Project overview
The Mist -Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000007101. The Mist -Phase I is located at Land Bearing Sno 41 H No 0 Village Dahivali S No 97 H No 0 Village Akurle Taluka Karjat Dist Raigad. This is a Ongoing being developed by Geecee Ventures Limited.
The Mist -Phase I has 1 BHK & Shop Apartments with carpet areas ranging from 129 to 334 Sq.ft. Carpet. The Project has total 138 of which 25 are currently available for sale.
The Mist -Phase I is being developed on a total land area of 27642 Sq.ft. out of which 10172 Sq.ft. i.e 37% is reserved for recreational purposes. The Mist -Phase I has 4 Wings / Towers Building 1 - B Wing,Building 1 - C Wing,Building 1 - D Wing,Building 1 - E Wing
| Project | Developer | Location | Possession |
| Sheltrex Smart Phone City Project 2 - Phase Ii | Sheltrex Karjat Pvt. Ltd. | 27 B/1 To 27 B/4 | 30-12-2023 00:00:00 |
| Suchandra Heights | Swapnil Chandrakant Bhor | 279 | 30-06-2021 00:00:00 |
| Kartikya Paradise - Building No.1 | Kartikya Spaces | Survey No.1/1 , Village Gundge, Karjat | 30-12-2022 00:00:00 |
| Skyline Riverside Wing G | Skyline Millars Limited | Survey No 103 Part 2 | 31-12-2017 00:00:00 |
| Sheltrex Smart Phone City Project 1 - Phase Iii | Sheltrex Karjat Pvt. Ltd. | Survey No. 7/B1 To 7/B14 | 30-12-2021 00:00:00 |
| The Mist -Phase I | Geecee Ventures Limited | Land Bearing Sno 41 H No 0 Village Dahivali S No 97 H No 0 Village Akurle Taluka Karjat Dist Raigad | 30-09-2020 00:00:00 |
| Sheltrex Smart Phone City Project 1- Phase Vi | Sheltrex Karjat Pvt. Ltd. | Survey No. 7/B1 To 7/B14 | 30-12-2021 00:00:00 |
| Sheltrex Smart Phone City Project 1- Phase V | Sheltrex Karjat Pvt. Ltd. | Survey No. 7/B1 To 7/B14 | 30-12-2021 00:00:00 |
| Sheltrex Smart Phone City Project 1 - Phase Ii | Sheltrex Karjat Pvt. Ltd. | Survey No. 7/B1 To 7/B14 | 30-12-2021 00:00:00 |
| Aanandi Heights | Vighnaharta Developers | Kotwal Nagar | 01-12-2024 00:00:00 |
-
Developer:
Geecee Ventures Limited
-
Phone:
-
Address:
-
Arcadia Building
| MAHA REARA No: |
P52000007101 |
| Project Type |
Others |
| RERA Project Status |
Ongoing |
| Architect |
Smt. Devayani Musale (M/S Design Direction) |
| Funding Bank |
HDFC BANK |
| Proposed Possession |
30 Sep 2020 |
| Revised Possession |
30 Sep 2020 |
| Extended Possession |
|
| Litigations |
No Litigations |
| Last Modified |
17 Aug 2017 |
| Last Retrived |
28 Jul 2025 |
The Mist -Phase I QR Code
The Mist -Phase I
MahaRERA - P52000007101
| Type | Area |
| 1 BHK | 31.55 Sq.mts. ( 340 Sq.ft. ) |
| 1 BHK | 32 Sq.mts. ( 344 Sq.ft. ) |
| 1 BHK | 32.04 Sq.mts. ( 345 Sq.ft. ) |
| 1 BHK | 32.84 Sq.mts. ( 353 Sq.ft. ) |
| Shop | 12.64 Sq.mts. ( 136 Sq.ft. ) |
| Shop | 13.03 Sq.mts. ( 140 Sq.ft. ) |
| Shop | 13.22 Sq.mts. ( 142 Sq.ft. ) |
| Shop | 15.77 Sq.mts. ( 170 Sq.ft. ) |
| Shop | 15.89 Sq.mts. ( 171 Sq.ft. ) |
| 1 BHK | 31.8 Sq.mts. ( 342 Sq.ft. ) |
| 1 BHK | 31.95 Sq.mts. ( 344 Sq.ft. ) |
| 2 BHK | 45.83 Sq.mts. ( 493 Sq.ft. ) |
| 2 BHK | 46.27 Sq.mts. ( 498 Sq.ft. ) |
| Shop | 12.16 Sq.mts. ( 131 Sq.ft. ) |
| Shop | 12.78 Sq.mts. ( 138 Sq.ft. ) |
| Shop | 12.97 Sq.mts. ( 140 Sq.ft. ) |
| Shop | 16.1 Sq.mts. ( 173 Sq.ft. ) |
| Shop | 16.28 Sq.mts. ( 175 Sq.ft. ) |
| Shop | 23.37 Sq.mts. ( 252 Sq.ft. ) |
| Shop | 30.26 Sq.mts. ( 326 Sq.ft. ) |
| Shop | 30.59 Sq.mts. ( 329 Sq.ft. ) |
| 1 BHK | 30.98 Sq.mts. ( 333 Sq.ft. ) |
| 1 BHK | 31.05 Sq.mts. ( 334 Sq.ft. ) |
| Shop | 12.02 Sq.mts. ( 129 Sq.ft. ) |
| Shop | 12.21 Sq.mts. ( 131 Sq.ft. ) |
| Shop | 13.17 Sq.mts. ( 142 Sq.ft. ) |
| Shop | 15.72 Sq.mts. ( 169 Sq.ft. ) |
| 1 BHK | 30.34 Sq.mts. ( 327 Sq.ft. ) |
| Shop | 13.02 Sq.mts. ( 140 Sq.ft. ) |
Facilities & Amenities
Facilities, Amenities & Common areas details of The Mist -Phase Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
| Project Facilities & Amenities |
Available |
Details |
Aggregate area of recreational Open Space
|
|
Work Not Yet Started |
|
|
|
Na |
Electrical Meter Room, Sub-Station, Receiving Station100% completed
|
|
Done |
|
|
|
Na |
Fire Protection And Fire Safety
Requirements100% completed
|
|
Done |
Landscaping & Tree Planting100% completed
|
|
Tree Planting Only |
|
|
|
Na |
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
|
|
Work Going On |
Solid Waste Management And Disposal90% completed
|
|
Work Going On |
Storm Water Drains100% completed
|
|
Storm Water Drains Within Plot Work Going On |
|
|
|
Na |
Treatment And Disposal Of Sewage And Sullage Water90% completed
|
|
Work Going On |
Water Conservation, Rain water Harvesting100% completed
|
|
Rain Water Harvesting Only Work Going On |
|
|
|
Municipal Water Supply |
Buildings / Wings in The Mist -Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Mist -Phase I by Geecee Ventures Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Apartments Statistics
138
apartments in total
Saleable Area Statistics (Sq. ft.)
44396
Total
Total 138 apartments in project. 113 apartments booked. 81% apartments booked.
Total 44396 Sq.ft. saleable area. 40236 saleable area booked.
91% area booked.
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 - B Wing | Mar 2020 | 8 | 1 | 0 | 0 | 0 | 0 | 1 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.55 Sq.mts. ( 340 Sq.ft. ) | 7 | |
| 1 BHK | 32 Sq.mts. ( 344 Sq.ft. ) | 7 | |
| 1 BHK | 32.04 Sq.mts. ( 345 Sq.ft. ) | 7 | |
| 1 BHK | 32.84 Sq.mts. ( 353 Sq.ft. ) | 7 | |
| Shop | 12.64 Sq.mts. ( 136 Sq.ft. ) | 1 | |
| Shop | 13.03 Sq.mts. ( 140 Sq.ft. ) | 1 | |
| Shop | 13.22 Sq.mts. ( 142 Sq.ft. ) | 1 | |
| Shop | 15.77 Sq.mts. ( 170 Sq.ft. ) | 1 | |
| Shop | 15.89 Sq.mts. ( 171 Sq.ft. ) | 1 | |
33 total apartments / 28 apartments booked. 84% apartments booked. |
| Work Description in Building Building 1 - B Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 - C Wing | Mar 2020 | 8 | 1 | 0 | 0 | 0 | 0 | 5 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 31.8 Sq.mts. ( 342 Sq.ft. ) | 7 | |
| 1 BHK | 31.95 Sq.mts. ( 344 Sq.ft. ) | 7 | |
| 2 BHK | 45.83 Sq.mts. ( 493 Sq.ft. ) | 7 | |
| 2 BHK | 46.27 Sq.mts. ( 498 Sq.ft. ) | 7 | |
| Shop | 12.16 Sq.mts. ( 131 Sq.ft. ) | 1 | |
| Shop | 12.78 Sq.mts. ( 138 Sq.ft. ) | 1 | |
| Shop | 12.97 Sq.mts. ( 140 Sq.ft. ) | 1 | |
| Shop | 13.03 Sq.mts. ( 140 Sq.ft. ) | 1 | |
| Shop | 16.1 Sq.mts. ( 173 Sq.ft. ) | 1 | |
| Shop | 16.28 Sq.mts. ( 175 Sq.ft. ) | 1 | |
| Shop | 23.37 Sq.mts. ( 252 Sq.ft. ) | 1 | |
| Shop | 30.26 Sq.mts. ( 326 Sq.ft. ) | 1 | |
| Shop | 30.59 Sq.mts. ( 329 Sq.ft. ) | 1 | |
37 total apartments / 28 apartments booked. 75% apartments booked. |
| Work Description in Building Building 1 - C Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 - D Wing | Mar 2020 | 8 | 1 | 0 | 0 | 0 | 0 | 2 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.98 Sq.mts. ( 333 Sq.ft. ) | 14 | |
| 1 BHK | 31.05 Sq.mts. ( 334 Sq.ft. ) | 14 | |
| Shop | 12.02 Sq.mts. ( 129 Sq.ft. ) | 1 | |
| Shop | 12.21 Sq.mts. ( 131 Sq.ft. ) | 1 | |
| Shop | 13.03 Sq.mts. ( 140 Sq.ft. ) | 1 | |
| Shop | 13.17 Sq.mts. ( 142 Sq.ft. ) | 1 | |
| Shop | 15.72 Sq.mts. ( 169 Sq.ft. ) | 1 | |
| Shop | 15.89 Sq.mts. ( 171 Sq.ft. ) | 1 | |
34 total apartments / 29 apartments booked. 85% apartments booked. |
| Work Description in Building Building 1 - D Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
| Wing | Proposed Date of Completion | Number of Slabs | Plinth | Basement's | Stilts | Podium's | Open Parkings | Closed Parkings |
| Building 1 - E Wing | Mar 2020 | 8 | 1 | 0 | 0 | 0 | 0 | 2 |
| Apartment Type | Carpet Area | Number of Apartments | Booked Apartments |
| 1 BHK | 30.34 Sq.mts. ( 327 Sq.ft. ) | 7 | |
| 1 BHK | 30.98 Sq.mts. ( 333 Sq.ft. ) | 7 | |
| 1 BHK | 31.05 Sq.mts. ( 334 Sq.ft. ) | 14 | |
| Shop | 12.02 Sq.mts. ( 129 Sq.ft. ) | 1 | |
| Shop | 12.21 Sq.mts. ( 131 Sq.ft. ) | 1 | |
| Shop | 13.02 Sq.mts. ( 140 Sq.ft. ) | 1 | |
| Shop | 13.17 Sq.mts. ( 142 Sq.ft. ) | 1 | |
| Shop | 15.72 Sq.mts. ( 169 Sq.ft. ) | 1 | |
| Shop | 15.89 Sq.mts. ( 171 Sq.ft. ) | 1 | |
34 total apartments / 28 apartments booked. 82% apartments booked. |
| Work Description in Building Building 1 - E Wing | Completion |
| Basement (if any) | |
| Excavation | |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | |
| Plinth | |
| Podiums (if any) | |
| Sanitary Fittings within the flats / premises | |
| Slabs of Super Structure | |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | |
| Stilt Floor | |
Channel Partners Registered by Developer
Geecee Ventures Limited
for Project
The Mist -Phase I
last updated on
28 Jul 2025 as per information obtained from MARA RERA.
| Name |
Company |
Location |
Mobile |
Designation |