Project overview

Tower 28 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800009511. Tower 28 is located at 19/1 To 67. This is a Ongoing being developed by Shiv Shakti Builders And Developers.

Tower 28 has 2 BHK Apartments with carpet areas ranging from 0 to 0 Sq.ft. Carpet. The Project has total 321 of which 11 are currently available for sale.

Tower 28 is being developed on a total land area of 120664 Sq.ft. out of which 8814 Sq.ft. i.e 7% is reserved for recreational purposes. Tower 28 has 7 Wings / Towers A Wing,B Wing,C Wing Referred In Ii Phase,D Wing,E Wing,F Wing Referred In Ii Phase,G Wing Referred In 2Nd Phase

ProjectDeveloperLocationPossession
Om HeightsKosmos &Amp; Apple RealtyMalad31-12-2020 00:00:00
Shah Arcade IiiShah Housecon Private Limited502 502 Pt And 502/301 To 388 510 And 510/1 To 5 512 513 513 /1 To 34 515 516 And 516/1 To 14 51730-07-2018 00:00:00
Tower 28Shiv Shakti Builders And Developers19/1 To 6730-06-2022 00:00:00
Crystal PrideCrystal Construction Company401, 401/1 To 401/25, 402 Part31-12-2019 00:00:00
Udyam Kunj Chs Redevelopment Phase IMahendra Mhatre40009731-12-2017 00:00:00
Redevelopment Of Niwara Co-Op Hsg Society LtdThe Niwara Co-Operative Housing Society LtdCts No. 155A30-06-2024 00:00:00
Das Bhavan ChslRishabraj Estate Developers Pvt Ltd777 1 To 4, 77731-12-2017 00:00:00
Western WoodsKarmvir Mumbai Housing Private Limited1B/9A31-12-2018 00:00:00
UjvalParanjape Schemes (Construction) Ltd23 And Part Of 24, Cts No.63-A Or Originally Bearing Plot No 2231-12-2019 00:00:00
Sun-Vision AvenueWoodland Constructions Pvt Ltd400064, Mumbai Suburban31-03-2018 00:00:00
Saylee EnclaveFunsign Housing Pvt. Ltd960/ 1 To 7, 96030-10-2021 00:00:00
Chandraraj ComplexShree Sai Shraddha Associates15/C20-03-2018 00:00:00
Navjeevan HeightsKonark Shakti Group Of CompaniesCts No 21B30-09-2018 00:00:00
Raj Rani PrideGeetaraj Realtors463 463/1 To 463/731-12-2020 00:00:00
111 Hyde ParkMdm Realty111/96/C/130-06-2022 00:00:00
Onyx Apartment - Redevelopment Of Kunfayakun Chsl BuildingRefab Construction (India) Pvt. Ltd.21A/331-01-2018 00:00:00
Hiramani EnclaveDamji Hirji & Company28/1 To 8, Cts No. 28A01-06-2019 00:00:00
Mandlik Nagar Chs Ltd Phase Ii Rehab Wing E Pt And FTriumph Builders Llp29 Pt31-12-2018 00:00:00
Om Ganesh KrupaDharma Construction21A/530-06-2019 00:00:00
Madhav RealityJayesh Hiralal Gothi823/A 823/1 And 818 Survey Number 28415-06-2022 00:00:00
Divyam ResidencyBhavesh Mahendra Mehta437 1 To 11, 43731-12-2017 00:00:00
Chandak StellaSaroj Landmark Realty LlpCts 914 Survey No 51 Hissa 2 Part And Surbey No 52 Hissa 1 Part30-03-2022 00:00:00
Redevelopment Of Abhiram ChslPranav Constructions LimitedCts No 1344/A01-06-2023 00:00:00
Romell Aether Wing B1Romell Properties Private Limited175/4 And 175/530-12-2021 00:00:00
Sanghvi JewelSanghvi RealtorsCts 572A 572B 572A1 To 16 572A20 To 44 572A17a And B 572 A 18A And B 572A 19A And B31-12-2018 00:00:00
Sheetal Vaibhav KutirD.G.Land Developers Pvt LtdCts 42401-07-2023 00:00:00
Redevelopment Of Malad Rajhans ChslPranav Constructions LimitedCts No 34 Village Pahadi Goregaon Taluka Borivali31-03-2019 00:00:00
Redevelopment Of Lamplight ChslShree Mahavir EstatesSurvey No.287, Cts.21 Pt, Plot 5/631-12-2019 00:00:00
Malad Sati Darshan Chs Ltd.Goyal Sati Darshan Llp581, 58031-05-2026 00:00:00
Sheetal AnupamDgs Township Pvt Ltd684 1 To 9, 684/68415-05-2025 00:00:00
Asmi Business CentreAsmi CorporationSurvey No.3 Part Hissa No.6 Old Cts No.51 Part And New Cts No 51A/B31-12-2025 00:00:00
Leela AashishLeela Creators400097, Mumbai Suburban31-12-2020 00:00:00
Garnet PaladiumGarnet Construction Limited1B/10A31-12-2018 00:00:00
Asmita Sand DunesSun Developers1224A/1 And 1224A/230-06-2019 00:00:00
SolitaireSolitaire ConstructionsCts No 855 C31-03-2019 00:00:00
Victory DivineYashodanand Realtors960/830-09-2020 00:00:00
Makarani Pada Phase 1K D Builders571, 572/169-264, 574/1-11, 575, 572/273-288, 572/293-295, 575/, 571/1-1930-03-2024 00:00:00
63 Goldmedal AvenueRishabraj Estate Developers Pvt Ltd906 906/1 To 2930-05-2027 00:00:00
AstrumUpvan Developers97A/2C/4, 97A/2C/231-12-2024 00:00:00
Redevelopment Of Gala Apartments ChslPranav Constructions Limited38 38/1 To 630-09-2024 00:00:00
SmritiMahesh Balkrishna Sambhus11631-03-2026 00:00:00
Malad Amar Co-Operative Housing Socity Ltd.Ardhya Universal Llp16731-05-2025 00:00:00
VivantaKeyland Developers Private Limited181, 181/1 To 7131-12-2029 00:00:00
Saptaratna TowersRaja Constructions Company33/1231-12-2017 00:00:00
Romell Aether Wing B 2-Phase 2 34Th To 39Th FloorsRomell Properties Private Limited175/5, 175/430-12-2025 00:00:00
Atharva ComplexAtharva RealtorsPodar Road31-12-2016 00:00:00
Mangal Business Park - Gautam ApartmentMangal Buildhome Private Limited685A31-03-2027 00:00:00
Harshail Emerald ApartmentHarshmaan Spaces Llp97A/1131-01-2027 00:00:00
Pearl GardensShiv Enterprises1373/931-12-2026 00:00:00
Express Zone B WingCello Sonal Construction581/C/1, Cts No. 1B/1/B/130-06-2024 00:00:00
Sri Balaji EnclaveAni Anu Developers Private Limited1067 A2 To 1067 A431-12-2019 00:00:00
Upper East 97Prima Terra Buildtech Pvt. Ltd.97A/2430-12-2022 00:00:00
Project Details
  • Project:
    Tower 28
  • Location:
  • 19/1 To 67
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Shiv Shakti Builders And Developers
  • Phone:
  • Address:
  • Shankar Dham - 2
Project RERA Details
MAHA REARA No: P51800009511
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Dot T Architects
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession 31 Dec 2024
Litigations No Litigations
Last Modified 21 Mar 2025
Last Retrived 26 Jul 2025
Tower 28 QR Code
Tower 28
MahaRERA - P51800009511
Apartment Details & Configuration
TypeArea
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )
1 BHK42.18 Sq.mts. ( 454 Sq.ft. )
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )
2 BHK0 Sq.mts. ( 0 Sq.ft. )
1 BHK40.51 Sq.mts. ( 436 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tower 28last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Approved
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
As Per Reliance Approval
Elevator
As Per Approved Make
Energy management
Na
Entrance lobby
As Per Approved Make
Fintness Center
As Per Approved Make
Fire Protection And Fire Safety Requirements
As Per Cfo Noc
Landscaping & Tree Planting
Shrubs And Plants
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Mcgm Connection
Solid Waste Management And Disposal
Na
Storm Water Drains
As Per Drainage Approval
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
As Per Mep Drawing
Water Conservation, Rain water Harvesting
Na
Water Supply
Mcgm Supply
Buildings / Wings in Tower 28
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tower 28 by Shiv Shakti Builders And Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

120664 Sq. ft.

Project Area

8814 Sq. ft.

Recreational Open Space

Total 7

Wings / Towers in Project

Apartments Statistics

321 apartments in total
Total
321
Booked
310
Available
11

Saleable Area Statistics (Sq. ft.)

170206 Total
Total
170206
Booked
164852
Available
5354
Total 321 apartments in project. 310 apartments booked. 96% apartments booked.
Total 170206 Sq.ft. saleable area. 164852 saleable area booked.
97% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.16 Sq.mts. ( 443 Sq.ft. )18
18 Booked100% Booked
100% Booked
1 BHK41.34 Sq.mts. ( 445 Sq.ft. )20
19 Booked95% Booked
95% Booked
1 BHK41.81 Sq.mts. ( 450 Sq.ft. )26
26 Booked100% Booked
100% Booked
1 BHK42.18 Sq.mts. ( 454 Sq.ft. )16
16 Booked100% Booked
100% Booked
80 total apartments / 79 apartments booked. 98% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )80
79 Booked98% Booked
98% Booked
80 total apartments / 79 apartments booked. 98% apartments booked.
Work Description in Building B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C Wing Referred In Ii Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing Referred In Ii PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building C Wing Referred In Ii PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingJun 2021221111055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.51 Sq.mts. ( 436 Sq.ft. )81
74 Booked91% Booked
91% Booked
81 total apartments / 74 apartments booked. 91% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress70% done
70% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress30% done
30% Booked
Sanitary Fittings within the flats / premises
work-in-progress30% done
30% Booked
Slabs of Super Structure
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress60% done
60% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress60% done
60% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress55% done
55% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress85% done
85% Booked

E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
E WingJun 2021221111061
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK57.51 Sq.mts. ( 619 Sq.ft. )80
78 Booked97% Booked
97% Booked
80 total apartments / 78 apartments booked. 97% apartments booked.
Work Description in Building E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F Wing Referred In Ii Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
F Wing Referred In Ii PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building F Wing Referred In Ii PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

G Wing Referred In 2Nd Phase

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
G Wing Referred In 2Nd PhaseJun 20210000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK0 Sq.mts. ( 0 Sq.ft. )0
None Booked0% Booked
0% Booked
Work Description in Building G Wing Referred In 2Nd PhaseCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Shiv Shakti Builders And Developers
for Project
Tower 28
last updated on 26 Jul 2025 as per information obtained from MARA RERA.