Project overview

The Sanctuary is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800012621. The Sanctuary is located at 544/1, C.T.S. No 544. This is a Ongoing being developed by Runwal Construction Private Limited.

The Sanctuary has 2 BHK, 3 BHK & 4 BHK Apartments with carpet areas ranging from 1426 to 938 Sq.ft. Carpet. The Project has total 1005 of which 838 are currently available for sale.

The Sanctuary is being developed on a total land area of 262708 Sq.ft. out of which 87775 Sq.ft. i.e 33% is reserved for recreational purposes. The Sanctuary has 5 Wings / Towers Tower 1,Tower 2,Tower 3,Tower 4,Tower 5

ProjectDeveloperLocationPossession
Project Details
  • Project:
    The Sanctuary
  • Location:
  • 544/1, C.T.S. No 544
  • Const. Stage:
    Ongoing
  • Possession:
    31 Jul 2028
Developer Details

  • Developer:
    Runwal Construction Private Limited
  • Phone:
  • Address:
  • Runwal And Omkar Esquare
Project RERA Details
MAHA REARA No: P51800012621
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ninad
Funding Bank HDFC BANK
Proposed Possession 31 Jul 2028
Revised Possession 31 Jul 2028
Extended Possession
Litigations No Litigations
Last Modified 29 Sep 2023
Last Retrived 13 Feb 2026
The Sanctuary QR Code
The Sanctuary
MahaRERA - P51800012621
Apartment Details & Configuration
TypeArea
1RK30.9 Sq.mts. ( 333 Sq.ft. )
2 BHK71.31 Sq.mts. ( 768 Sq.ft. )
3 BHK77.11 Sq.mts. ( 830 Sq.ft. )
3 BHK77.91 Sq.mts. ( 839 Sq.ft. )
3 BHK98.25 Sq.mts. ( 1058 Sq.ft. )
2 BHK64.57 Sq.mts. ( 695 Sq.ft. )
2 BHK84.89 Sq.mts. ( 914 Sq.ft. )
2 BHK55.32 Sq.mts. ( 595 Sq.ft. )
2 BHK56.09 Sq.mts. ( 604 Sq.ft. )
2.5 BHK72.1 Sq.mts. ( 776 Sq.ft. )
3 BHK86.4 Sq.mts. ( 930 Sq.ft. )
3 BHK87.1 Sq.mts. ( 938 Sq.ft. )
4 BHK132.51 Sq.mts. ( 1426 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Sanctuarylast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
8154.50 Sq.Mt
Community Buildings
Wip
Electrical Meter Room, Sub-Station, Receiving Station20% completed
20% Complete
Wip
Energy management
Wip
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting5% completed
5% Complete
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Wip
Solid Waste Management And Disposal
Wip
Storm Water Drains15% completed
15% Complete
Wip
Street Lighting
Wip
Treatment And Disposal Of Sewage And Sullage Water
Stp
Water Conservation, Rain water Harvesting10% completed
10% Complete
Wip
Water Supply25% completed
25% Complete
Water Line
Buildings / Wings in The Sanctuary
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Sanctuary by Runwal Construction Private Limitedlast updated on 13 Feb 2026 as per information obtained from MARA RERA.

262708 Sq. ft.

Project Area

87775 Sq. ft.

Recreational Open Space

Total 5

Wings / Towers in Project

Apartments Statistics

1005 apartments in total
Total
1005
Booked
167
Available
838

Saleable Area Statistics (Sq. ft.)

784771 Total
Total
784771
Booked
139306
Available
645465
Total 1005 apartments in project. 167 apartments booked. 16% apartments booked.
Total 784771 Sq.ft. saleable area. 139306 saleable area booked.
18% area booked.

Tower 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 1Jan 2028251311090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK30.9 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK71.31 Sq.mts. ( 768 Sq.ft. )24
20 Booked83% Booked
83% Booked
3 BHK77.11 Sq.mts. ( 830 Sq.ft. )24
19 Booked79% Booked
79% Booked
3 BHK77.91 Sq.mts. ( 839 Sq.ft. )24
21 Booked87% Booked
87% Booked
3 BHK98.25 Sq.mts. ( 1058 Sq.ft. )21
14 Booked66% Booked
66% Booked
94 total apartments / 74 apartments booked. 78% apartments booked.
Work Description in Building Tower 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 2Jan 1900231311050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK64.57 Sq.mts. ( 695 Sq.ft. )84
33 Booked39% Booked
39% Booked
2 BHK84.89 Sq.mts. ( 914 Sq.ft. )1
None Booked0% Booked
0% Booked
85 total apartments / 33 apartments booked. 38% apartments booked.
Work Description in Building Tower 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress69% done
69% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress89% done
89% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress65% done
65% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress68% done
68% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked

Tower 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 3Jan 2028251311090
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK30.9 Sq.mts. ( 333 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK71.31 Sq.mts. ( 768 Sq.ft. )24
19 Booked79% Booked
79% Booked
3 BHK77.11 Sq.mts. ( 830 Sq.ft. )24
9 Booked37% Booked
37% Booked
3 BHK77.91 Sq.mts. ( 839 Sq.ft. )24
14 Booked58% Booked
58% Booked
3 BHK98.25 Sq.mts. ( 1058 Sq.ft. )21
18 Booked85% Booked
85% Booked
94 total apartments / 60 apartments booked. 63% apartments booked.
Work Description in Building Tower 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 4Jan 19007313110500
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.32 Sq.mts. ( 595 Sq.ft. )129
None Booked0% Booked
0% Booked
2 BHK56.09 Sq.mts. ( 604 Sq.ft. )129
None Booked0% Booked
0% Booked
2.5 BHK72.1 Sq.mts. ( 776 Sq.ft. )138
None Booked0% Booked
0% Booked
396 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress55% done
55% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress55% done
55% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress71% done
71% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress97% done
97% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
work-in-progress74% done
74% Booked

Tower 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower 5Jan 19007313110670
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK55.32 Sq.mts. ( 595 Sq.ft. )69
None Booked0% Booked
0% Booked
2 BHK56.09 Sq.mts. ( 604 Sq.ft. )69
None Booked0% Booked
0% Booked
3 BHK86.4 Sq.mts. ( 930 Sq.ft. )60
None Booked0% Booked
0% Booked
3 BHK87.1 Sq.mts. ( 938 Sq.ft. )69
None Booked0% Booked
0% Booked
4 BHK132.51 Sq.mts. ( 1426 Sq.ft. )69
None Booked0% Booked
0% Booked
336 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Tower 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress30% done
30% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress90% done
90% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress85% done
85% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Completed 100% done
100% Booked
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress85% done
85% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress25% done
25% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
Completed 100% done
100% Booked
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Runwal Construction Private Limited
for Project
The Sanctuary
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation