Project overview

The Palazzo is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800015924. The Palazzo is located at 366Ksxy66dz2vb4x9wrw6c2dpr8apru3p1efkghu1nwpbggxkjf+Pdcqjvbrm+7Nmcljf4tsoeeybgeryyodfq==. This is a New being developed by I.S.Builders.

The Palazzo has 1 BHK & 2 BHK Apartments with carpet areas ranging from 419 to 588 Sq.ft. Carpet. The Project has total 72 of which 16 are currently available for sale.

The Palazzo is being developed on a total land area of 18243 Sq.ft. out of which 1247 Sq.ft. i.e 7% is reserved for recreational purposes. The Palazzo has 1 Wings / Towers The Palazzo Wings A And B

ProjectDeveloperLocationPossession
Redevelopment Of Om Yogeshwar Chs LtdVama LifestylesGiqoksbbpy9fqkthuzvif0dvsjaddrvldpwuqvacrbe9rv+Rg2sn/Yqampiqlow9rtrbd3vlsm45wm8ps6m0t+Jurcaccwu5sr7ouf4fijd70ghb0wl+0Q+7Cojz2dgn01-10-2023 00:00:00
The Sanctuary - Tower 2Runwal Construction Private Limited1Kk8relbwnngw4rlgjbd0a==31-03-2027 00:00:00
SpringwoodsPratik ConstructionTxiuoewle7dufzqdnji+Bvtfggllddjupnb7lcnszhu=01-03-2025 00:00:00
EkveeraNexzone Buildcon LlpN3xjk4lhnsza3w9v+Zyrxjkc6bctzvtg6epyvdmq+C0=31-12-2023 00:00:00
Garden Court AvenueMishal LifespacellpE8dh5ipyn6vz+8Vbtnjmvdl6hrozzdfhncmyyqkgs/Rl4utsv72c9vlyr2xk4qnsbshbfbh/F49w2ixsflj8aq==31-03-2024 00:00:00
The SolarisSosar EnterprisesH9j5vbpu9bnp0qzyltwd3a==31-12-2026 00:00:00
Unique Enclave ResidencyFazal ShaikhDb8mjz4o8u947oemdim6bg==30-09-2026 00:00:00
Om Shankar BhavanRebrickers Private Limited9Qeyk2zjr5t74l2u3wlb6g==31-10-2025 00:00:00
Ina Apartment Co-Operative Housing Society LimitedYash RealtorsQ6v5aodx7mdlxviwb45btw==31-12-2026 00:00:00
Modispaces Valley ViewModispaces Real Estate Pvt LtdWnrou5z+Sn9sbfuvf7gxyyuyo13bvmjnwnave90zsee=30-06-2024 00:00:00
AURIS ILARIA TOWER BTRANSCON-SHETH CREATORS PRIVATE LIMITEDMalad West30-04-2028 00:00:00
Redevelopment Of Kesar Niketan ChslPranav Constructions LimitedGkrjzojr31swfhol0p8cva==03-01-2026 00:00:00
Tillibai Apartment Co-Op. Hsg. Soc. Ltd.Tillibai Chs. Ltd.Tymvgzahoccc2wlltglwia==31-12-2026 00:00:00
IRENE WING B PHASE 1Sheth Creators and Sunvision Private LimitedMumbai Suburban31-10-2028 00:00:00
MirabilisSkylink Hospitality LlpYczlgoebgff+Llx7vqrrwggkezkgl2/Xnoiqsmmu5gbxz5aapmulp57+Fvu3oqzrz+1Hklv8woa8nq0tbptl3uz69zoqypntd0hu/Eqqwff9xzaufvcjawess51aqsz5eqty50crlz63etrow3wnza==30-06-2021 00:00:00
Sainath MadhubanSainath Land Developers Pvt. Ltd.4A0c/Lbsnzg20gc8dpfcda==31-12-2018 00:00:00
GiriniwasReliance EnetrpriseKannamwar Nagar Road31-12-2019 00:00:00
Arkk AvenueArkk Builders And DevelopersIqx7ni+Aycatgbyswz+Vh/Tsfh4sjf70kwnqb5/Oisrgtoiasotkq1oor+Ip4mamln8dtcrv4v4nqt9xf4gx3fsrwcpxo4csitkd9ksdbey=31-12-2019 00:00:00
New Laxmi Bhavan Wing ASantacruz Laxminarayan TempleRha6gaxjplgdqyfm8k/R2q==31-08-2023 00:00:00
Apex Green WoodApex InfratecDzbxmbrwsiyage8ubiy2xmojdao4syqz6rehmrn9yq5c+Qj6rdxa+0Ltmlxh3u0i30-06-2026 00:00:00
Kaveri TowerGnanesh Virendra LakhiaS/Sikz15o0djqco9qpx6awsluaypd32iplati6tn7hke9h473zya31h46a50+Ja+31-12-2025 00:00:00
Royal ResidencyLakhani Infra Projects LlpZw6qzrpnlew90uu2gqvlrw==31-12-2026 00:00:00
Sarwarji HeightsStans Buildtech ShelconMwsgpcip/4Wvqjggn0zyuq==31-12-2026 00:00:00
Kanchan Sheila ChsYug DevelopersCvvjsrjeonjoddst0mze+5Hu5wwhiwer8gscydlphtvaki39m2ahs5qskshp4ymz31-03-2024 00:00:00
Sarvodaya PrideJyotiraditya Realtors And Developers LlpOwnomikwrkzusi3pn/Cwca+L4q1m6a5cozcjh4eoohs=30-09-2024 00:00:00
Supreme EvanaSupreme Mega Constructions LlpHgrczoe2eg+I80cwlnvavw==30-06-2024 00:00:00
Vrindavan EliteMatrix ConstructionsWusmq1z4umopxwunlu6b+A==08-10-2026 00:00:00
The crownElite AssociatesTilak Nagar Railway Station28-04-2026 00:00:00
Horizon ShlokaHorizon Promoters India Ltd0Cdacl0/Yojhli92/Qwu/G==20-05-2023 00:00:00
Arbuda Darshan Chs Ltd.Supreme RealtorsQohl6sub0luiftheaddsea==31-12-2023 00:00:00
Redevelopment Of Vasishtha Krupa Co-Operative Housing Society Ltd.Kaustubh Construction Private LimitedJ1xmpmidoarhngfnhzf7cw==31-08-2024 00:00:00
Vighneshwar Cooperative Housing Society LimitedVighneshwar Coop Housing Society LimitedRmxhgu4gagpl+Gl5r0uf0eib07uljz0hbh6n75b1q+Q/Dqijhbiu0ll+P4g5u5p3zdmtueimp1ajvvg18t4tsrvkfjxwlunq3neakajyjtnt0wugvs4hk0zilvoxgwhj22-01-2021 00:00:00
Mount BlissRanjana Builders And DevelopersY8jxnqnpkry8heudylmzkq==30-12-2021 00:00:00
Durga GayatriManoj Mohanlal GoradiaMumflmqs/Unlyvvexvxdpw==30-11-2025 00:00:00
Get Together Co Operative Housing Society LimitedGet Together Co Operative Housing Society LimitedWzlhemrd2owtnu0pwxorkw==31-07-2025 00:00:00
GangasadanNavpadh Realty LlpCstoqebf/Fuls4rp8i1/Qg==31-03-2025 00:00:00
Transcon Triumph Tower 3Transcon Triumph Phase 2 Private LimitedFht16reek9h7avdlpkj1fyjsznikvyjxsl8bitugnoq=30-09-2026 00:00:00
Raghav AmaraRaghav Raj Builders & Developers LlpRmvfa+0Gicl/Q5upepwnuw==31-07-2023 00:00:00
UtkarshAmbrosial Developers Private LimitedGsmyn+Zjm6awrhwp3guylw==31-03-2025 00:00:00
Vikas 11Vikas Lifespace LlpNbuswxgcsaq0ex5xfzmr/Q==30-06-2027 00:00:00
Hetali SagarJayesh Himatlal PandyaIektknq+Ro+Bcoajgqrbzg==31-12-2026 00:00:00
Redevelopment Of Malad Ajanta ChsNareshbhai Vallabhbhai PatelYsq8dyn9zz6rdfrr6fx4fw==31-12-2026 00:00:00
ShivsagarGurukrupa DevelopersV7+Zpeak+Kznp2x1msmpfa==31-03-2026 00:00:00
AnnavistaTrisons BuildersWup7gynqfofx/Fo+Rbinow==31-12-2024 00:00:00
EpitomeThoroughbred Realty LlpJe20unperpi/Soafdg4kza==31-12-2025 00:00:00
Sai SymphonySainath Realtors9Lozumgjv5r+Gfro8p6c6w==31-12-2018 00:00:00
Axiom IniziaAxiom Real Estate Developers Pvt Ltd65Mg7+Cdi60ltuhl3b7xla==30-09-2018 00:00:00
Redevelopment Of Marhaba Co-Operative Housing Society LimitedShree Mahavir EstatesPcccef9rw/Ifbajrbmrhxusjl1g+Mzrz4ibnnoehvp4/Gj8wrknb37waeff5pptb31-10-2018 00:00:00
Codename Rare By RunwalRunwal Developers LtdTpwgzrvd5slzxpo4uodedq==30-06-2026 00:00:00
Neel KamalRajnikant SanchalaEo30cnqrcr7ryd+Tnyjdfa==31-12-2028 00:00:00
TejkiranTej Kiran Co Op Hsg Soc LtdZh0ynd7aoxfmsqtokn1huw==01-04-2024 00:00:00
Mdm MaestroMdm Realty LlpY4jpy+4Yy7nrcxhflxp2ma==31-12-2024 00:00:00
Rustomjee AdenKeysky Realtors Pvt LtdM0gneciz0/Mgws42h4nmf1iowgjgcw1f1xz7kutc4zm=31-12-2026 00:00:00
SIDDHARTH NAGAR GOODWILL CHSLVIRENDRA HIRALAL DOSHI348 (Pt)31-12-2025 00:00:00
New PushparajYash Infomedia & Estate Private LimitedEebifhawlqiqvv1z0cl497l0qgjcrkiqf1a4bhypglc=30-09-2019 00:00:00
Redevelopment Of New Monalisa ChslShree Mahavir EstatesXfr+Nmfcnycy24fs+Y3q/3Etsektbtbygjl6l5jabxa2ybvzy7w+Duc5foqdi7kd30-12-2020 00:00:00
Velentine Apartment 1 Wing D Velentine Properties Private LimitedSkm74gqoqeyaghswi7tyumqu7hw0crgdubawdcgjtuu=31-07-2023 00:00:00
Kamla Jainson Phase 1 Part Podium From 2Nd To 4Th Floor And 5Th To 25Th Habitable FloorsM/S. Kamla Homes & Infrastructure0Bhniotsiyffsjaq7dyvvyz8yvjoroohocytaix+Rkdpyerpnrxdjyponfhsyh/E30-12-2022 00:00:00
The PalazzoI.S.Builders366Ksxy66dz2vb4x9wrw6c2dpr8apru3p1efkghu1nwpbggxkjf+Pdcqjvbrm+7Nmcljf4tsoeeybgeryyodfq==30-12-2022 00:00:00
Redevelopment Of Tiara ChslPranav Constructions LimitedYqaxpmirnh2v+Fr+Gpqgvw==04-10-2024 00:00:00
Audumbar Apartments Chs LtdMasakin DevelopersTdo4xm3ovatm68n4827c7/K0lzaqakwnwxfljdl3ozm=31-12-2024 00:00:00
104 EastQuba Infra LlpHd1dib6ew+/Wdd+Du9jsba==31-12-2024 00:00:00
Hari Kunj Iii Wing AKukreja Construction CoMumbai Suburban31-08-2029 00:00:00
Laxmi Shrushti - Wing BLaxmidevi DevelopersBctikkn7sipn9tvgki0ooq==31-08-2025 00:00:00
Rajlaxmi ResidencyRaj CorporationBaka18/Tdndo0dr+Qzkqxuojzm8iar2ole426bj2cn8=31-12-2025 00:00:00
Star Chs LtdHealth Colonies & Construction Pvt.Ltd.8Zn9eblvt8/Qofmmfrhwfkflwxbe1y/Pjj9fvlmedyucw9zmqjoropuxrdwznjic5w51yiutd3v+9+Pqxsol8a==31-12-2024 00:00:00
Avyukta NeelkamalShivoham AssociatesQ1uhkeuqvxtfs3us8qsbjq==01-09-2026 00:00:00
Karwari Co-Op Hsg Society Redevelopment Crystal TowerMk Construction40010207-09-2012 00:00:00
Yash Willows / Usha NiketanYash RealtorsTfls9zh3ewztolzgxmge4a==31-12-2018 00:00:00
Fressia RanibelloLucent Infra Projects Pvt. Ltd.H7l/Eaol7ptaoci+Ixem7w==30-06-2018 00:00:00
ArkanGajaanan Property Developers Private LimitedIk2uid2eknzpb71axusbna==31-12-2025 00:00:00
D SOLITAIREKRISHNAN AND KAMAL ASSOCIATESMumbai Suburban01-03-2023 00:00:00
Ram Rameshwar Darshan ChslFerro BuildCaoql5+Lvlp538ya/Upk1w==30-06-2024 00:00:00
Siddharth Nagar Paradise Chs LtdInfinity ConstructionsYp7/+Xkae9kcpshetq6zpq==31-12-2026 00:00:00
Ajmera EdenShree Yogi Realcon Private Limited5Iqssdaxt0zfw5jspnmtpwz8eutlpme8+R3a6wxy7pe=30-01-2027 00:00:00
Sher E Punjab 02 Guru SharanIcon Ace DevelopersBnjl3jchpwqxnlc7mxnkfw==31-03-2026 00:00:00
Raghav MarvelRaghav Raj Builders & Developers LlpZ50sfylydxrq4ntvknujdq==31-08-2024 00:00:00
Shraddha EliteShraddha Developers & RealtorsVafz6zcalwxgctiagshikaviafxjlg1k55akvf5jnus5tfylornvj7qs8cxr2y/V31-12-2025 00:00:00
Charkop Siddhiyog Co Operative Housing Society LimitedCharkop Siddhiyog Co-Op Hsg LimitedMfnd32olwcsxe3vplcfa4w==31-12-2025 00:00:00
PANCHAM PINNACLEPANCHAM BUILDCON PRIVATE LIMITEDGhatkopar East31-12-2026 00:00:00
Senroofs Phase - IiiPioneer HousingGm3ixosybakuhjfol9cis643pq5jhaeng62krlxgmpa=31-12-2027 00:00:00
DevbhoomiMetro CapitalYxkdmepbbbbjpzmbemg3lw==31-12-2026 00:00:00
Raghav ParijatRaghav Realty Developers0Yu2wiufax/Om3xnzkjjqq==30-12-2025 00:00:00
Saraswati SquareMetro InfrastructureGuy9d6bbo3ikvuogy5xeljv2m/P14jjilsmjyphpjzwwxs2mow0xho//Koqq7rvu31-12-2027 00:00:00
Unique PrideFazal ShaikhVikhroli East Mumbai31-12-2025 00:00:00
Kailas AshishDnk Developers Ka LlpP2xoqxfveg9env+Ig2swrq==16-08-2025 00:00:00
Shraddha PearlShraddha Landmark Private LimitedHziodlpdopy4q0yznooowq==31-12-2025 00:00:00
Shraddha ProminentShraddha Landmark Private LimitedDb8mjz4o8u947oemdim6bg==31-12-2025 00:00:00
Shraddha PanacheShraddha Landmark Private LimitedV8fj7ryifwpbeeaag8kdkq==31-12-2025 00:00:00
Ashok Aura - Rj CommercialSanyam Realtors Private Limited+K2irapspbx1bdvtp22a7pkrryrmuit7srtq/A67ulm=31-12-2025 00:00:00
Simba TowerSimba Enterprises Llp0Eff89tjj/Motyvjwpd/C+H2n1gikfhyri1gt++Nej4=31-12-2017 00:00:00
Shubh AashishA B Builder & Developers Pvt LtdZij3o+L1wkmb/Vaozfoavbv1knqmkakiwyhsr+Hhrdo=31-12-2018 00:00:00
Pratap GauravJpv Pearl LlpU2xwmea53bieal9uplpclq==31-03-2025 00:00:00
Redevelopment Of Pearl PalacePranav Constructions LimitedSoph4zbecghl42nxdq2oqg==14-09-2027 00:00:00
Ghatkopar Shilpakala Chs LimitedM/S Sun-VubZdpay0nvwzor3baghzjvpcu+Qonsboo6smxxrudwvco=30-12-2022 00:00:00
Abundanttiafull - By BholasSandeep Dalchand JainOmsz4cwvsxzn46g3ls2lxw==30-06-2026 00:00:00
Rose Blossom ChslVini Developers00Y6iaqixwo3ygotzwygqdvumz63aur7kn72yd2k6bu=01-08-2026 00:00:00
Royce ResidencesMaxrich Infra Private Limited 30-06-2030 00:00:00
Ambe KrupaGuddi EnterprisesUkxplb5rdhovuuc479cura==30-06-2019 00:00:00
Project Details
  • Project:
    The Palazzo
  • Location:
  • 366Ksxy66dz2vb4x9wrw6c2dpr8apru3p1efkghu1nwpbggxkjf+Pdcqjvbrm+7Nmcljf4tsoeeybgeryyodfq==
  • Const. Stage:
    New
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    I.S.Builders
  • Phone:
  • Address:
  • Vinay Bhavya Complex
Project RERA Details
MAHA REARA No: P51800015924
Project Type Residential / Group Housing
RERA Project Status New
Architect Subhash Karmarkar
Funding Bank HDFC BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 18 Jan 2024
Last Retrived 13 Feb 2026
The Palazzo QR Code
The Palazzo
MahaRERA - P51800015924
Apartment Details & Configuration
TypeArea
1 BHK38.93 Sq.mts. ( 419 Sq.ft. )
1 BHK45.43 Sq.mts. ( 489 Sq.ft. )
1 BHK46.64 Sq.mts. ( 502 Sq.ft. )
2 BHK48.12 Sq.mts. ( 518 Sq.ft. )
2 BHK50.26 Sq.mts. ( 541 Sq.ft. )
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Palazzolast updated on 13 Feb 2026 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
As Per Mcgm
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
As Per Mcgm
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
As Per Mcgm
Landscaping & Tree Planting100% completed
95% Complete
As Per Mcgm
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
As Per Mcgm
Solid Waste Management And Disposal
Na
Storm Water Drains100% completed
95% Complete
As Per Mcgm
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting100% completed
95% Complete
As Per Mcgm
Water Supply
As Per Mcgm
Buildings / Wings in The Palazzo
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Palazzo by I.S.Builderslast updated on 13 Feb 2026 as per information obtained from MARA RERA.

18243 Sq. ft.

Project Area

1247 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

72 apartments in total
Total
72
Booked
56
Available
16

Saleable Area Statistics (Sq. ft.)

34664 Total
Total
34664
Booked
26694
Available
7970
Total 72 apartments in project. 56 apartments booked. 77% apartments booked.
Total 34664 Sq.ft. saleable area. 26694 saleable area booked.
77% area booked.

The Palazzo Wings A And B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The Palazzo Wings A And BDec 2021151110028
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.93 Sq.mts. ( 419 Sq.ft. )28
24 Booked85% Booked
85% Booked
1 BHK45.43 Sq.mts. ( 489 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK46.64 Sq.mts. ( 502 Sq.ft. )14
12 Booked85% Booked
85% Booked
2 BHK48.12 Sq.mts. ( 518 Sq.ft. )14
9 Booked64% Booked
64% Booked
2 BHK50.26 Sq.mts. ( 541 Sq.ft. )14
11 Booked78% Booked
78% Booked
2 BHK54.63 Sq.mts. ( 588 Sq.ft. )1
None Booked0% Booked
0% Booked
72 total apartments / 56 apartments booked. 77% apartments booked.
Work Description in Building The Palazzo Wings A And BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
I.S.Builders
for Project
The Palazzo
last updated on 13 Feb 2026 as per information obtained from MARA RERA.
Name Company Location Mobile Designation