Project overview

Tharwani Solitaire Phase Iv is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700030172. Tharwani Solitaire Phase Iv is located at 8/1,8/2,12/1 -12/7. This is a New being developed by Anil Hardasmal Tharwani.

Tharwani Solitaire Phase Iv has 2 BHK Apartments with carpet areas ranging from 717 to 755 Sq.ft. Carpet. The Project has total 208 of which 168 are currently available for sale.

Tharwani Solitaire Phase Iv is being developed on a total land area of 260088 Sq.ft. out of which 120277 Sq.ft. i.e 46% is reserved for recreational purposes. Tharwani Solitaire Phase Iv has 3 Wings / Towers Spinel,Topaz,Vivianite

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tharwani Solitaire Phase Iv
  • Location:
  • 8/1,8/2,12/1 -12/7
  • Const. Stage:
    New
  • Possession:
    31 Jul 2024
Developer Details

  • Developer:
    Anil Hardasmal Tharwani
  • Phone:
  • Address:
  • Tharwani Solitaire
Project RERA Details
MAHA REARA No: P51700030172
Project Type Residential / Group Housing
RERA Project Status New
Architect Dinesh Bajaj
Funding Bank BANK OF BARODA
Proposed Possession 31 Jul 2024
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Nov 2024
Last Retrived 26 Jul 2025
Tharwani Solitaire Phase Iv QR Code
Tharwani Solitaire Phase Iv
MahaRERA - P51700030172
Apartment Details & Configuration
TypeArea
2 BHK61.73 Sq.mts. ( 664 Sq.ft. )
3 BHK88.8 Sq.mts. ( 956 Sq.ft. )
3 BHK91.42 Sq.mts. ( 984 Sq.ft. )
3 BHK94.84 Sq.mts. ( 1021 Sq.ft. )
2 BHK66.6 Sq.mts. ( 717 Sq.ft. )
2 BHK69.11 Sq.mts. ( 744 Sq.ft. )
2 BHK72.91 Sq.mts. ( 785 Sq.ft. )
3 BHK82.85 Sq.mts. ( 892 Sq.ft. )
3 BHK93.97 Sq.mts. ( 1011 Sq.ft. )
3 BHK106.47 Sq.mts. ( 1146 Sq.ft. )
4 BHK128.78 Sq.mts. ( 1386 Sq.ft. )
2 BHK70.12 Sq.mts. ( 755 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tharwani Solitaire Phase Ivlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
---
Community Buildings
-----
Electrical Meter Room, Sub-Station, Receiving Station
Provided Two Nos Of Sub Station And Meter Room
Energy management
----
Fire Protection And Fire Safety Requirements
Provided As Per Fire Noc
Landscaping & Tree Planting
---
Open Parking
---
Sewerage (Chamber, Lines, Septic Tank , STP)
Provided Chamber Lines And Stp
Solid Waste Management And Disposal
Provided Owc
Storm Water Drains
Provided Catch Pits
Street Lighting
Provided Street Lights
Treatment And Disposal Of Sewage And Sullage Water
After Treatment Used As Flushing Water
Water Conservation, Rain water Harvesting
---
Water Supply
----
Buildings / Wings in Tharwani Solitaire Phase Iv
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tharwani Solitaire Phase Iv by Anil Hardasmal Tharwanilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

260088 Sq. ft.

Project Area

120277 Sq. ft.

Recreational Open Space

Total 3

Wings / Towers in Project

Apartments Statistics

208 apartments in total
Total
208
Booked
40
Available
168

Saleable Area Statistics (Sq. ft.)

179007 Total
Total
179007
Booked
35667
Available
143341
Total 208 apartments in project. 40 apartments booked. 19% apartments booked.
Total 179007 Sq.ft. saleable area. 35667 saleable area booked.
20% area booked.

Spinel

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
SpinelJul 2024171011540
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK61.73 Sq.mts. ( 664 Sq.ft. )15
None Booked0% Booked
0% Booked
3 BHK88.8 Sq.mts. ( 956 Sq.ft. )15
None Booked0% Booked
0% Booked
3 BHK91.42 Sq.mts. ( 984 Sq.ft. )15
None Booked0% Booked
0% Booked
3 BHK94.84 Sq.mts. ( 1021 Sq.ft. )15
None Booked0% Booked
0% Booked
60 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building SpinelCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Topaz

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
TopazJul 20241710111050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.6 Sq.mts. ( 717 Sq.ft. )13
7 Booked53% Booked
53% Booked
2 BHK69.11 Sq.mts. ( 744 Sq.ft. )15
8 Booked53% Booked
53% Booked
2 BHK72.91 Sq.mts. ( 785 Sq.ft. )13
8 Booked61% Booked
61% Booked
3 BHK82.85 Sq.mts. ( 892 Sq.ft. )2
None Booked0% Booked
0% Booked
3 BHK93.97 Sq.mts. ( 1011 Sq.ft. )30
3 BHK106.47 Sq.mts. ( 1146 Sq.ft. )13
11 Booked84% Booked
84% Booked
4 BHK128.78 Sq.mts. ( 1386 Sq.ft. )2
None Booked0% Booked
0% Booked
88 total apartments / 39 apartments booked. 44% apartments booked.
Work Description in Building TopazCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Vivianite

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
VivianiteJul 2024171011520
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK66.6 Sq.mts. ( 717 Sq.ft. )30
None Booked0% Booked
0% Booked
2 BHK70.12 Sq.mts. ( 755 Sq.ft. )30
60 total apartments / 1 apartments booked. 1% apartments booked.
Work Description in Building VivianiteCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Anil Hardasmal Tharwani
for Project
Tharwani Solitaire Phase Iv
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation