Project overview

The South Bay is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900002722. The South Bay is located at 465. This is a Ongoing being developed by Mesacon Triumph Developers.

The South Bay has GRANDE APARTMENT, PRESIDENTIAL SUITE & ROYAL SUITE Apartments with carpet areas ranging from 1548 to 2537 Sq.ft. Carpet. The Project has total 4 of which 3 are currently available for sale.

The South Bay is being developed on a total land area of 6345 Sq.ft. The South Bay has 1 Wings / Towers The South Bay

ProjectDeveloperLocationPossession
Project Details
  • Project:
    The South Bay
  • Location:
  • 465
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Mesacon Triumph Developers
  • Phone:
  • Address:
  • Yogesh Bhavan
Project RERA Details
MAHA REARA No: P51900002722
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Anil Ramakant Patil
Funding Bank HDFC BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession 30 Oct 2020
Litigations No Litigations
Last Modified 16 Jun 2020
Last Retrived 26 Jul 2025
The South Bay QR Code
The South Bay
MahaRERA - P51900002722
Apartment Details & Configuration
TypeArea
GRANDE APARTMENT143.84 Sq.mts. ( 1548 Sq.ft. )
PRESIDENTIAL SUITE235.73 Sq.mts. ( 2537 Sq.ft. )
ROYAL SUITE225.67 Sq.mts. ( 2429 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The South Baylast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Na
Energy management
Na
Entrance Lobby100% completed
95% Complete
Completed
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Completed
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Completed
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
Completed
Water Supply100% completed
95% Complete
Completed
Buildings / Wings in The South Bay
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The South Bay by Mesacon Triumph Developerslast updated on 26 Jul 2025 as per information obtained from MARA RERA.

6345 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

4 apartments in total
Total
4
Booked
1
Available
3

Saleable Area Statistics (Sq. ft.)

8063 Total
Total
8063
Booked
1548
Available
6515
Total 4 apartments in project. 1 apartments booked. 25% apartments booked.
Total 8063 Sq.ft. saleable area. 1548 saleable area booked.
19% area booked.

The South Bay

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The South BayDec 2019171010035
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
GRANDE APARTMENT143.84 Sq.mts. ( 1548 Sq.ft. )2
1 Booked50% Booked
50% Booked
PRESIDENTIAL SUITE235.73 Sq.mts. ( 2537 Sq.ft. )1
None Booked0% Booked
0% Booked
ROYAL SUITE225.67 Sq.mts. ( 2429 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 1 apartments booked. 25% apartments booked.
Work Description in Building The South BayCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mesacon Triumph Developers
for Project
The South Bay
last updated on 26 Jul 2025 as per information obtained from MARA RERA.