Project overview
The Sanctuary - Tower 2 is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800032538. The Sanctuary - Tower 2 is located at 544 And 544/1. This is a New being developed by Runwal Construction Private Limited.
The Sanctuary - Tower 2 has 2 BHK & 3 BHK Apartments with carpet areas ranging from 666 to 771 Sq.ft. Carpet. The Project has total 264 of which 144 are currently available for sale.
The Sanctuary - Tower 2 is being developed on a total land area of 7526 Sq.ft. out of which 87775 Sq.ft. i.e 1166% is reserved for recreational purposes. The Sanctuary - Tower 2 has 1 Wings / Towers Tower 2
| Project | Developer | Location | Possession |
-
Project:
The Sanctuary - Tower 2
-
Location:
-
544 And 544/1
-
Const. Stage:
New
-
Possession:
31 Mar 2027
| MAHA REARA No: |
P51800032538 |
| Project Type |
Residential / Group Housing |
| RERA Project Status |
New |
| Architect |
Ninad |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
31 Mar 2027 |
| Revised Possession |
|
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
29 Sep 2023 |
| Last Retrived |
26 Jul 2025 |
The Sanctuary - Tower 2 QR Code
The Sanctuary - Tower 2
MahaRERA - P51800032538
| Type | Area |
| 2 BHK | 61.83 Sq.mts. ( 666 Sq.ft. ) |
| 2 BHK | 62.72 Sq.mts. ( 675 Sq.ft. ) |
| 3 BHK | 71.65 Sq.mts. ( 771 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of The Sanctuary - Tower 2last updated on 26 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
8154.50 Sq.Mtr. |
|
|
|
Yet To Start |
Electrical Meter Room, Sub-Station, Receiving Station20% completed
|
|
Yet To Start |
|
|
|
Yet To Start |
Fire Protection And Fire Safety
Requirements
|
|
Yet To Start |
Landscaping & Tree Planting5% completed
|
|
Yet To Start |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
|
|
Wip |
Solid Waste Management And Disposal
|
|
Yet To Start |
Storm Water Drains15% completed
|
|
Wip |
|
|
|
Yet To Start |
Treatment And Disposal Of Sewage And Sullage Water
|
|
Yet To Start |
Water Conservation, Rain water Harvesting10% completed
|
|
Wip |
Water Supply25% completed
|
|
Waterline |
Buildings / Wings in The Sanctuary - Tower 2
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Sanctuary - Tower 2 by Runwal Construction Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
264
apartments in total
Saleable Area Statistics (Sq. ft.)
186193
Total
Total 264 apartments in project. 120 apartments booked. 45% apartments booked.
Total 186193 Sq.ft. saleable area. 83265 saleable area booked.
45% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Tower 2 | Mar 2027 | 48 | 1 | 1 | 1 | 2 | 0 | 277 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 2 BHK | 61.83 Sq.mts. ( 666 Sq.ft. ) | 92 | |
| 2 BHK | 62.72 Sq.mts. ( 675 Sq.ft. ) | 80 | |
| 3 BHK | 71.65 Sq.mts. ( 771 Sq.ft. ) | 92 | |
264 total apartments / 120 apartments booked. 45% apartments booked. |
| Work Description in Building Tower 2 | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Runwal Construction Private Limited
for Project
The Sanctuary - Tower 2
last updated on
26 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |