Project overview

The Trees, Residential Phase 1 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800000165. The Trees, Residential Phase 1 is located at 51/B. This is a Ongoing being developed by Godrej Properties Limited.

The Trees, Residential Phase 1 has 2 BHK, 3 BHKCOMPACT, 4 BHKCOMPACT, 5 BHKCOMPACT & PENTHOUSE Apartments with carpet areas ranging from 1292 to 997 Sq.ft. Carpet. The Project has total 391 of which 22 are currently available for sale.

The Trees, Residential Phase 1 is being developed on a total land area of 151417 Sq.ft. out of which 56977 Sq.ft. i.e 38% is reserved for recreational purposes. The Trees, Residential Phase 1 has 10 Wings / Towers A,B,C,D,E,F,G,H,I,J

ProjectDeveloperLocationPossession
Bhaveshwar Arcade AnnexeBhaveshwar Properties Pvt Ltd4045A-1C, 4045A-1B, 4045A-1A30-11-2018 00:00:00
Damji Shamji Corporate Square - A WingCoronate ConstructionsCts No 5635-B31-05-2019 00:00:00
Neelyog VeydaantaRatan Builders4002A, 4000, 3998P, 4001, 3999P30-03-2023 00:00:00
Natasha RoyaleNatasha Developers Pvt Ltd567430-12-2021 00:00:00
Ashok Odyssey - B WingSanyam Realtors Private Limited128A30-12-2023 00:00:00
Ashok Odyssey - C WingSanyam Realtors Private Limited128A30-12-2023 00:00:00
Neelkanth Enclave D Wing SiddharthaBhaveshwar Properties Pvt Ltd4047 To 405630-06-2024 00:00:00
Alag AranyaAlag Aarchie LlpGhatkopar31-12-2024 00:00:00
Alag ArtisAlag Lifespace LlpGhatkopar East31-12-2024 00:00:00
Sarvodaya HeightsCmg Enterprises2243-A/9, 2243A/7, 2243-A/801-09-2025 00:00:00
Drushti EmeraldSamarth Drushti DevelopersMumbai Suburban31-12-2026 00:00:00
Neelyog RegentRatan Builders3997 Pt 3998 Pt 3990 Pt 3996 Pt31-03-2028 00:00:00
Project Details
  • Project:
    The Trees, Residential Phase 1
  • Location:
  • 51/B
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2022
Developer Details

  • Developer:
    Godrej Properties Limited
  • Phone:
  • Address:
  • Godrej One
Project RERA Details
MAHA REARA No: P51800000165
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Kapadia Associates Design Llp
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2022
Revised Possession 30 Jun 2022
Extended Possession
Litigations No Litigations
Last Modified 21 Mar 2018
Last Retrived 26 Jul 2025
The Trees, Residential Phase 1 QR Code
The Trees, Residential Phase 1
MahaRERA - P51800000165
Apartment Details & Configuration
TypeArea
1 BHK43.6 Sq.mts. ( 469 Sq.ft. )
1 BHK44.12 Sq.mts. ( 475 Sq.ft. )
3 BHKCOMPACT78.07 Sq.mts. ( 840 Sq.ft. )
SHOP18.4 Sq.mts. ( 198 Sq.ft. )
SHOP18.56 Sq.mts. ( 200 Sq.ft. )
SHOP18.76 Sq.mts. ( 202 Sq.ft. )
SHOP20.79 Sq.mts. ( 224 Sq.ft. )
1 BHK43.71 Sq.mts. ( 470 Sq.ft. )
1 BHK44.66 Sq.mts. ( 481 Sq.ft. )
3 BHKCOMPACT77.97 Sq.mts. ( 839 Sq.ft. )
SHOP11.56 Sq.mts. ( 124 Sq.ft. )
SHOP14.4 Sq.mts. ( 155 Sq.ft. )
SHOP15.26 Sq.mts. ( 164 Sq.ft. )
SHOP16.28 Sq.mts. ( 175 Sq.ft. )
SHOP16.68 Sq.mts. ( 180 Sq.ft. )
1 BHK43.07 Sq.mts. ( 464 Sq.ft. )
1 BHK43.57 Sq.mts. ( 469 Sq.ft. )
1 BHK44.67 Sq.mts. ( 481 Sq.ft. )
3 BHKCOMPACT76.92 Sq.mts. ( 828 Sq.ft. )
SHOP17.8 Sq.mts. ( 192 Sq.ft. )
SHOP21.45 Sq.mts. ( 231 Sq.ft. )
SHOP22.93 Sq.mts. ( 247 Sq.ft. )
1 BHK44.03 Sq.mts. ( 474 Sq.ft. )
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )
1 BHK48.27 Sq.mts. ( 520 Sq.ft. )
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )
2 BHKCOMPACT60.68 Sq.mts. ( 653 Sq.ft. )
3 BHKCOMPACT79.66 Sq.mts. ( 857 Sq.ft. )
3 BHKCOMPACT81.98 Sq.mts. ( 882 Sq.ft. )
PENTHOUSE207.26 Sq.mts. ( 2231 Sq.ft. )
PENTHOUSE209.09 Sq.mts. ( 2251 Sq.ft. )
SHOP14.75 Sq.mts. ( 159 Sq.ft. )
SHOP17.3 Sq.mts. ( 186 Sq.ft. )
SHOP18.82 Sq.mts. ( 203 Sq.ft. )
SHOP21.59 Sq.mts. ( 232 Sq.ft. )
2 BHK65.47 Sq.mts. ( 705 Sq.ft. )
2 BHK75.72 Sq.mts. ( 815 Sq.ft. )
3 BHK94.61 Sq.mts. ( 1018 Sq.ft. )
3 BHK97.53 Sq.mts. ( 1050 Sq.ft. )
3 BHKCOMPACT81.31 Sq.mts. ( 875 Sq.ft. )
4 BHKCOMPACTDUPLEX138.02 Sq.mts. ( 1486 Sq.ft. )
PENTHOUSE193.32 Sq.mts. ( 2081 Sq.ft. )
PENTHOUSE202.39 Sq.mts. ( 2179 Sq.ft. )
1 BHK46.5 Sq.mts. ( 501 Sq.ft. )
1 BHK47.82 Sq.mts. ( 515 Sq.ft. )
1 BHK52.07 Sq.mts. ( 560 Sq.ft. )
2 BHK60.98 Sq.mts. ( 656 Sq.ft. )
2 BHK64.31 Sq.mts. ( 692 Sq.ft. )
1 BHK48.84 Sq.mts. ( 526 Sq.ft. )
1 BHK50.92 Sq.mts. ( 548 Sq.ft. )
2 BHK64.96 Sq.mts. ( 699 Sq.ft. )
2 BHK65.95 Sq.mts. ( 710 Sq.ft. )
2 BHK75.79 Sq.mts. ( 816 Sq.ft. )
1 BHK48.45 Sq.mts. ( 522 Sq.ft. )
2 BHK67.18 Sq.mts. ( 723 Sq.ft. )
2 BHK77.5 Sq.mts. ( 834 Sq.ft. )
3 BHK96.52 Sq.mts. ( 1039 Sq.ft. )
3 BHK98.56 Sq.mts. ( 1061 Sq.ft. )
PENTHOUSE199.04 Sq.mts. ( 2142 Sq.ft. )
PENTHOUSE205.97 Sq.mts. ( 2217 Sq.ft. )
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )
3 BHKCOMPACT92.62 Sq.mts. ( 997 Sq.ft. )
4 BHKCOMPACT120 Sq.mts. ( 1292 Sq.ft. )
4 BHKCOMPACT122.17 Sq.mts. ( 1315 Sq.ft. )
5 BHKCOMPACT144.34 Sq.mts. ( 1554 Sq.ft. )
PENTHOUSE208.16 Sq.mts. ( 2241 Sq.ft. )
PENTHOUSE212.81 Sq.mts. ( 2291 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Trees, Residential Phase 1last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space100% completed
95% Complete
Common Rg For All 3 Phases Adm 5293 Sq. Mtrs.
Community Buildings100% completed
95% Complete
Common Clubhouse For All 3 Resi Phs Regst In Ph 2
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
R Stn Common For All 3 Resi Phases
Energy management100% completed
95% Complete
Solar Pv Panels To Take Partial Load Of Common
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Fire Hydrants And Extingushishers At Common Area
Landscaping & Tree Planting100% completed
95% Complete
Childrens Play Area Landscape Area
Open Parking100% completed
95% Complete
124 Open Car Park Provided
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Floor Traps Nahani Traps Ci Pipes &Amp; Rcc Hume Pipe
Solid Waste Management And Disposal100% completed
95% Complete
Solid Waste Converter Common For All Resi Phases
Storm Water Drains100% completed
95% Complete
Rcc Trenches Rcc Hume Pipe
Street Lighting100% completed
95% Complete
Street Lights Along The Common Road
Treatment And Disposal Of Sewage And Sullage Water100% completed
95% Complete
Stp Of 200 Kld Provided For Phase 1
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rainwater Collection Tank Provided In Basement 2
Water Supply100% completed
95% Complete
From Bmc Main Water Supply Line In Gi.
Buildings / Wings in The Trees, Residential Phase 1
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Trees, Residential Phase 1 by Godrej Properties Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

151417 Sq. ft.

Project Area

56977 Sq. ft.

Recreational Open Space

Total 10

Wings / Towers in Project

Apartments Statistics

391 apartments in total
Total
391
Booked
369
Available
22

Saleable Area Statistics (Sq. ft.)

296824 Total
Total
296824
Booked
290862
Available
5962
Total 391 apartments in project. 369 apartments booked. 94% apartments booked.
Total 296824 Sq.ft. saleable area. 290862 saleable area booked.
98% area booked.

A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
AJun 202171210628
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.6 Sq.mts. ( 469 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK44.12 Sq.mts. ( 475 Sq.ft. )20
20 Booked100% Booked
100% Booked
3 BHKCOMPACT78.07 Sq.mts. ( 840 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP18.4 Sq.mts. ( 198 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.56 Sq.mts. ( 200 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.76 Sq.mts. ( 202 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP20.79 Sq.mts. ( 224 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 27 apartments booked. 87% apartments booked.
Work Description in Building ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
BJun 202171210628
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.6 Sq.mts. ( 469 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK43.71 Sq.mts. ( 470 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK44.66 Sq.mts. ( 481 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHKCOMPACT77.97 Sq.mts. ( 839 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.56 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP14.4 Sq.mts. ( 155 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP15.26 Sq.mts. ( 164 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.28 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP16.68 Sq.mts. ( 180 Sq.ft. )1
None Booked0% Booked
0% Booked
32 total apartments / 27 apartments booked. 84% apartments booked.
Work Description in Building BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
CJun 202172210628
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK43.07 Sq.mts. ( 464 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK43.57 Sq.mts. ( 469 Sq.ft. )6
6 Booked100% Booked
100% Booked
1 BHK44.67 Sq.mts. ( 481 Sq.ft. )14
13 Booked92% Booked
92% Booked
3 BHKCOMPACT76.92 Sq.mts. ( 828 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP11.56 Sq.mts. ( 124 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.8 Sq.mts. ( 192 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.45 Sq.mts. ( 231 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP22.93 Sq.mts. ( 247 Sq.ft. )1
None Booked0% Booked
0% Booked
31 total apartments / 26 apartments booked. 83% apartments booked.
Work Description in Building CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

D

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
DJun 202171210626
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK44.03 Sq.mts. ( 474 Sq.ft. )19
17 Booked89% Booked
89% Booked
1 BHK44.61 Sq.mts. ( 480 Sq.ft. )7
6 Booked85% Booked
85% Booked
26 total apartments / 23 apartments booked. 88% apartments booked.
Work Description in Building DCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

E

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
EJun 20211812101983
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK48.27 Sq.mts. ( 520 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK65.4 Sq.mts. ( 704 Sq.ft. )13
13 Booked100% Booked
100% Booked
2 BHKCOMPACT60.68 Sq.mts. ( 653 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHKCOMPACT79.66 Sq.mts. ( 857 Sq.ft. )15
14 Booked93% Booked
93% Booked
3 BHKCOMPACT81.98 Sq.mts. ( 882 Sq.ft. )16
16 Booked100% Booked
100% Booked
PENTHOUSE207.26 Sq.mts. ( 2231 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE209.09 Sq.mts. ( 2251 Sq.ft. )1
1 Booked100% Booked
100% Booked
SHOP14.75 Sq.mts. ( 159 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP17.3 Sq.mts. ( 186 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP18.82 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
SHOP21.59 Sq.mts. ( 232 Sq.ft. )1
None Booked0% Booked
0% Booked
52 total apartments / 47 apartments booked. 90% apartments booked.
Work Description in Building ECompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

F

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
FJun 20211812102087
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK65.47 Sq.mts. ( 705 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK75.72 Sq.mts. ( 815 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK94.61 Sq.mts. ( 1018 Sq.ft. )14
14 Booked100% Booked
100% Booked
3 BHK97.53 Sq.mts. ( 1050 Sq.ft. )16
16 Booked100% Booked
100% Booked
3 BHKCOMPACT81.31 Sq.mts. ( 875 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHKCOMPACTDUPLEX138.02 Sq.mts. ( 1486 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE193.32 Sq.mts. ( 2081 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE202.39 Sq.mts. ( 2179 Sq.ft. )1
1 Booked100% Booked
100% Booked
49 total apartments / 49 apartments booked. 100% apartments booked.
Work Description in Building FCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

G

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
GJun 2021121210835
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK46.5 Sq.mts. ( 501 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK47.82 Sq.mts. ( 515 Sq.ft. )11
11 Booked100% Booked
100% Booked
1 BHK52.07 Sq.mts. ( 560 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK60.98 Sq.mts. ( 656 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK64.31 Sq.mts. ( 692 Sq.ft. )11
11 Booked100% Booked
100% Booked
35 total apartments / 35 apartments booked. 100% apartments booked.
Work Description in Building GCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

H

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
HJun 20211212001047
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK48.84 Sq.mts. ( 526 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK50.92 Sq.mts. ( 548 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK64.96 Sq.mts. ( 699 Sq.ft. )12
12 Booked100% Booked
100% Booked
2 BHK65.95 Sq.mts. ( 710 Sq.ft. )11
11 Booked100% Booked
100% Booked
2 BHK75.79 Sq.mts. ( 816 Sq.ft. )11
11 Booked100% Booked
100% Booked
36 total apartments / 36 apartments booked. 100% apartments booked.
Work Description in Building HCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
IJun 20211812102399
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK48.45 Sq.mts. ( 522 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK67.18 Sq.mts. ( 723 Sq.ft. )14
14 Booked100% Booked
100% Booked
2 BHK77.5 Sq.mts. ( 834 Sq.ft. )1
1 Booked100% Booked
100% Booked
3 BHK96.52 Sq.mts. ( 1039 Sq.ft. )15
15 Booked100% Booked
100% Booked
3 BHK98.56 Sq.mts. ( 1061 Sq.ft. )16
16 Booked100% Booked
100% Booked
PENTHOUSE199.04 Sq.mts. ( 2142 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE205.97 Sq.mts. ( 2217 Sq.ft. )1
1 Booked100% Booked
100% Booked
49 total apartments / 49 apartments booked. 100% apartments booked.
Work Description in Building ICompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
JJun 20211812102090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.07 Sq.mts. ( 711 Sq.ft. )17
17 Booked100% Booked
100% Booked
3 BHKCOMPACT92.62 Sq.mts. ( 997 Sq.ft. )1
1 Booked100% Booked
100% Booked
4 BHKCOMPACT120 Sq.mts. ( 1292 Sq.ft. )15
15 Booked100% Booked
100% Booked
4 BHKCOMPACT122.17 Sq.mts. ( 1315 Sq.ft. )14
14 Booked100% Booked
100% Booked
5 BHKCOMPACT144.34 Sq.mts. ( 1554 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE208.16 Sq.mts. ( 2241 Sq.ft. )1
1 Booked100% Booked
100% Booked
PENTHOUSE212.81 Sq.mts. ( 2291 Sq.ft. )1
1 Booked100% Booked
100% Booked
50 total apartments / 50 apartments booked. 100% apartments booked.
Work Description in Building JCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Godrej Properties Limited
for Project
The Trees, Residential Phase 1
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation