Project overview

Ten X Habitat Raymond Realty | Tower A & B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700019265. Ten X Habitat Raymond Realty | Tower A & B is located at 129/1 Part. This is a New being developed by Raymond Limited.

Ten X Habitat Raymond Realty | Tower A & B has 2 BHK Apartments with carpet areas ranging from 502 to 621 Sq.ft. Carpet. The Project has total 638 of which 30 are currently available for sale.

Ten X Habitat Raymond Realty | Tower A & B is being developed on a total land area of 25491 Sq.ft. out of which 4508 Sq.ft. i.e 18% is reserved for recreational purposes. Ten X Habitat Raymond Realty | Tower A & B has 2 Wings / Towers Tower A,Tower B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ten X Habitat Raymond Realty | Tower A & B
  • Location:
  • 129/1 Part
  • Const. Stage:
    New
  • Possession:
    30 Mar 2025
Developer Details

  • Developer:
    Raymond Limited
  • Phone:
  • Address:
  • The Mill
Project RERA Details
MAHA REARA No: P51700019265
Project Type Residential / Group Housing
RERA Project Status New
Funding Bank HDFC BANK
Proposed Possession 30 Mar 2025
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 30 Mar 2021
Last Retrived 26 Jul 2025
Ten X Habitat Raymond Realty | Tower A & B QR Code
Ten X Habitat Raymond Realty | Tower A & B
MahaRERA - P51700019265
Apartment Details & Configuration
TypeArea
2 BHK46.63 Sq.mts. ( 502 Sq.ft. )
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )
2 BHK57.08 Sq.mts. ( 614 Sq.ft. )
2 BHK57.68 Sq.mts. ( 621 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ten X Habitat Raymond Realty | Tower A & Blast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Common Amenities For Existing &Amp; Future Development
Community Buildings
Common Amenities For Existing &Amp; Future Development
Electrical Meter Room, Sub-Station, Receiving Station
Common Amenities For Existing &Amp; Future Development
Energy management
Common Amenities For Existing &Amp; Future Development
Fire Protection And Fire Safety Requirements
Common Amenities For Existing &Amp; Future Development
Landscaping & Tree Planting
Common Amenities For Existing &Amp; Future Development
Open Parking
Common Amenities For Existing &Amp; Future Development
Sewerage (Chamber, Lines, Septic Tank , STP)
Common Amenities For Existing &Amp; Future Development
Solid Waste Management And Disposal
Common Amenities For Existing &Amp; Future Development
Storm Water Drains
Common Amenities For Existing &Amp; Future Development
Street Lighting
Common Amenities For Existing &Amp; Future Development
Treatment And Disposal Of Sewage And Sullage Water
Common Amenities For Existing &Amp; Future Development
Water Conservation, Rain water Harvesting
Common Amenities For Existing &Amp; Future Development
Water Supply
Common Amenities For Existing &Amp; Future Development
Buildings / Wings in Ten X Habitat Raymond Realty | Tower A & B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ten X Habitat Raymond Realty | Tower A & B by Raymond Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

25491 Sq. ft.

Project Area

4508 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

638 apartments in total
Total
638
Booked
608
Available
30

Saleable Area Statistics (Sq. ft.)

345243 Total
Total
345243
Booked
328096
Available
17147
Total 638 apartments in project. 608 apartments booked. 95% apartments booked.
Total 345243 Sq.ft. saleable area. 328096 saleable area booked.
95% area booked.

Tower A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower AMar 202443101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.63 Sq.mts. ( 502 Sq.ft. )124
121 Booked97% Booked
97% Booked
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )69
66 Booked95% Booked
95% Booked
2 BHK57.08 Sq.mts. ( 614 Sq.ft. )80
80 Booked100% Booked
100% Booked
2 BHK57.68 Sq.mts. ( 621 Sq.ft. )45
42 Booked93% Booked
93% Booked
318 total apartments / 309 apartments booked. 97% apartments booked.
Work Description in Building Tower ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress97% done
97% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress97% done
97% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Tower B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Tower BMar 202443101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
2 BHK46.63 Sq.mts. ( 502 Sq.ft. )152
152 Booked100% Booked
100% Booked
2 BHK47.25 Sq.mts. ( 509 Sq.ft. )84
77 Booked91% Booked
91% Booked
2 BHK57.08 Sq.mts. ( 614 Sq.ft. )54
54 Booked100% Booked
100% Booked
2 BHK57.68 Sq.mts. ( 621 Sq.ft. )30
16 Booked53% Booked
53% Booked
320 total apartments / 299 apartments booked. 93% apartments booked.
Work Description in Building Tower BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress96% done
96% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress40% done
40% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress40% done
40% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress95% done
95% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress96% done
96% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Raymond Limited
for Project
Ten X Habitat Raymond Realty | Tower A & B
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation