Project overview

The Address Wing C Phase Iii is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700050566. The Address Wing C Phase Iii is located at Gut No. 1 Hissa No 1/2, 3 & 3A. This is a New being developed by Sadguru Associate.

The Address Wing C Phase Iii has 1 BHK, 2 BHK, Office space & Shop Apartments with carpet areas ranging from 117 to 643 Sq.ft. Carpet. The Project has total 127 of which 88 are currently available for sale.

The Address Wing C Phase Iii is being developed on a total land area of 58072 Sq.ft. The Address Wing C Phase Iii has 1 Wings / Towers The Address Wing C

ProjectDeveloperLocationPossession
Arham VatikaArham EnterprisesS No.140 H. No. 8A31-07-2018 00:00:00
Shiv-GauriShivam Developers32/1/A/8/Plot No 830-12-2021 00:00:00
Om VatikaOm Shiv EnterprisesS No.105, H No.3P30-06-2018 00:00:00
PalmPranjee Properties Pvt. LtdPlot No. 528-05-2021 00:00:00
Vishnu Vatika Nx Wing C1 E1 E2 Phase 1Vishnu GroupS No. 131 /1 And 132/230-10-2023 00:00:00
Shashwat ParkModern ConstructionGat No. 65 Hissa No. 2V31-12-2018 00:00:00
Shubh AarambhPacific Construction & Developers105A, 3P, 830-04-2018 00:00:00
Hill Side Residency Wing A B And CSupreme Developers421503, Thane30-12-2022 00:00:00
Vedant Nakshatra Abc Phase 1Mohan Hardasmal TharwaniS No 70/1/2 And S No 70/5/B31-12-2017 00:00:00
Samruddhi Evergreens Phase-4CPoddar Housing And Development LimitedThane, 421503, -31-03-2020 00:00:00
Maple City Phase IShree Chintamani EnterprisesS No 141 S No143 H No 4A S No 144 H No 1A And 230-12-2021 00:00:00
Umiya Complex Phase IiUmiya Associates12 P30-11-2020 00:00:00
Amrut ManjilSai Shradha DevelopersS No 120 H No 4 & S No 120 H No 731-01-2028 00:00:00
Krishna DarshanKrishna BuildconSurvey No. 148, Hissa No. 20/A31-12-2025 00:00:00
Aarsh Avenue - Saal Wood And Silver WoodSatyam ConstructionS. No. 56 H. No. 10/131-12-2019 00:00:00
Vastu ShilpVastu HomesS No 105A Hissa No 4231-03-2018 00:00:00
Sadguru Harmony Ph-1 Wing ASadguru AssociateGut No 219/1/2 21831-12-2019 00:00:00
Wing D- DurvankurM K Patil DevelopersGut No 8 P19-08-2019 00:00:00
Jadhav MarketS J Construction CoS No 48 Hissa No 11P And Hissa No 14 And Hissa No 15P20-12-2021 00:00:00
Satish Oak HeightShree Sai Prathamesh DevelopersS No 66 H No 911 B And C, S No 66 H No 1031-03-2026 00:00:00
Sarvesh Dream City Wing DSai Shradha DevelopersS No 76 H No 1531-12-2025 00:00:00
Nirmala ParadisePokhriyal And AssociatesS No 12730-09-2024 00:00:00
Vastu SquareVastu BuildersS No 28A Hissa No 3/1P Plot No 7A31-03-2018 00:00:00
Om Savai NiketanSagar Super Structures Private LimitedPlot Bearing S.No.143, H.No.5-631-05-2018 00:00:00
AsawariAshish Waman GoleSurvey No 38 Hissa No 2A1 And 2A2 , Plot No 3 And 531-03-2018 00:00:00
Tulsi AahanRaj GroupS. No.39 , H No. 1,2,331-12-2019 00:00:00
Kondilkar ResidencyAditi Construction50/6P01-01-2019 00:00:00
Amrut Vishwa Phase 2Sai Shradha DevelopersSurvey No. 173 Hissa No. 331-12-2019 00:00:00
Precious SolitaireShubh LifespacesGut No 90/2, 90/2A31-08-2026 00:00:00
Shashwat Park Z-5 A And B Wing ApartmentShashwat HomesGut No. 105, H. No. 5/1/A/130-06-2025 00:00:00
Pinnacle AdarshPinnacle EnterprisesSurvey No 5 Hiss No 4 Plot No 930-06-2025 00:00:00
Shubh VatikaShubh Enterprises7A, H No 230-11-2018 00:00:00
BhagatiniwasShri Sadguru ConstructionSurvey No 42 P30-12-2018 00:00:00
Shashwat Park - Phase I - Wing PShashwat HomesGut No 761131-12-2018 00:00:00
Shashwat Park -Phase Ii -Z4bShashwat HomesGut No 65/1A31-12-2018 00:00:00
Aruna UlhasGaondevi Developers49/10/3,431-08-2018 00:00:00
ShulpaniShree Balaji Builders & DevelopersS No 53 H No 1531-08-2018 00:00:00
Swanand Treo Building No 3 -Swami GannayakSwanand HeightsSurvey No 13, Hissa No 231-12-2017 00:00:00
Shashwat Park 1-AbShashwat HomesGut No 78 1, 80 3, 7930-03-2022 00:00:00
Saurabh ArcadeM/S Krishna Builders & DevelopersS No 7A H No 4A Plot No 1 230-12-2021 00:00:00
Ravindranath Tagore NiketanSai City DevelopersSurvey No 45 Hissa No 4 Plot No 630-12-2020 00:00:00
Avantika ResidencySanchita Construction28A/2/1P27-08-2018 00:00:00
Murlidhar PlazaSaipoojan EnterprisesGut No 40 Hissa No 1619-12-2021 00:00:00
Thanekar ParadiseAjay Madhukar Thanekar81/1A30-12-2019 00:00:00
Motiram PuramNayan Dilip DalalSurvey No 183 H.No 9 Survey No 184 Hissa No 2A30-05-2022 00:00:00
Divya Jyot ComplexShree Aditi DevelopersGut No 76 Hissa No 4 And 930-12-2021 00:00:00
Trimurti ResidencyTrimurti Construction CoPlot No. 107, Sector 21, Ulwe31-12-2018 00:00:00
Apte HomesShree Siddhi DevelopersSurvey No-44, Hissa No-1/A/331-12-2018 00:00:00
Sonal Co-Op Housing SocietySoham Developers4918231-01-2019 00:00:00
Ekdant SmaranPrashant Tukaram BaeetSurvey No. 41, H.No. 1, Plot No. 116-03-2021 00:00:00
Shivam GreensM.K.DevelopersGut No 5 Hissa No 6, 11 And 1330-12-2023 00:00:00
Parshva Residency Wing CParshva Realtors2, 331-12-2019 00:00:00
Mangalam ArcadeMangalam EnterprisesSurvey No 7 Hissa No 1(P) Plot No 4224-04-2024 00:00:00
The Address Wing C Phase IiiSadguru AssociateGut No. 1 Hissa No 1/2, 3 & 3A31-12-2026 00:00:00
First EleganceGurupreet Singh Baldev Singh SandhuSurvey No 26, Hissa No2/A/23, Plot No 20, Shirgaon31-12-2025 00:00:00
Sai ShrutiPinnacle ConstructionsSurveyno 331-03-2018 00:00:00
Rubyana Residency Phase 1Sudhir Damodar GhatnekarSurvey No. 8930-06-2018 00:00:00
Vedant Imperial Abc Phase 1Mohan Hardasmal TharwaniS No 56/3 57/1P 57/330-11-2019 00:00:00
Evergreen Residency C WingBalaji ConstructionS No 25 Hissa No 5 And 6 And S No 24 Hissa No 130-12-2022 00:00:00
Aditi PlazaChintamani Construction53/13P30-06-2018 00:00:00
Shree Krishna ResidencyPanchala Builders & DevelopersPlot Gut No.69 30-12-2023 00:00:00
Madhumalti Apartment B WingShree Datta EnterprisesS No 105A, H No 4/2,3,431-03-2018 00:00:00
ParshvadharaParshvanath Developers38 Hissa No 630-04-2019 00:00:00
Swaroop OrchidSwaroop ConstructionS No 87 Hissa No 1130-06-2018 00:00:00
Datar HeightsSaleem Abdul ShaikhS.No 7A31-10-2019 00:00:00
Project Details
  • Project:
    The Address Wing C Phase Iii
  • Location:
  • Gut No. 1 Hissa No 1/2, 3 & 3A
  • Const. Stage:
    New
  • Possession:
    31 Dec 2026
Developer Details

  • Developer:
    Sadguru Associate
  • Phone:
  • Address:
  • Sadguru Heritage
Project RERA Details
MAHA REARA No: P51700050566
Project Type Residential / Group Housing
RERA Project Status New
Architect Raj Associates
Funding Bank BANK OF INDIA
Proposed Possession 31 Dec 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 21 Apr 2023
Last Retrived 26 Jul 2025
The Address Wing C Phase Iii QR Code
The Address Wing C Phase Iii
MahaRERA - P51700050566
Apartment Details & Configuration
TypeArea
1 BHK40.82 Sq.mts. ( 439 Sq.ft. )
1 BHK40.85 Sq.mts. ( 440 Sq.ft. )
1 BHK41.9 Sq.mts. ( 451 Sq.ft. )
1 BHK42.28 Sq.mts. ( 455 Sq.ft. )
1 BHK42.6 Sq.mts. ( 459 Sq.ft. )
1 BHK43.68 Sq.mts. ( 470 Sq.ft. )
1 BHK45.84 Sq.mts. ( 493 Sq.ft. )
1 BHK45.9 Sq.mts. ( 494 Sq.ft. )
1 BHK55.59 Sq.mts. ( 598 Sq.ft. )
2 BHK56.66 Sq.mts. ( 610 Sq.ft. )
2 BHK57.54 Sq.mts. ( 619 Sq.ft. )
2 BHK58.66 Sq.mts. ( 631 Sq.ft. )
2 BHK59.73 Sq.mts. ( 643 Sq.ft. )
2 BHK53.71 Sq.mts. ( 578 Sq.ft. )
Office space30.41 Sq.mts. ( 327 Sq.ft. )
Office space39.6 Sq.mts. ( 426 Sq.ft. )
Office space46.27 Sq.mts. ( 498 Sq.ft. )
Shop10.87 Sq.mts. ( 117 Sq.ft. )
Shop14.89 Sq.mts. ( 160 Sq.ft. )
Shop15.06 Sq.mts. ( 162 Sq.ft. )
Shop15.12 Sq.mts. ( 163 Sq.ft. )
Shop15.52 Sq.mts. ( 167 Sq.ft. )
Shop15.72 Sq.mts. ( 169 Sq.ft. )
Shop16.08 Sq.mts. ( 173 Sq.ft. )
Shop17.02 Sq.mts. ( 183 Sq.ft. )
Shop18.01 Sq.mts. ( 194 Sq.ft. )
Shop18.56 Sq.mts. ( 200 Sq.ft. )
Shop18.86 Sq.mts. ( 203 Sq.ft. )
Shop20.35 Sq.mts. ( 219 Sq.ft. )
Shop22.55 Sq.mts. ( 243 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of The Address Wing C Phase Iiilast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Meter Room Provided Work
Energy management
Na
Fire Protection And Fire Safety Requirements
Fire Protection And Fire Safety Work
Landscaping & Tree Planting
Tree Planting Work
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Municipal Sewerage Line Work
Solid Waste Management And Disposal
Na
Storm Water Drains
Storm Water Drain Work
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Rain Water Harvesting Work
Water Supply
Mjp Will Provide Water Connection After Oc
Buildings / Wings in The Address Wing C Phase Iii
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of The Address Wing C Phase Iii by Sadguru Associatelast updated on 26 Jul 2025 as per information obtained from MARA RERA.

58072 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

127 apartments in total
Total
127
Booked
39
Available
88

Saleable Area Statistics (Sq. ft.)

57115 Total
Total
57115
Booked
17144
Available
39971
Total 127 apartments in project. 39 apartments booked. 30% apartments booked.
Total 57115 Sq.ft. saleable area. 17144 saleable area booked.
30% area booked.

The Address Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
The Address Wing CDec 202614100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK40.82 Sq.mts. ( 439 Sq.ft. )23
1 BHK40.85 Sq.mts. ( 440 Sq.ft. )27
11 Booked40% Booked
40% Booked
1 BHK41.9 Sq.mts. ( 451 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK42.28 Sq.mts. ( 455 Sq.ft. )12
1 BHK42.6 Sq.mts. ( 459 Sq.ft. )10
4 Booked40% Booked
40% Booked
1 BHK43.68 Sq.mts. ( 470 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK45.84 Sq.mts. ( 493 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK45.9 Sq.mts. ( 494 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK55.59 Sq.mts. ( 598 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK56.66 Sq.mts. ( 610 Sq.ft. )2
1 Booked50% Booked
50% Booked
2 BHK57.54 Sq.mts. ( 619 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK58.66 Sq.mts. ( 631 Sq.ft. )13
6 Booked46% Booked
46% Booked
2 BHK59.73 Sq.mts. ( 643 Sq.ft. )1
None Booked0% Booked
0% Booked
2 BHK53.71 Sq.mts. ( 578 Sq.ft. )13
3 Booked23% Booked
23% Booked
Office space30.41 Sq.mts. ( 327 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space39.6 Sq.mts. ( 426 Sq.ft. )1
None Booked0% Booked
0% Booked
Office space46.27 Sq.mts. ( 498 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop10.87 Sq.mts. ( 117 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop14.89 Sq.mts. ( 160 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.06 Sq.mts. ( 162 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop15.12 Sq.mts. ( 163 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop15.52 Sq.mts. ( 167 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop15.72 Sq.mts. ( 169 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop16.08 Sq.mts. ( 173 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop17.02 Sq.mts. ( 183 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop18.01 Sq.mts. ( 194 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop18.56 Sq.mts. ( 200 Sq.ft. )2
1 Booked50% Booked
50% Booked
Shop18.86 Sq.mts. ( 203 Sq.ft. )1
None Booked0% Booked
0% Booked
Shop20.35 Sq.mts. ( 219 Sq.ft. )1
1 Booked100% Booked
100% Booked
Shop22.55 Sq.mts. ( 243 Sq.ft. )2
None Booked0% Booked
0% Booked
127 total apartments / 39 apartments booked. 30% apartments booked.
Work Description in Building The Address Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress75% done
75% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress75% done
75% Booked
Channel Partners
Channel Partners Registered by Developer
Sadguru Associate
for Project
The Address Wing C Phase Iii
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation