Project overview

Tokyo Bay Phase - 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700000618. Tokyo Bay Phase - 1 is located at 20/1-Pt, 20/2B-Pt . This is a Ongoing being developed by Puranik Tokyo Bay Private Limited.

Tokyo Bay Phase - 1 has 1 BHK & 2 BHK Apartments with carpet areas ranging from 407 to 608 Sq.ft. Carpet. The Project has total 168 of which 2 are currently available for sale.

Tokyo Bay Phase - 1 is being developed on a total land area of 51431 Sq.ft. out of which 10776 Sq.ft. i.e 21% is reserved for recreational purposes. Tokyo Bay Phase - 1 has 2 Wings / Towers Wing A - Yuki,Wing B - Saki

ProjectDeveloperLocationPossession
Pushpanjali Residency Phase IiiShriraam Pioneer Developers Private Limited99/2, 99/4B, 101/3, 97/1, 58/1, 98/1A, 98/1B, 99/6 59/1A 99/4A, 59/230-12-2022 00:00:00
Ace Square Phase 1Anant SquareSurvey 2-28, 2-19, 2-3331-12-2017 00:00:00
Tokyo Bay Phase - 2APuranik Tokyo Bay Private Limited21/9-Pt 22/1-Pt 22/5-Pt 21/11A Pt 23/4 Pt30-12-2024 00:00:00
Platinum TowerHaware's Housing Development Finance Corporation Ltd.19/28 19/29 19/30 20/05 21/16 20/0630-09-2022 00:00:00
Puraniks CapitolPuranik Builders Limited35/2, 3,4 And 530-12-2036 00:00:00
Mahavir Kalpavruksha - Oak, Tulip, Alcacia, AlmondDamji Shamji Realty Private Limited86/1A,2,3A,1B,1C, 87/1D,4D,87/4D, 77/1, 87/1E, 1F, 1H, 87/2, 3, 4A, 4B30-12-2021 00:00:00
Pride Residency DaffodilSahil Developers36/2-A31-12-2018 00:00:00
Satgurus SolitaireBuildwell Land Developers Private Limited91, Owale, Thane31-12-2017 00:00:00
Rosa Oasis Phase 2Uma EnterprisesS.No. 124/2/3, 125/2, 125/3/131-12-2018 00:00:00
Elita D3Vihang Infrastructure Pvt Ltd69/1/1,69/1/2,69/3A/1,A/2,4,5/1,5/2,6,72/4B,4C,4D,4E,74/1/1B, 1/2B,1/2A,1/3A,1/3B,3/1,3/2,5,2/B,2A/1,2A/2,4,75/1/A,1/B,2/B,2/C,77/2,3,1/2,1/3,78/3/B/1,3/B/2,3/B/3,4/A,4/B,3/A/1,3/A/231-12-2029 00:00:00
Commercial Building 10Vihang Infrastructure Pvt Ltd69/1/1,1/2,3A/1,A/2,4,5/1,5/26, 72/4B,4C,4D,4E,74/1/1B,1/2B,1/2A,1/3A,1/3B,3/1,3/2,5,2/B,2A/1,2A/2,4,75/1/A,1/B,2/B,2/C,77/2,3,1/2,1/3,78/3/B/1,3/B/2,3/B/3,4/A,4/B,3/A/1,3/A/2,1/B31-12-2024 00:00:00
Tokyo Bay Phase - 1Puranik Tokyo Bay Private Limited20/1-Pt, 20/2B-Pt 30-10-2023 00:00:00
Rumahbali Phase 2Puranik Builders LimitedNew S No 100-15B, 17 Pt 18 Pt 19Pt And 23Pt, Old S No -197-15B 17 Pt 18 Pt 19Pt And 23Pt30-12-2023 00:00:00
Olive ResidencyGoodwill PropertiesOld S.No. 55 New S.No. 66 H.No. 1/230-12-2021 00:00:00
Mahavir Kalpavruksha - J WingDamji Shamji Realty Pvt.Ltd.Sno 86/1A,2,3A,86/3B,86/3C,87/1A,1B,1C,87/1D,4D,87/4D,77/1,87/1E,1F,1H,87/2,3,4A,4B30-12-2023 00:00:00
Fiama ResidencyFiama Construction CompanyMogharpada S No 57/2B, 57/2C, 57/330-12-2021 00:00:00
Shree Savali Wing BUmesh Raosaheb Pawar Patil HufS No 63 Hissa No 231-07-2019 00:00:00
Ace EnclaveAce Signature Homes Llp70/6, 53/631-12-2026 00:00:00
Rumah Bali Phase 4Puranik Builders LimitedS. No. Old 197 New 100 H. No. 11/1(P), 11/2(P), 12(P), 14(P), 15(P), 17(P), 18(P), 19(P), 19(P), 20(P), 21(P)31-12-2028 00:00:00
Raunak HeightsUnnathi Associates67/8B 67/8A 66/5B30-12-2025 00:00:00
Ashok Smruti DefgM/S Keytech27/631-12-2019 00:00:00
Puranik City Reserva Phase 1Puranik Builders Limited67/1Pt 67/1Pt 1/12-7Pt 1/11-5Pt 1/4-12Pt 55/1Apt 55/1Bpt 54/4Pt 54/3Pt 53/2Pt, 3Pt30-03-2029 00:00:00
Dedhia Elita C WingJaydeep CorporationSurvey No 89 Hissa No 2B And Survey No 9030-06-2018 00:00:00
Ace Square Phase 2Anant Square2-19, 2-28, 2-3330-06-2024 00:00:00
Horizon Heights DShreenath EnterprisesS No 4330-07-2018 00:00:00
Metropolis - Insignia TowersAnant Square4/4, 4/5 And 6/114-04-2026 00:00:00
Raunak 108Unnathi Associates73/1, 73/2, 73/3, 73/430-06-2026 00:00:00
Horizon Palms - IiiKm DevelopersOld S No 63, New S No 10130-12-2024 00:00:00
Kavya ParkShree Construction CompanyS No 29 At Boriwade, Ghodbunder Road, Thane West30-06-2021 00:00:00
Kavya ResidencyKavya Mira Realty39/4,40/B1, 41/2 At Boriwade Ghodbunder Road Sector No 6 Thane West31-12-2019 00:00:00
SubodhNew Homes Corporation17430-09-2020 00:00:00
PelicanM/S Ace Constructions27-2 27-3 27-830-06-2018 00:00:00
Horizon Classique-ISachin EnterprisesTika No-3 Chalta No- 13030-06-2018 00:00:00
Sai PalaceSai DeveopersChalta No 71,7231-03-2018 00:00:00
Mukund NiwasNew Vegas DevelopersChalta No 1930-09-2020 00:00:00
Horizon Classique-2Sachin EnterprisesChalta No.128/129A, Tika No.330-06-2021 00:00:00
Aarambh - CM/S. Annapurna Lifespaces Llp21/11B Pt30-06-2026 00:00:00
Dahlia Bldg A D And EHaware Engineers And Builders Private Limited47/1 48/2 48/3 48/6Ap 48/6B30-04-2019 00:00:00
TaranganMaison Constructions Private LimitedSurvey No.6, Hissa No. 3A And 3B31-05-2018 00:00:00
Pehla Ghar - Shubh Sanket ComplexLaabh RealtorsThane31-12-2020 00:00:00
Horizon Palms IiK M DevelopersS.No. Old 63, New 101, H.No.1/2/2/2-Owale30-04-2022 00:00:00
Sukur Enclave Phase 1Rajaram ConstructionSrno 7-22 7-23 7-25 7-26 Srno 11-7 Vadavli Srno 114-4 Owale Srno 242-1-1C Kavesar31-12-2018 00:00:00
Bhakti Pearl - CBhakti Corporation532, 53331-12-2017 00:00:00
Puranik Home Town - EPuranik Builders LimitedOld 75/Pt New 89/3C Pt And Old 76/5A Pt New 88/5A Pt30-12-2026 00:00:00
AnthuriumAarti EstatesPart Of - 7/15, 8/2/2, 8/4, 8/5, 8/630-10-2023 00:00:00
Shree SankalpShree ConstructionsS No 95/531-07-2019 00:00:00
Delta Greenville - AsterDelta Synergy LlpCts No 258 259/1 260 261 268Pt31-01-2031 00:00:00
Delta Greenville - CedarDelta Synergy LlpCts No 258 259/1 260 261 268Pt31-12-2030 00:00:00
Horizon Pearl IiKm DevelopersOld Survey No 68/131-12-2028 00:00:00
Elysia D-4Vihang Infrastructure Pvt Ltd31-12-2031 00:00:00
Guru AshishShree Gurukrupa Ventures Llp126 Sector 1531-12-2018 00:00:00
Trimity AshwaTrimity Constructions60/531-12-2017 00:00:00
Vihang ValleyVihang Infrastructure Pvt Ltd 74/1/1,74/1/2, 74/1/3, 74/2/A, 2/B, 3,4,5 75/1,2, 72/4, 77/1,2,3 69/1,3A,4,5,6 78/1A,1B,3A30-12-2026 00:00:00
Cosmos Enclave - ChestnutMonarch Developers10 H No 1A30-12-2023 00:00:00
Psk SkylarGururaj Developers118, 113/1630-12-2023 00:00:00
Kirans Shree SmaranKiran Vasant ThandreS No 24 H No 3A30-12-2021 00:00:00
Mahavir Breeze Phase 1Damji Shamji Realty Pvt. Ltd.86/1A 2 3A 3C 84/1A 2 1C 1E 1F 4C 4B 1Z 1D 87/1B 3 4A 1D 4D 87 4D 86/3B 77/1 86/3/231-12-2024 00:00:00
Cascade Avenue BellagioAarsh Construction53/6, 54/5 Village Mogharpada & 70/6(Pt) Village Vadavali31-12-2026 00:00:00
Mahavir Estella - Wing A And BCityscape Construction CoNew S No 52, Hissa No 131-12-2018 00:00:00
Prity Park B And C Bldg Phase 2S D Bhalerao AssociatesOwala31-12-2017 00:00:00
Ace ParksideAarti Estates7/5/1, 7/5/2, 7/631-12-2029 00:00:00
Intelligentia Segment By Haware PropertiesSuresh Kashinath HawareSurvey No 47/231-12-2027 00:00:00
North Imperial Greens -Tower 2Skylark Buildspace Private Limited450 Pt.,449 Pt.,451,455/A Pt.,460Pt.,461 Pt.,464/1 Pt.,465/1,538/1,46331-12-2031 00:00:00
FalconM/S Ace Constructions27-2, 27-3, 27-830-06-2018 00:00:00
Pristine TowerIdeal DevelopersThane, 40061531-12-2017 00:00:00
Tropical Lagoon - 4 -JacarandaSoham Estates240/2 Pt, 240/3, 240/6, 240/7, 240/9, 240/10 Pt31-05-2018 00:00:00
Prathamesh TowersShivam Developers42/131-03-2018 00:00:00
ShantaiJanardhan Sakharam BhoirS.No.42 H.No.5A31-12-2019 00:00:00
Trinity HeightsAnil Thakurdas KursijaS No 23/4,23/5,23/730-05-2023 00:00:00
Project Details
  • Project:
    Tokyo Bay Phase - 1
  • Location:
  • 20/1-Pt, 20/2B-Pt
  • Const. Stage:
    Ongoing
  • Possession:
    30 Oct 2023
Developer Details

  • Developer:
    Puranik Tokyo Bay Private Limited
  • Phone:
  • Address:
  • Puraniks One
Project RERA Details
MAHA REARA No: P51700000618
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Vastushilpa Associates
Funding Bank HDFC BANK
Proposed Possession 30 Oct 2023
Revised Possession 30 Oct 2023
Extended Possession
Litigations No Litigations
Last Modified 18 Jul 2017
Last Retrived 26 Jul 2025
Tokyo Bay Phase - 1 QR Code
Tokyo Bay Phase - 1
MahaRERA - P51700000618
Apartment Details & Configuration
TypeArea
1 BHK TYPE 137.8 Sq.mts. ( 407 Sq.ft. )
1 BHK TYPE 237.97 Sq.mts. ( 409 Sq.ft. )
2 BHK TYPE 156.39 Sq.mts. ( 607 Sq.ft. )
2 BHK TYPE 256.53 Sq.mts. ( 608 Sq.ft. )
Shop No. 134.29 Sq.mts. ( 369 Sq.ft. )
Shop No. 1026.94 Sq.mts. ( 290 Sq.ft. )
Shop No. 255.96 Sq.mts. ( 602 Sq.ft. )
Shop No. 314.72 Sq.mts. ( 158 Sq.ft. )
Shop No. 425.54 Sq.mts. ( 275 Sq.ft. )
Shop No. 534.24 Sq.mts. ( 369 Sq.ft. )
Shop No. 624.55 Sq.mts. ( 264 Sq.ft. )
Shop No. 736.9 Sq.mts. ( 397 Sq.ft. )
Shop No. 838.54 Sq.mts. ( 415 Sq.ft. )
Shop No. 943.48 Sq.mts. ( 468 Sq.ft. )
1 BHK37.79 Sq.mts. ( 407 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tokyo Bay Phase - 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Water Supply100% completed
95% Complete
Will Be Done Prior To Oc
Water Conservation, Rain water Harvesting100% completed
95% Complete
Will Be Done Prior To Oc
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Will Be Done Prior To Oc
Street Lighting100% completed
95% Complete
Will Be Done Prior To Oc
Storm Water Drains100% completed
95% Complete
Will Be Done Prior To Oc
Solid Waste Management And Disposal100% completed
95% Complete
Will Be Done Prior To Oc
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Will Be Done Prior To Oc
Open Parking
Na
Landscaping & Tree Planting100% completed
95% Complete
Will Be Done Prior To Oc
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Will Be Done Prior To Oc
Energy management100% completed
95% Complete
Solar System Will Be Done Prior To Oc
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Will Be Done Prior To Oc
Community Buildings
Na
Community Building
Na
Aggregate area of recreational Open Space100% completed
95% Complete
Will Be Done Prior To Oc
Buildings / Wings in Tokyo Bay Phase - 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tokyo Bay Phase - 1 by Puranik Tokyo Bay Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

51431 Sq. ft.

Project Area

10776 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

168 apartments in total
Total
168
Booked
166
Available
2

Saleable Area Statistics (Sq. ft.)

86858 Total
Total
86858
Booked
85644
Available
1214
Total 168 apartments in project. 166 apartments booked. 98% apartments booked.
Total 86858 Sq.ft. saleable area. 85644 saleable area booked.
99% area booked.

Wing A - Yuki

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing A - YukiOct 2022171002088
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK TYPE 137.8 Sq.mts. ( 407 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK TYPE 237.97 Sq.mts. ( 409 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK TYPE 156.39 Sq.mts. ( 607 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK TYPE 256.53 Sq.mts. ( 608 Sq.ft. )32
32 Booked100% Booked
100% Booked
Shop No. 134.29 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 1026.94 Sq.mts. ( 290 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 255.96 Sq.mts. ( 602 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 314.72 Sq.mts. ( 158 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 425.54 Sq.mts. ( 275 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 534.24 Sq.mts. ( 369 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 624.55 Sq.mts. ( 264 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 736.9 Sq.mts. ( 397 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 838.54 Sq.mts. ( 415 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop No. 943.48 Sq.mts. ( 468 Sq.ft. )1
1 Booked100% Booked
100% Booked
88 total apartments / 88 apartments booked. 100% apartments booked.
Work Description in Building Wing A - YukiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor

Wing B - Saki

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing B - SakiOct 2022171002074
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK37.79 Sq.mts. ( 407 Sq.ft. )16
16 Booked100% Booked
100% Booked
1 BHK37.97 Sq.mts. ( 409 Sq.ft. )16
16 Booked100% Booked
100% Booked
2 BHK56.39 Sq.mts. ( 607 Sq.ft. )16
14 Booked87% Booked
87% Booked
2 BHK56.53 Sq.mts. ( 608 Sq.ft. )32
32 Booked100% Booked
100% Booked
80 total apartments / 78 apartments booked. 97% apartments booked.
Work Description in Building Wing B - SakiCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Puranik Tokyo Bay Private Limited
for Project
Tokyo Bay Phase - 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation