Project overview

The Sanctuary - Tower 4 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800025926. The Sanctuary - Tower 4 is located at 544 And 544/1. This is a New being developed by Runwal Construction Private Limited.

The Sanctuary - Tower 4 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 643 to 981 Sq.ft. Carpet. The Project has total 264 of which 35 are currently available for sale.

The Sanctuary - Tower 4 is being developed on a total land area of 7983 Sq.ft. out of which 87775 Sq.ft. i.e 1100% is reserved for recreational purposes. The Sanctuary - Tower 4 has 1 Wings / Towers Tower 4

ProjectDeveloperLocationPossession
Project Details
  • Project:
    The Sanctuary - Tower 4
  • Location:
  • 544 And 544/1
  • Const. Stage:
    New
  • Possession:
    30 Jun 2026
Developer Details

  • Developer:
    Runwal Construction Private Limited
  • Phone:
  • Address:
  • Runwal And Omkar Esquare
Project RERA Details
MAHA REARA No: P51800025926
Project Type Residential / Group Housing
RERA Project Status New
Architect Ninad
Funding Bank HDFC BANK
Proposed Possession 30 Jun 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 29 Sep 2023
Last Retrived 26 Jul 2025
The Sanctuary - Tower 4 QR Code
The Sanctuary - Tower 4
MahaRERA - P51800025926
Apartment Details & Configuration
TypeArea
2 BHK59.75 Sq.mts. ( 643 Sq.ft. )
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Sanctuary - Tower 4last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
8154.50 Sq.Mt
Community Buildings
Wip
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting5% completed
5% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains15% completed
15% Complete
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting10% completed
10% Complete
Wip
Water Supply25% completed
25% Complete
Waterline
Buildings / Wings in The Sanctuary - Tower 4
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Sanctuary - Tower 4 by Runwal Construction Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

7983 Sq. ft.

Project Area

87775 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

264 apartments in total
Total
264
Booked
229
Available
35

Saleable Area Statistics (Sq. ft.)

200886 Total
Total
200886
Booked
171616
Available
29270
Total 264 apartments in project. 229 apartments booked. 86% apartments booked.
Total 200886 Sq.ft. saleable area. 171616 saleable area booked.
85% area booked.

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Dec 20254811120374
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK59.75 Sq.mts. ( 643 Sq.ft. )172
157 Booked91% Booked
91% Booked
3 BHK91.15 Sq.mts. ( 981 Sq.ft. )92
72 Booked78% Booked
78% Booked
264 total apartments / 229 apartments booked. 86% apartments booked.
Work Description in Building Tower 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress64% done
64% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress64% done
64% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress83% done
83% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress61% done
61% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress61% done
61% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress83% done
83% Booked
Channel Partners
Channel Partners Registered by Developer
Runwal Construction Private Limited
for Project
The Sanctuary - Tower 4
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation