Project overview

The Mist -Phase I is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000007101. The Mist -Phase I is located at Land Bearing Sno 41 H No 0 Village Dahivali S No 97 H No 0 Village Akurle Taluka Karjat Dist Raigad. This is a Ongoing being developed by Geecee Ventures Limited.

The Mist -Phase I has 1 BHK & Shop Apartments with carpet areas ranging from 129 to 334 Sq.ft. Carpet. The Project has total 138 of which 25 are currently available for sale.

The Mist -Phase I is being developed on a total land area of 27642 Sq.ft. out of which 10172 Sq.ft. i.e 37% is reserved for recreational purposes. The Mist -Phase I has 4 Wings / Towers Building 1 - B Wing,Building 1 - C Wing,Building 1 - D Wing,Building 1 - E Wing

ProjectDeveloperLocationPossession
Sheltrex Smart Phone City Project 2 - Phase IiSheltrex Karjat Pvt. Ltd.27 B/1 To 27 B/430-12-2023 00:00:00
Suchandra HeightsSwapnil Chandrakant Bhor27930-06-2021 00:00:00
Kartikya Paradise - Building No.1Kartikya SpacesSurvey No.1/1 , Village Gundge, Karjat30-12-2022 00:00:00
Skyline Riverside Wing GSkyline Millars LimitedSurvey No 103 Part 231-12-2017 00:00:00
Sheltrex Smart Phone City Project 1 - Phase IiiSheltrex Karjat Pvt. Ltd.Survey No. 7/B1 To 7/B1430-12-2021 00:00:00
The Mist -Phase IGeecee Ventures LimitedLand Bearing Sno 41 H No 0 Village Dahivali S No 97 H No 0 Village Akurle Taluka Karjat Dist Raigad30-09-2020 00:00:00
Sheltrex Smart Phone City Project 1- Phase ViSheltrex Karjat Pvt. Ltd.Survey No. 7/B1 To 7/B1430-12-2021 00:00:00
Sheltrex Smart Phone City Project 1- Phase VSheltrex Karjat Pvt. Ltd.Survey No. 7/B1 To 7/B1430-12-2021 00:00:00
Sheltrex Smart Phone City Project 1 - Phase IiSheltrex Karjat Pvt. Ltd.Survey No. 7/B1 To 7/B1430-12-2021 00:00:00
Aanandi HeightsVighnaharta DevelopersKotwal Nagar01-12-2024 00:00:00
Project Details
  • Project:
    The Mist -Phase I
  • Location:
  • Land Bearing Sno 41 H No 0 Village Dahivali S No 97 H No 0 Village Akurle Taluka Karjat Dist Raigad
  • Const. Stage:
    Ongoing
  • Possession:
    30 Sep 2020
Developer Details

  • Developer:
    Geecee Ventures Limited
  • Phone:
  • Address:
  • Arcadia Building
Project RERA Details
MAHA REARA No: P52000007101
Project Type Others
RERA Project Status Ongoing
Architect Smt. Devayani Musale (M/S Design Direction)
Funding Bank HDFC BANK
Proposed Possession 30 Sep 2020
Revised Possession 30 Sep 2020
Extended Possession
Litigations No Litigations
Last Modified 17 Aug 2017
Last Retrived 28 Jul 2025
The Mist -Phase I QR Code
The Mist -Phase I
MahaRERA - P52000007101
Apartment Details & Configuration
TypeArea
1 BHK31.55 Sq.mts. ( 340 Sq.ft. )
1 BHK32 Sq.mts. ( 344 Sq.ft. )
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )
Shop12.64 Sq.mts. ( 136 Sq.ft. )
Shop13.03 Sq.mts. ( 140 Sq.ft. )
Shop13.22 Sq.mts. ( 142 Sq.ft. )
Shop15.77 Sq.mts. ( 170 Sq.ft. )
Shop15.89 Sq.mts. ( 171 Sq.ft. )
1 BHK31.8 Sq.mts. ( 342 Sq.ft. )
1 BHK31.95 Sq.mts. ( 344 Sq.ft. )
2 BHK45.83 Sq.mts. ( 493 Sq.ft. )
2 BHK46.27 Sq.mts. ( 498 Sq.ft. )
Shop12.16 Sq.mts. ( 131 Sq.ft. )
Shop12.78 Sq.mts. ( 138 Sq.ft. )
Shop12.97 Sq.mts. ( 140 Sq.ft. )
Shop16.1 Sq.mts. ( 173 Sq.ft. )
Shop16.28 Sq.mts. ( 175 Sq.ft. )
Shop23.37 Sq.mts. ( 252 Sq.ft. )
Shop30.26 Sq.mts. ( 326 Sq.ft. )
Shop30.59 Sq.mts. ( 329 Sq.ft. )
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )
1 BHK31.05 Sq.mts. ( 334 Sq.ft. )
Shop12.02 Sq.mts. ( 129 Sq.ft. )
Shop12.21 Sq.mts. ( 131 Sq.ft. )
Shop13.17 Sq.mts. ( 142 Sq.ft. )
Shop15.72 Sq.mts. ( 169 Sq.ft. )
1 BHK30.34 Sq.mts. ( 327 Sq.ft. )
Shop13.02 Sq.mts. ( 140 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Mist -Phase Ilast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Work Not Yet Started
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station100% completed
95% Complete
Done
Energy management
Na
Fire Protection And Fire Safety Requirements100% completed
95% Complete
Done
Landscaping & Tree Planting100% completed
95% Complete
Tree Planting Only
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Work Going On
Solid Waste Management And Disposal90% completed
90% Complete
Work Going On
Storm Water Drains100% completed
95% Complete
Storm Water Drains Within Plot Work Going On
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water90% completed
90% Complete
Work Going On
Water Conservation, Rain water Harvesting100% completed
95% Complete
Rain Water Harvesting Only Work Going On
Water Supply
Municipal Water Supply
Buildings / Wings in The Mist -Phase I
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Mist -Phase I by Geecee Ventures Limitedlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

27642 Sq. ft.

Project Area

10172 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

138 apartments in total
Total
138
Booked
113
Available
25

Saleable Area Statistics (Sq. ft.)

44396 Total
Total
44396
Booked
40236
Available
4160
Total 138 apartments in project. 113 apartments booked. 81% apartments booked.
Total 44396 Sq.ft. saleable area. 40236 saleable area booked.
91% area booked.

Building 1 - B Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - B WingMar 20208100001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.55 Sq.mts. ( 340 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK32 Sq.mts. ( 344 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK32.04 Sq.mts. ( 345 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK32.84 Sq.mts. ( 353 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop12.64 Sq.mts. ( 136 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.03 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.22 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.77 Sq.mts. ( 170 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.89 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
33 total apartments / 28 apartments booked. 84% apartments booked.
Work Description in Building Building 1 - B WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 1 - C Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - C WingMar 20208100005
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.8 Sq.mts. ( 342 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.95 Sq.mts. ( 344 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK45.83 Sq.mts. ( 493 Sq.ft. )7
7 Booked100% Booked
100% Booked
2 BHK46.27 Sq.mts. ( 498 Sq.ft. )7
7 Booked100% Booked
100% Booked
Shop12.16 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.78 Sq.mts. ( 138 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.97 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.03 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.1 Sq.mts. ( 173 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.28 Sq.mts. ( 175 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop23.37 Sq.mts. ( 252 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.26 Sq.mts. ( 326 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop30.59 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
37 total apartments / 28 apartments booked. 75% apartments booked.
Work Description in Building Building 1 - C WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked

Building 1 - D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - D WingMar 20208100002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )14
14 Booked100% Booked
100% Booked
1 BHK31.05 Sq.mts. ( 334 Sq.ft. )14
14 Booked100% Booked
100% Booked
Shop12.02 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.21 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.03 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.17 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.72 Sq.mts. ( 169 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop15.89 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 29 apartments booked. 85% apartments booked.
Work Description in Building Building 1 - D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress85% done
85% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress75% done
75% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress90% done
90% Booked
Stilt Floor

Building 1 - E Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building 1 - E WingMar 20208100002
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.34 Sq.mts. ( 327 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK30.98 Sq.mts. ( 333 Sq.ft. )7
7 Booked100% Booked
100% Booked
1 BHK31.05 Sq.mts. ( 334 Sq.ft. )14
14 Booked100% Booked
100% Booked
Shop12.02 Sq.mts. ( 129 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop12.21 Sq.mts. ( 131 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.02 Sq.mts. ( 140 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop13.17 Sq.mts. ( 142 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.72 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.89 Sq.mts. ( 171 Sq.ft. )1
None Booked0% Booked
0% Booked
34 total apartments / 28 apartments booked. 82% apartments booked.
Work Description in Building Building 1 - E WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
work-in-progress95% done
95% Booked
Channel Partners
Channel Partners Registered by Developer
Geecee Ventures Limited
for Project
The Mist -Phase I
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation