281 to 813 Sq.ft. Carpet. The Project has total 210 of which 1 are currently available for sale.

Transcon Triumph Tower 1 is being developed on a total land area of 13819 Sq.ft. Transcon Triumph Tower 1 has 1 Wings / Towers Tower 1

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Transcon Triumph Tower 1
  • Location:
  • 704 Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Transcon Developers Pvt. Ltd.
  • Phone:
  • Address:
  • Transcon Triumph
Project RERA Details
MAHA REARA No: P51800005361
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Shri Suresh A. Gaikwad - Skytech Consultants
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession 30 Dec 2022
Extended Possession
Litigations No Litigations
Last Modified 11 Aug 2017
Last Retrived 26 Jul 2025
Transcon Triumph Tower 1 QR Code
Transcon Triumph Tower 1
MahaRERA - P51800005361
Apartment Details & Configuration
TypeArea
2 BHK75.53 Sq.mts. ( 813 Sq.ft. )
3 BHK124.95 Sq.mts. ( 1345 Sq.ft. )
3 BHK Type 1119.01 Sq.mts. ( 1281 Sq.ft. )
3 BHK Type 2124.12 Sq.mts. ( 1336 Sq.ft. )
4 BHK194.81 Sq.mts. ( 2097 Sq.ft. )
4 BHK203.18 Sq.mts. ( 2187 Sq.ft. )
4 BHK269.5 Sq.mts. ( 2901 Sq.ft. )
4 BHK276.94 Sq.mts. ( 2981 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Transcon Triumph Tower 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space20% completed
20% Complete
Will Be Handed Over To Apex Body
Air Conditioned Triple Height Grand Entrance Lobby100% completed
95% Complete
Completed
Barbeque Corner
To Be Handed Over To Apex Body
CCTV Monitoring of Common Areas
To Be Handed Over To Apex Body
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station22% completed
22% Complete
To Be Handed Over To Apex Body
Energy management2% completed
2% Complete
As Per Moef To Be Handed Over To Apex Body
Fire Protection And Fire Safety Requirements77% completed
77% Complete
As Per Cfo To Be Handed Over To Apex Body
Fitness Center
To Be Handed Over To Apex Body
Landscaping & Tree Planting20% completed
20% Complete
To Be Handed Over To Apex Body
Multipurpose Court
To Be Handed Over To Apex Body
Open Parking
In Progress
Servant Washroom at Mid Landing of 1 Staircase
To Be Handed Over After Oc
Sewerage (Chamber, Lines, Septic Tank , STP)77% completed
77% Complete
Sewage Lines Have Been Done In Access Road Portion
Solid Waste Management And Disposal77% completed
77% Complete
To Be Handed Over To Apex Body
Storm Water Drains77% completed
77% Complete
Swd To Be Handed Over To Apex Body
Street Lighting100% completed
95% Complete
To Be Handed Over To Apex Body
Swimming Pool
To Be Handed Over To Apex Body
Tot Lot Area
To Be Handed Over To Apex Body
Treatment And Disposal Of Sewage And Sullage Water77% completed
77% Complete
As Per Moef Requirements To Be Handed Over To Apex
Water Conservation, Rain water Harvesting77% completed
77% Complete
Rwh To Be Handed Over To Apex Body
Water Supply77% completed
77% Complete
Bmc Water Connection To Be Handed Over To Apexbody
Buildings / Wings in Transcon Triumph Tower 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Transcon Triumph Tower 1 by Transcon Developers Pvt. Ltd.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

13819 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

210 apartments in total
Total
210
Booked
209
Available
1

Saleable Area Statistics (Sq. ft.)

244391 Total
Total
244391
Booked
243110
Available
1281
Total 210 apartments in project. 209 apartments booked. 99% apartments booked.
Total 244391 Sq.ft. saleable area. 243110 saleable area booked.
99% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Dec 20213211040411
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK75.53 Sq.mts. ( 813 Sq.ft. )98
98 Booked100% Booked
100% Booked
3 BHK124.95 Sq.mts. ( 1345 Sq.ft. )6
6 Booked100% Booked
100% Booked
3 BHK Type 1119.01 Sq.mts. ( 1281 Sq.ft. )55
54 Booked98% Booked
98% Booked
3 BHK Type 2124.12 Sq.mts. ( 1336 Sq.ft. )33
33 Booked100% Booked
100% Booked
4 BHK194.81 Sq.mts. ( 2097 Sq.ft. )4
4 Booked100% Booked
100% Booked
4 BHK203.18 Sq.mts. ( 2187 Sq.ft. )10
10 Booked100% Booked
100% Booked
4 BHK269.5 Sq.mts. ( 2901 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHK276.94 Sq.mts. ( 2981 Sq.ft. )3
3 Booked100% Booked
100% Booked
210 total apartments / 209 apartments booked. 99% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
work-in-progress85% done
85% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress57% done
57% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress57% done
57% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress76% done
76% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress76% done
76% Booked
Plinth
work-in-progress85% done
85% Booked
Podiums (if any)
work-in-progress99% done
99% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
work-in-progress86% done
86% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
work-in-progress85% done
85% Booked
X number of Podiums
work-in-progress99% done
99% Booked
X number of Slabs of Super Structure
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Transcon Developers Pvt. Ltd.
for Project
Transcon Triumph Tower 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation