Project overview

Tharwani Ariana Phase Iv is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700007834. Tharwani Ariana Phase Iv is located at Survey No 133/1 Part And Survey 133/1A. This is a Ongoing being developed by Anil Hardasmal Tharwani.

Tharwani Ariana Phase Iv has 1 BHK, 1 BHK TO BE APPROVED, 2 BHK, 2 BHK TO BE APPROVED & COMMERCIAL Apartments with carpet areas ranging from 140 to 513 Sq.ft. Carpet. The Project has total 340 of which 340 are currently available for sale.

Tharwani Ariana Phase Iv is being developed on a total land area of 82237 Sq.ft. out of which 48680 Sq.ft. i.e 59% is reserved for recreational purposes. Tharwani Ariana Phase Iv has 2 Wings / Towers Melody,Nebula

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tharwani Ariana Phase Iv
  • Location:
  • Survey No 133/1 Part And Survey 133/1A
  • Const. Stage:
    Ongoing
  • Possession:
    30 Jun 2024
Developer Details

  • Developer:
    Anil Hardasmal Tharwani
  • Phone:
  • Address:
  • Natali Wing Tharwani Solitaire
Project RERA Details
MAHA REARA No: P51700007834
Project Type Others
RERA Project Status Ongoing
Funding Bank PUNJAB NATIONAL BANK
Proposed Possession 30 Jun 2024
Revised Possession 30 Jun 2024
Extended Possession
Litigations No Litigations
Last Modified 11 Jun 2025
Last Retrived 26 Jul 2025
Tharwani Ariana Phase Iv QR Code
Tharwani Ariana Phase Iv
MahaRERA - P51700007834
Apartment Details & Configuration
TypeArea
1 BHK38.04 Sq.mts. ( 409 Sq.ft. )
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )
1 BHK36.16 Sq.mts. ( 389 Sq.ft. )
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )
2 BHK43.04 Sq.mts. ( 463 Sq.ft. )
2 BHK47.68 Sq.mts. ( 513 Sq.ft. )
COMMERCIAL13 Sq.mts. ( 140 Sq.ft. )
COMMERCIAL16.72 Sq.mts. ( 180 Sq.ft. )
COMMERCIAL17.18 Sq.mts. ( 185 Sq.ft. )
COMMERCIAL19.5 Sq.mts. ( 210 Sq.ft. )
COMMERCIAL20.43 Sq.mts. ( 220 Sq.ft. )
COMMERCIAL33.45 Sq.mts. ( 360 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tharwani Ariana Phase Ivlast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
--
Community Buildings
--
Electrical Meter Room, Sub-Station, Receiving Station
--
Energy management
--
Fire Protection And Fire Safety Requirements
--
Landscaping & Tree Planting
--
Open Parking
--
Sewerage (Chamber, Lines, Septic Tank , STP)
--
Solid Waste Management And Disposal
--
Storm Water Drains
--
Street Lighting
--
Treatment And Disposal Of Sewage And Sullage Water
--
Water Conservation, Rain water Harvesting
--
Water Supply
--
Buildings / Wings in Tharwani Ariana Phase Iv
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tharwani Ariana Phase Iv by Anil Hardasmal Tharwanilast updated on 26 Jul 2025 as per information obtained from MARA RERA.

82237 Sq. ft.

Project Area

48680 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

340 apartments in total
Total
340
Booked
0
Available
340

Saleable Area Statistics (Sq. ft.)

143119 Total
Total
143119
Booked
0
Available
143119
Total 340 apartments in project. 0 apartments booked. 0% apartments booked.
Total 143119 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Melody

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
MelodyJan 1900201010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK38.04 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK36.16 Sq.mts. ( 389 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK TO BE APPROVED36.16 Sq.mts. ( 389 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK TO BE APPROVED38.04 Sq.mts. ( 409 Sq.ft. )28
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK43.04 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK47.68 Sq.mts. ( 513 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK TO BE APPROVED47.68 Sq.mts. ( 513 Sq.ft. )25
None Booked0% Booked
0% Booked
2 BHK TO BE APPROVED42.68 Sq.mts. ( 459 Sq.ft. )28
None Booked0% Booked
0% Booked
COMMERCIAL13 Sq.mts. ( 140 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL16.72 Sq.mts. ( 180 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL17.18 Sq.mts. ( 185 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL19.5 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL20.43 Sq.mts. ( 220 Sq.ft. )5
None Booked0% Booked
0% Booked
COMMERCIAL33.45 Sq.mts. ( 360 Sq.ft. )1
None Booked0% Booked
0% Booked
170 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building MelodyCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Nebula

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
NebulaJan 1900201010013
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK35.43 Sq.mts. ( 381 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK36.16 Sq.mts. ( 389 Sq.ft. )12
None Booked0% Booked
0% Booked
1 BHK38.04 Sq.mts. ( 409 Sq.ft. )1
None Booked0% Booked
0% Booked
1 BHK TO BE APPROVED38.04 Sq.mts. ( 409 Sq.ft. )28
None Booked0% Booked
0% Booked
1 BHK TO BE APPROVED36.16 Sq.mts. ( 389 Sq.ft. )28
None Booked0% Booked
0% Booked
2 BHK42.68 Sq.mts. ( 459 Sq.ft. )10
None Booked0% Booked
0% Booked
2 BHK43.04 Sq.mts. ( 463 Sq.ft. )2
None Booked0% Booked
0% Booked
2 BHK47.68 Sq.mts. ( 513 Sq.ft. )11
None Booked0% Booked
0% Booked
2 BHK TO BE APPROVED47.68 Sq.mts. ( 513 Sq.ft. )25
None Booked0% Booked
0% Booked
2 BHK TO BE APPROVED42.68 Sq.mts. ( 459 Sq.ft. )28
None Booked0% Booked
0% Booked
COMMERCIAL13 Sq.mts. ( 140 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL16.72 Sq.mts. ( 180 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL17.18 Sq.mts. ( 185 Sq.ft. )2
None Booked0% Booked
0% Booked
COMMERCIAL19.5 Sq.mts. ( 210 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL20.43 Sq.mts. ( 220 Sq.ft. )5
None Booked0% Booked
0% Booked
COMMERCIAL33.45 Sq.mts. ( 360 Sq.ft. )1
None Booked0% Booked
0% Booked
170 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building NebulaCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Plinth
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Anil Hardasmal Tharwani
for Project
Tharwani Ariana Phase Iv
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation