Project overview

Ten Bkc is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800004889. Ten Bkc is located at 649, 649/1 To 649/48. This is a Ongoing being developed by Mig (Bandra) Realtors & Builders Private Limited.

Ten Bkc has W9 X01 2BHK T1, W9 X01 2BHK T2, W9 X01 2BHK T3, W9 X01 2BHK T4, W9 X01 2BHK T5, W9 X02 3BHK T1, W9 X02 3BHK T2, W9 X02 3BHK T3, W9 X03 1BHK T1, W9 X03 2BHK T6, W9 X04 3BHK T10, W9 X04 3BHK T11, W9 X04 3BHK T12, W9 X04 3BHK T13, W9 X04 3BHK T4, W9 X04 3BHK T5, W9 X04 3BHK T6, W9 X04 3BHK T7, W9 X04 3BHK T8, W9 X04 3BHK T9, W9 X04 5BHK DUP T1 & W9 X04 5BHK DUP T2 Apartments with carpet areas ranging from 1098 to 807 Sq.ft. Carpet. The Project has total 728 of which 249 are currently available for sale.

Ten Bkc is being developed on a total land area of 216888 Sq.ft. out of which 45662 Sq.ft. i.e 21% is reserved for recreational purposes. Ten Bkc has 15 Wings / Towers Wing 1,Wing 10,Wing 11,Wing 12,Wing 13,Wing 14,Wing 15,Wing 2,Wing 3,Wing 4,Wing 5,Wing 6,Wing 7,Wing 8,Wing 9

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Ten Bkc
  • Location:
  • 649, 649/1 To 649/48
  • Const. Stage:
    Ongoing
  • Possession:
    06 Jun 2023
Developer Details

  • Developer:
    Mig (Bandra) Realtors & Builders Private Limited
  • Phone:
  • Address:
  • Resham Bhavan
Project RERA Details
MAHA REARA No: P51800004889
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Space Age Consultants
Funding Bank HDFC BANK
Proposed Possession 06 Jun 2023
Revised Possession 06 Jun 2023
Extended Possession 05 Jun 2025
Litigations No Litigations
Last Modified 24 Jul 2024
Last Retrived 26 Jul 2025
Ten Bkc QR Code
Ten Bkc
MahaRERA - P51800004889
Apartment Details & Configuration
TypeArea
W1 X01 3 BHK T4132.77 Sq.mts. ( 1429 Sq.ft. )
W1 X01 3BHK T1132.42 Sq.mts. ( 1425 Sq.ft. )
W1 X01 3BHK T2132.61 Sq.mts. ( 1427 Sq.ft. )
W1 X01 3BHK T3132.76 Sq.mts. ( 1429 Sq.ft. )
W1 X01 3BHK T5132.82 Sq.mts. ( 1430 Sq.ft. )
W1 X01 4BHK T1152 Sq.mts. ( 1636 Sq.ft. )
W1 X02 4BHK T2207.91 Sq.mts. ( 2238 Sq.ft. )
W1 X02 4BHK T3207.98 Sq.mts. ( 2239 Sq.ft. )
W1 X02 4BHK T4208.04 Sq.mts. ( 2239 Sq.ft. )
W1 X02 4BHK T5340.97 Sq.mts. ( 3670 Sq.ft. )
W1 X02 6BHK DUP T1328.47 Sq.mts. ( 3536 Sq.ft. )
W10 X01 2BHK T168.89 Sq.mts. ( 742 Sq.ft. )
W10 X01 2BHK T268.94 Sq.mts. ( 742 Sq.ft. )
W10 X02 3BHK T190.72 Sq.mts. ( 977 Sq.ft. )
W11 X01 3BHK T299.83 Sq.mts. ( 1075 Sq.ft. )
W11 X02 3BHK T191.54 Sq.mts. ( 985 Sq.ft. )
W11 X02 3BHK T5118.93 Sq.mts. ( 1280 Sq.ft. )
W11 X02 3BHK T6121.79 Sq.mts. ( 1311 Sq.ft. )
W11 X03 3BHK T4109.22 Sq.mts. ( 1176 Sq.ft. )
W11 XO3 3BHK T3109.12 Sq.mts. ( 1175 Sq.ft. )
W12 X01 3BHK T2102.14 Sq.mts. ( 1099 Sq.ft. )
W12 X01 3BHK T3109.92 Sq.mts. ( 1183 Sq.ft. )
W12 X01 3BHK T4132.53 Sq.mts. ( 1427 Sq.ft. )
W12 X02 3BHK T1102.09 Sq.mts. ( 1099 Sq.ft. )
W13 X01 3BHK D100.97 Sq.mts. ( 1087 Sq.ft. )
W13 X01 3BHK T1100.56 Sq.mts. ( 1082 Sq.ft. )
W13 X01 3BHK T3100.98 Sq.mts. ( 1087 Sq.ft. )
W13 X02 3BHK T4116.86 Sq.mts. ( 1258 Sq.ft. )
W13 X02 3BHK T5116.85 Sq.mts. ( 1258 Sq.ft. )
W13 X02 3BHK T6120.54 Sq.mts. ( 1297 Sq.ft. )
W14 X01 3BHK T4112.24 Sq.mts. ( 1208 Sq.ft. )
W14 X01 3BHK T5112.58 Sq.mts. ( 1212 Sq.ft. )
W14 X01 3BHK T6112.64 Sq.mts. ( 1212 Sq.ft. )
W14 X01 3BHK T7112.67 Sq.mts. ( 1213 Sq.ft. )
W14 X01 3BHK T8112.81 Sq.mts. ( 1214 Sq.ft. )
W14 X01 5BHK DUP T1112.63 Sq.mts. ( 1212 Sq.ft. )
W14 X02 3BHK T1111.87 Sq.mts. ( 1204 Sq.ft. )
W14 X02 3BHK T2111.89 Sq.mts. ( 1204 Sq.ft. )
W14 X02 3BHK T3111.98 Sq.mts. ( 1205 Sq.ft. )
W14 X02 4BHK DUP T1174.45 Sq.mts. ( 1878 Sq.ft. )
W14 X02 4BHK DUP T2175.24 Sq.mts. ( 1886 Sq.ft. )
W15 X01 3BHK T1109.74 Sq.mts. ( 1181 Sq.ft. )
W15 X01 3BHK T3109.86 Sq.mts. ( 1183 Sq.ft. )
W15 X01 3BHK T3110 Sq.mts. ( 1184 Sq.ft. )
W15 X02 3BHK T4134.69 Sq.mts. ( 1450 Sq.ft. )
W15 X02 3BHK T5134.74 Sq.mts. ( 1450 Sq.ft. )
W15 X02 3BHK T6134.83 Sq.mts. ( 1451 Sq.ft. )
W15 X02 3BHK T7134.99 Sq.mts. ( 1453 Sq.ft. )
W15 X02 4 BHK T1165.08 Sq.mts. ( 1777 Sq.ft. )
W2 X01 3 BHK DUP T1435.58 Sq.mts. ( 4689 Sq.ft. )
W2 X01 3BHK T3111.93 Sq.mts. ( 1205 Sq.ft. )
W2 X01 3BHK T5112.08 Sq.mts. ( 1206 Sq.ft. )
W2 X01 3BHK T6112.14 Sq.mts. ( 1207 Sq.ft. )
W2 X01 3BHK T7112.2 Sq.mts. ( 1208 Sq.ft. )
W2 X02 3BHK T1111.78 Sq.mts. ( 1203 Sq.ft. )
W2 X02 3BHK T4111.97 Sq.mts. ( 1205 Sq.ft. )
W2 X02 5BHK DUP T1192.39 Sq.mts. ( 2071 Sq.ft. )
W3 X01 3BHK T1109.03 Sq.mts. ( 1174 Sq.ft. )
W3 X01 3BHK T2109.11 Sq.mts. ( 1174 Sq.ft. )
W3 X01 3BHK T3109.19 Sq.mts. ( 1175 Sq.ft. )
W3 X02 4BHK T1193.25 Sq.mts. ( 2080 Sq.ft. )
W3 X02 4BHK T2194.46 Sq.mts. ( 2093 Sq.ft. )
W3 X02 4BHK T3215.2 Sq.mts. ( 2316 Sq.ft. )
W3 X02 5BHK DUP T1342.67 Sq.mts. ( 3689 Sq.ft. )
W3 X03 3BHK T4132.95 Sq.mts. ( 1431 Sq.ft. )
W3 X03 3BHK T5132.99 Sq.mts. ( 1432 Sq.ft. )
W3 X03 3BHK T6133.05 Sq.mts. ( 1432 Sq.ft. )
W3 X03 3BHK T7133.07 Sq.mts. ( 1432 Sq.ft. )
W3 X03 4 BHK DUP T1173.77 Sq.mts. ( 1870 Sq.ft. )
W4 X01 3BHK T1131.47 Sq.mts. ( 1415 Sq.ft. )
W4 X01 3BHK T2131.53 Sq.mts. ( 1416 Sq.ft. )
W4 X01 3BHK T3131.58 Sq.mts. ( 1416 Sq.ft. )
W4 X02 3BHK T4134.02 Sq.mts. ( 1443 Sq.ft. )
W4 X02 3BHK T5134.14 Sq.mts. ( 1444 Sq.ft. )
W4 X02 3BHK T6134.25 Sq.mts. ( 1445 Sq.ft. )
W4 X02 3BHK T7139.41 Sq.mts. ( 1501 Sq.ft. )
W4 X02 4BHK T1164.09 Sq.mts. ( 1766 Sq.ft. )
W5 X01 2 BHK T176.6 Sq.mts. ( 825 Sq.ft. )
W5 X01 2BHK T283.27 Sq.mts. ( 896 Sq.ft. )
W5 X01 2BHK T383.46 Sq.mts. ( 898 Sq.ft. )
W5 X01 4 BHK T1208.25 Sq.mts. ( 2242 Sq.ft. )
W5 X01 4 BHK T2213.71 Sq.mts. ( 2300 Sq.ft. )
W5 X01 4BHK DUP T1368.78 Sq.mts. ( 3970 Sq.ft. )
W5 X01 TRIPLEX 5 BHK563.73 Sq.mts. ( 6068 Sq.ft. )
W6 X02 3BHK T1108.33 Sq.mts. ( 1166 Sq.ft. )
W6 X02 3BHK T2108.42 Sq.mts. ( 1167 Sq.ft. )
W6 X02 3BHK T3108.51 Sq.mts. ( 1168 Sq.ft. )
W6 X02 3BHK T4121.34 Sq.mts. ( 1306 Sq.ft. )
W6 X02 4BHK T1154.66 Sq.mts. ( 1665 Sq.ft. )
W6 X02 4BHK T2154.82 Sq.mts. ( 1666 Sq.ft. )
W6 X02 4BHK T3155.02 Sq.mts. ( 1669 Sq.ft. )
W7 X02 4BHK T1191.19 Sq.mts. ( 2058 Sq.ft. )
W7 X02 4BHK T2196.16 Sq.mts. ( 2111 Sq.ft. )
W7 X02 4BHK T3196.26 Sq.mts. ( 2113 Sq.ft. )
W7 X02 4BHK T4196.35 Sq.mts. ( 2114 Sq.ft. )
W7 X02 4BHK T5196.51 Sq.mts. ( 2115 Sq.ft. )
W7 X03 2 BHK T185.42 Sq.mts. ( 919 Sq.ft. )
W7 X03 3 BHK T4124.91 Sq.mts. ( 1345 Sq.ft. )
W7 X03 3BHK T1124.5 Sq.mts. ( 1340 Sq.ft. )
W7 X03 3BHK T11136.21 Sq.mts. ( 1466 Sq.ft. )
W7 X03 3BHK T12136.49 Sq.mts. ( 1469 Sq.ft. )
W7 X03 3BHK T2124.69 Sq.mts. ( 1342 Sq.ft. )
W7 X03 3BHK T3124.83 Sq.mts. ( 1344 Sq.ft. )
W7 X03 3BHK T5129.04 Sq.mts. ( 1389 Sq.ft. )
W7 X03 4 BHK T6196.55 Sq.mts. ( 2116 Sq.ft. )
W7 X04 3BHK T10134.09 Sq.mts. ( 1443 Sq.ft. )
W7 X04 3BHK T6133.64 Sq.mts. ( 1439 Sq.ft. )
W7 X04 3BHK T8134.01 Sq.mts. ( 1442 Sq.ft. )
W7 X04 3BHK T9134.05 Sq.mts. ( 1443 Sq.ft. )
W7X04 3 BHK T7133.79 Sq.mts. ( 1440 Sq.ft. )
W8 X01 3BHK T1113.56 Sq.mts. ( 1222 Sq.ft. )
W8 X02 2BHK T289.18 Sq.mts. ( 960 Sq.ft. )
W8 X02 3BHK T4123.21 Sq.mts. ( 1326 Sq.ft. )
W8 X02 3BHK T5123.23 Sq.mts. ( 1326 Sq.ft. )
W8 X02 3BHK T6123.31 Sq.mts. ( 1327 Sq.ft. )
W8 X02 3BHK T7123.35 Sq.mts. ( 1328 Sq.ft. )
W8 X03 1BHK T157.53 Sq.mts. ( 619 Sq.ft. )
W8 X03 3 BHK DUP T2114.6 Sq.mts. ( 1234 Sq.ft. )
W8 X03 3BHK DUP T1112.96 Sq.mts. ( 1216 Sq.ft. )
W8 X03 3BHK DUP T4114.89 Sq.mts. ( 1237 Sq.ft. )
W8 X03 3BHK DUP T5115 Sq.mts. ( 1238 Sq.ft. )
W8 X03 3BHK DUP T6115.01 Sq.mts. ( 1238 Sq.ft. )
W8 X03 3BHK DUP T7115.03 Sq.mts. ( 1238 Sq.ft. )
W8 X03 3BHK DUP T8119.77 Sq.mts. ( 1289 Sq.ft. )
W8 X03 3BHK T3114.74 Sq.mts. ( 1235 Sq.ft. )
W8 X04 3BHK T2114.52 Sq.mts. ( 1233 Sq.ft. )
W8 X04 3BHK T3114.53 Sq.mts. ( 1233 Sq.ft. )
W8 X04 3BHK T4114.62 Sq.mts. ( 1234 Sq.ft. )
W9 X01 2BHK T168.76 Sq.mts. ( 740 Sq.ft. )
W9 X01 2BHK T268.77 Sq.mts. ( 740 Sq.ft. )
W9 X01 2BHK T368.78 Sq.mts. ( 740 Sq.ft. )
W9 X01 2BHK T468.79 Sq.mts. ( 740 Sq.ft. )
W9 X01 2BHK T568.93 Sq.mts. ( 742 Sq.ft. )
W9 X02 3BHK T1101.99 Sq.mts. ( 1098 Sq.ft. )
W9 X02 3BHK T2102.05 Sq.mts. ( 1098 Sq.ft. )
W9 X02 3BHK T3102.13 Sq.mts. ( 1099 Sq.ft. )
W9 X03 1BHK T156.19 Sq.mts. ( 605 Sq.ft. )
W9 X03 2BHK T675.01 Sq.mts. ( 807 Sq.ft. )
W9 X04 3BHK T10124.09 Sq.mts. ( 1336 Sq.ft. )
W9 X04 3BHK T11127.2 Sq.mts. ( 1369 Sq.ft. )
W9 X04 3BHK T12130.39 Sq.mts. ( 1404 Sq.ft. )
W9 X04 3BHK T13134.87 Sq.mts. ( 1452 Sq.ft. )
W9 X04 3BHK T4103.12 Sq.mts. ( 1110 Sq.ft. )
W9 X04 3BHK T5103.16 Sq.mts. ( 1110 Sq.ft. )
W9 X04 3BHK T6103.4 Sq.mts. ( 1113 Sq.ft. )
W9 X04 3BHK T7103.44 Sq.mts. ( 1113 Sq.ft. )
W9 X04 3BHK T9123.34 Sq.mts. ( 1328 Sq.ft. )
W9 X04 5BHK DUP T1238.39 Sq.mts. ( 2566 Sq.ft. )
W9 X04 5BHK DUP T2260.68 Sq.mts. ( 2806 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Ten Bkclast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Refer To Architects Certifcate
Clubhouse
Refer To Layout Approval
Community Building
Na
Community Buildings
Na
Convenience Centre
Na
Convenience Store
Refer To Architects Certifcate
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Refer To Architects Certifcate
Energy management90% completed
90% Complete
Na
Fire Protection And Fire Safety Requirements35% completed
35% Complete
Refer To Architects Certifcate
Fitness Centre75% completed
75% Complete
Refer To Architects Certifcate
Game Simulator
Refer To Architects Certifcate
Kids Play Area
Na
Kids Play Area with play Equipment
Refer To Architects Certifcate
Kids Pool
Na
Landscaping & Tree Planting30% completed
30% Complete
Refer To Architects Certifcate
Multipurpose Hall100% completed
95% Complete
Refer To Architects Certifcate
Open Parking
Na
Reflexology Path
Refer To Architects Certifcate
Salon and Spa
Refer To Architects Certifcate
Senior Citizen Area
Refer To Architects Certifcate
Sewerage (Chamber, Lines, Septic Tank , STP)30% completed
30% Complete
Refer To Architects Certifcate
Solid Waste Management And Disposal90% completed
90% Complete
Refer To Architects Certifcate
Squash Court100% completed
95% Complete
Refer To Architects Certifcate
Storm Water Drains30% completed
30% Complete
Refer To Architects Certifcate
Street Lighting
Refer To Architects Certifcate
Swimming Pool
Na
Swimming Pool including Kids Pool100% completed
95% Complete
Refer To Architects Certifcate
Tiered Landscape Gardens
Na
Treatment And Disposal Of Sewage And Sullage Water50% completed
50% Complete
Refer To Architects Certifcate
Walking Path
Refer To Architects Certifcate
Water Conservation, Rain water Harvesting50% completed
50% Complete
Refer To Architects Certifcate
Water Supply
Refer To Architects Certifcate
Welfare Centre
Na
Buildings / Wings in Ten Bkc
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Ten Bkc by Mig (Bandra) Realtors & Builders Private Limitedlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

216888 Sq. ft.

Project Area

45662 Sq. ft.

Recreational Open Space

Total 15

Wings / Towers in Project

Apartments Statistics

728 apartments in total
Total
728
Booked
479
Available
249

Saleable Area Statistics (Sq. ft.)

941349 Total
Total
941349
Booked
611524
Available
329825
Total 728 apartments in project. 479 apartments booked. 65% apartments booked.
Total 941349 Sq.ft. saleable area. 611524 saleable area booked.
65% area booked.

Wing 1

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 1May 2024221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W1 X01 3 BHK T4132.77 Sq.mts. ( 1429 Sq.ft. )5
1 Booked20% Booked
20% Booked
W1 X01 3BHK T1132.42 Sq.mts. ( 1425 Sq.ft. )6
None Booked0% Booked
0% Booked
W1 X01 3BHK T2132.61 Sq.mts. ( 1427 Sq.ft. )4
None Booked0% Booked
0% Booked
W1 X01 3BHK T3132.76 Sq.mts. ( 1429 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 X01 3BHK T5132.82 Sq.mts. ( 1430 Sq.ft. )4
None Booked0% Booked
0% Booked
W1 X01 4BHK T1152 Sq.mts. ( 1636 Sq.ft. )2
None Booked0% Booked
0% Booked
W1 X02 4BHK T2207.91 Sq.mts. ( 2238 Sq.ft. )10
3 Booked30% Booked
30% Booked
W1 X02 4BHK T3207.98 Sq.mts. ( 2239 Sq.ft. )1
1 Booked100% Booked
100% Booked
W1 X02 4BHK T4208.04 Sq.mts. ( 2239 Sq.ft. )7
3 Booked42% Booked
42% Booked
W1 X02 4BHK T5340.97 Sq.mts. ( 3670 Sq.ft. )1
None Booked0% Booked
0% Booked
W1 X02 6BHK DUP T1328.47 Sq.mts. ( 3536 Sq.ft. )1
None Booked0% Booked
0% Booked
42 total apartments / 8 apartments booked. 19% apartments booked.
Work Description in Building Wing 1Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress65% done
65% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress65% done
65% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 10

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 10May 2024221500037
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W10 X01 2BHK T168.89 Sq.mts. ( 742 Sq.ft. )12
11 Booked91% Booked
91% Booked
W10 X01 2BHK T268.94 Sq.mts. ( 742 Sq.ft. )5
5 Booked100% Booked
100% Booked
W10 X02 3BHK T190.72 Sq.mts. ( 977 Sq.ft. )22
14 Booked63% Booked
63% Booked
39 total apartments / 30 apartments booked. 76% apartments booked.
Work Description in Building Wing 10Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress58% done
58% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress76% done
76% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress76% done
76% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress58% done
58% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 11May 2024221500080
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W11 X01 3BHK T299.83 Sq.mts. ( 1075 Sq.ft. )22
13 Booked59% Booked
59% Booked
W11 X02 3BHK T191.54 Sq.mts. ( 985 Sq.ft. )20
8 Booked40% Booked
40% Booked
W11 X02 3BHK T5118.93 Sq.mts. ( 1280 Sq.ft. )1
1 Booked100% Booked
100% Booked
W11 X02 3BHK T6121.79 Sq.mts. ( 1311 Sq.ft. )1
1 Booked100% Booked
100% Booked
W11 X03 3BHK T4109.22 Sq.mts. ( 1176 Sq.ft. )15
10 Booked66% Booked
66% Booked
W11 XO3 3BHK T3109.12 Sq.mts. ( 1175 Sq.ft. )5
4 Booked80% Booked
80% Booked
64 total apartments / 37 apartments booked. 57% apartments booked.
Work Description in Building Wing 11Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress63% done
63% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress63% done
63% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 12May 2024221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W12 X01 3BHK T2102.14 Sq.mts. ( 1099 Sq.ft. )20
9 Booked45% Booked
45% Booked
W12 X01 3BHK T3109.92 Sq.mts. ( 1183 Sq.ft. )1
None Booked0% Booked
0% Booked
W12 X01 3BHK T4132.53 Sq.mts. ( 1427 Sq.ft. )1
None Booked0% Booked
0% Booked
W12 X02 3BHK T1102.09 Sq.mts. ( 1099 Sq.ft. )20
9 Booked45% Booked
45% Booked
42 total apartments / 18 apartments booked. 42% apartments booked.
Work Description in Building Wing 12Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress65% done
65% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress72% done
72% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress65% done
65% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 13May 2024221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W13 X01 3BHK D100.97 Sq.mts. ( 1087 Sq.ft. )4
2 Booked50% Booked
50% Booked
W13 X01 3BHK T1100.56 Sq.mts. ( 1082 Sq.ft. )3
1 Booked33% Booked
33% Booked
W13 X01 3BHK T3100.98 Sq.mts. ( 1087 Sq.ft. )13
10 Booked76% Booked
76% Booked
W13 X02 3BHK T4116.86 Sq.mts. ( 1258 Sq.ft. )14
13 Booked92% Booked
92% Booked
W13 X02 3BHK T5116.85 Sq.mts. ( 1258 Sq.ft. )7
7 Booked100% Booked
100% Booked
W13 X02 3BHK T6120.54 Sq.mts. ( 1297 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 34 apartments booked. 80% apartments booked.
Work Description in Building Wing 13Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress93% done
93% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress72% done
72% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress72% done
72% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress99% done
99% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress99% done
99% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress29% done
29% Booked
Sanitary Fittings within the flats / premises
work-in-progress29% done
29% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress93% done
93% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 14May 2024221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W14 X01 3BHK T4112.24 Sq.mts. ( 1208 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X01 3BHK T5112.58 Sq.mts. ( 1212 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X01 3BHK T6112.64 Sq.mts. ( 1212 Sq.ft. )10
8 Booked80% Booked
80% Booked
W14 X01 3BHK T7112.67 Sq.mts. ( 1213 Sq.ft. )8
8 Booked100% Booked
100% Booked
W14 X01 3BHK T8112.81 Sq.mts. ( 1214 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X01 5BHK DUP T1112.63 Sq.mts. ( 1212 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X02 3BHK T1111.87 Sq.mts. ( 1204 Sq.ft. )9
7 Booked77% Booked
77% Booked
W14 X02 3BHK T2111.89 Sq.mts. ( 1204 Sq.ft. )1
None Booked0% Booked
0% Booked
W14 X02 3BHK T3111.98 Sq.mts. ( 1205 Sq.ft. )6
6 Booked100% Booked
100% Booked
W14 X02 4BHK DUP T1174.45 Sq.mts. ( 1878 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X02 4BHK DUP T2175.24 Sq.mts. ( 1886 Sq.ft. )1
1 Booked100% Booked
100% Booked
W14 X02 5BHK DUP T1112.63 Sq.mts. ( 1212 Sq.ft. )2
2 Booked100% Booked
100% Booked
42 total apartments / 37 apartments booked. 88% apartments booked.
Work Description in Building Wing 14Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress69% done
69% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress69% done
69% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 15

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 15Jun 2022221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W15 X01 3BHK T1109.74 Sq.mts. ( 1181 Sq.ft. )11
8 Booked72% Booked
72% Booked
W15 X01 3BHK T3109.86 Sq.mts. ( 1183 Sq.ft. )5
4 Booked80% Booked
80% Booked
W15 X01 3BHK T3110 Sq.mts. ( 1184 Sq.ft. )4
4 Booked100% Booked
100% Booked
W15 X02 3BHK T4134.69 Sq.mts. ( 1450 Sq.ft. )1
1 Booked100% Booked
100% Booked
W15 X02 3BHK T5134.74 Sq.mts. ( 1450 Sq.ft. )11
9 Booked81% Booked
81% Booked
W15 X02 3BHK T6134.83 Sq.mts. ( 1451 Sq.ft. )5
4 Booked80% Booked
80% Booked
W15 X02 3BHK T7134.99 Sq.mts. ( 1453 Sq.ft. )4
3 Booked75% Booked
75% Booked
W15 X02 4 BHK T1165.08 Sq.mts. ( 1777 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 34 apartments booked. 80% apartments booked.
Work Description in Building Wing 15Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress50% done
50% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress59% done
59% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress50% done
50% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 2

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 2May 2024221500050
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W2 X01 3 BHK DUP T1435.58 Sq.mts. ( 4689 Sq.ft. )1
1 Booked100% Booked
100% Booked
W2 X01 3BHK T3111.93 Sq.mts. ( 1205 Sq.ft. )5
None Booked0% Booked
0% Booked
W2 X01 3BHK T5112.08 Sq.mts. ( 1206 Sq.ft. )6
None Booked0% Booked
0% Booked
W2 X01 3BHK T6112.14 Sq.mts. ( 1207 Sq.ft. )5
2 Booked40% Booked
40% Booked
W2 X01 3BHK T7112.2 Sq.mts. ( 1208 Sq.ft. )2
1 Booked50% Booked
50% Booked
W2 X02 3BHK T1111.78 Sq.mts. ( 1203 Sq.ft. )12
None Booked0% Booked
0% Booked
W2 X02 3BHK T2111.87 Sq.mts. ( 1204 Sq.ft. )4
3 Booked75% Booked
75% Booked
W2 X02 3BHK T4111.97 Sq.mts. ( 1205 Sq.ft. )2
1 Booked50% Booked
50% Booked
W2 X02 5BHK DUP T1192.39 Sq.mts. ( 2071 Sq.ft. )1
None Booked0% Booked
0% Booked
38 total apartments / 8 apartments booked. 21% apartments booked.
Work Description in Building Wing 2Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress45% done
45% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress58% done
58% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress58% done
58% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress45% done
45% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 3

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 3May 2024221500079
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W3 X01 3BHK T1109.03 Sq.mts. ( 1174 Sq.ft. )12
W3 X01 3BHK T2109.11 Sq.mts. ( 1174 Sq.ft. )6
4 Booked66% Booked
66% Booked
W3 X01 3BHK T3109.19 Sq.mts. ( 1175 Sq.ft. )4
3 Booked75% Booked
75% Booked
W3 X02 4BHK T1193.25 Sq.mts. ( 2080 Sq.ft. )12
7 Booked58% Booked
58% Booked
W3 X02 4BHK T2194.46 Sq.mts. ( 2093 Sq.ft. )1
1 Booked100% Booked
100% Booked
W3 X02 4BHK T3215.2 Sq.mts. ( 2316 Sq.ft. )1
1 Booked100% Booked
100% Booked
W3 X02 5BHK DUP T1342.67 Sq.mts. ( 3689 Sq.ft. )4
3 Booked75% Booked
75% Booked
W3 X03 3BHK T4132.95 Sq.mts. ( 1431 Sq.ft. )5
None Booked0% Booked
0% Booked
W3 X03 3BHK T5132.99 Sq.mts. ( 1432 Sq.ft. )10
4 Booked40% Booked
40% Booked
W3 X03 3BHK T6133.05 Sq.mts. ( 1432 Sq.ft. )3
None Booked0% Booked
0% Booked
W3 X03 3BHK T7133.07 Sq.mts. ( 1432 Sq.ft. )1
None Booked0% Booked
0% Booked
W3 X03 4 BHK DUP T1173.77 Sq.mts. ( 1870 Sq.ft. )1
1 Booked100% Booked
100% Booked
60 total apartments / 26 apartments booked. 43% apartments booked.
Work Description in Building Wing 3Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress38% done
38% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress43% done
43% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress43% done
43% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress38% done
38% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 4

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 4May 2024221500055
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W4 X01 3BHK T1131.47 Sq.mts. ( 1415 Sq.ft. )11
6 Booked54% Booked
54% Booked
W4 X01 3BHK T2131.53 Sq.mts. ( 1416 Sq.ft. )5
None Booked0% Booked
0% Booked
W4 X01 3BHK T3131.58 Sq.mts. ( 1416 Sq.ft. )4
1 Booked25% Booked
25% Booked
W4 X02 3BHK T4134.02 Sq.mts. ( 1443 Sq.ft. )11
5 Booked45% Booked
45% Booked
W4 X02 3BHK T5134.14 Sq.mts. ( 1444 Sq.ft. )5
None Booked0% Booked
0% Booked
W4 X02 3BHK T6134.25 Sq.mts. ( 1445 Sq.ft. )4
1 Booked25% Booked
25% Booked
W4 X02 3BHK T7139.41 Sq.mts. ( 1501 Sq.ft. )1
None Booked0% Booked
0% Booked
W4 X02 4BHK T1164.09 Sq.mts. ( 1766 Sq.ft. )1
1 Booked100% Booked
100% Booked
42 total apartments / 14 apartments booked. 33% apartments booked.
Work Description in Building Wing 4Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress38% done
38% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress56% done
56% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress56% done
56% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress38% done
38% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 5

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 5May 2024291500030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W5 X01 2 BHK T176.6 Sq.mts. ( 825 Sq.ft. )3
3 Booked100% Booked
100% Booked
W5 X01 2BHK T283.27 Sq.mts. ( 896 Sq.ft. )15
15 Booked100% Booked
100% Booked
W5 X01 2BHK T383.46 Sq.mts. ( 898 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 X01 4 BHK T1208.25 Sq.mts. ( 2242 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 X01 4 BHK T2213.71 Sq.mts. ( 2300 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 X01 4BHK DUP T1368.78 Sq.mts. ( 3970 Sq.ft. )1
1 Booked100% Booked
100% Booked
W5 X01 TRIPLEX 5 BHK563.73 Sq.mts. ( 6068 Sq.ft. )1
1 Booked100% Booked
100% Booked
23 total apartments / 23 apartments booked. 100% apartments booked.
Work Description in Building Wing 5Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress94% done
94% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress81% done
81% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress81% done
81% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress72% done
72% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress94% done
94% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 6

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 6May 2024291500030
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W6 X02 3BHK T1108.33 Sq.mts. ( 1166 Sq.ft. )1
1 Booked100% Booked
100% Booked
W6 X02 3BHK T2108.42 Sq.mts. ( 1167 Sq.ft. )1
1 Booked100% Booked
100% Booked
W6 X02 3BHK T3108.51 Sq.mts. ( 1168 Sq.ft. )1
1 Booked100% Booked
100% Booked
W6 X02 3BHK T4121.34 Sq.mts. ( 1306 Sq.ft. )1
None Booked0% Booked
0% Booked
W6 X02 4BHK T1154.66 Sq.mts. ( 1665 Sq.ft. )5
4 Booked80% Booked
80% Booked
W6 X02 4BHK T2154.82 Sq.mts. ( 1666 Sq.ft. )7
7 Booked100% Booked
100% Booked
W6 X02 4BHK T3155.02 Sq.mts. ( 1669 Sq.ft. )6
6 Booked100% Booked
100% Booked
22 total apartments / 20 apartments booked. 90% apartments booked.
Work Description in Building Wing 6Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress88% done
88% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress81% done
81% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress81% done
81% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress40% done
40% Booked
Sanitary Fittings within the flats / premises
work-in-progress40% done
40% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress88% done
88% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 7

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 7May 2024291500076
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W7 X02 4BHK T1191.19 Sq.mts. ( 2058 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 X02 4BHK T2196.16 Sq.mts. ( 2111 Sq.ft. )4
3 Booked75% Booked
75% Booked
W7 X02 4BHK T3196.26 Sq.mts. ( 2113 Sq.ft. )5
5 Booked100% Booked
100% Booked
W7 X02 4BHK T4196.35 Sq.mts. ( 2114 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 X02 4BHK T5196.51 Sq.mts. ( 2115 Sq.ft. )3
3 Booked100% Booked
100% Booked
W7 X03 2 BHK T185.42 Sq.mts. ( 919 Sq.ft. )1
None Booked0% Booked
0% Booked
W7 X03 3 BHK T4124.91 Sq.mts. ( 1345 Sq.ft. )5
5 Booked100% Booked
100% Booked
W7 X03 3BHK T1124.5 Sq.mts. ( 1340 Sq.ft. )4
3 Booked75% Booked
75% Booked
W7 X03 3BHK T11136.21 Sq.mts. ( 1466 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 X03 3BHK T12136.49 Sq.mts. ( 1469 Sq.ft. )2
2 Booked100% Booked
100% Booked
W7 X03 3BHK T2124.69 Sq.mts. ( 1342 Sq.ft. )8
6 Booked75% Booked
75% Booked
W7 X03 3BHK T3124.83 Sq.mts. ( 1344 Sq.ft. )7
7 Booked100% Booked
100% Booked
W7 X03 3BHK T5129.04 Sq.mts. ( 1389 Sq.ft. )1
None Booked0% Booked
0% Booked
W7 X03 4 BHK T6196.55 Sq.mts. ( 2116 Sq.ft. )3
3 Booked100% Booked
100% Booked
W7 X04 3BHK T10134.09 Sq.mts. ( 1443 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7 X04 3BHK T6133.64 Sq.mts. ( 1439 Sq.ft. )4
4 Booked100% Booked
100% Booked
W7 X04 3BHK T8134.01 Sq.mts. ( 1442 Sq.ft. )2
2 Booked100% Booked
100% Booked
W7 X04 3BHK T9134.05 Sq.mts. ( 1443 Sq.ft. )1
1 Booked100% Booked
100% Booked
W7X04 3 BHK T7133.79 Sq.mts. ( 1440 Sq.ft. )6
6 Booked100% Booked
100% Booked
60 total apartments / 54 apartments booked. 90% apartments booked.
Work Description in Building Wing 7Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress79% done
79% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress89% done
89% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress89% done
89% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress94% done
94% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress94% done
94% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress27% done
27% Booked
Sanitary Fittings within the flats / premises
work-in-progress27% done
27% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress79% done
79% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 8

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 8May 2024291500082
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W8 X01 3BHK T1113.56 Sq.mts. ( 1222 Sq.ft. )2
2 Booked100% Booked
100% Booked
W8 X02 2BHK T289.18 Sq.mts. ( 960 Sq.ft. )1
None Booked0% Booked
0% Booked
W8 X02 3BHK T4123.21 Sq.mts. ( 1326 Sq.ft. )3
2 Booked66% Booked
66% Booked
W8 X02 3BHK T5123.23 Sq.mts. ( 1326 Sq.ft. )2
2 Booked100% Booked
100% Booked
W8 X02 3BHK T6123.31 Sq.mts. ( 1327 Sq.ft. )14
8 Booked57% Booked
57% Booked
W8 X02 3BHK T7123.35 Sq.mts. ( 1328 Sq.ft. )6
6 Booked100% Booked
100% Booked
W8 X03 1BHK T157.53 Sq.mts. ( 619 Sq.ft. )1
None Booked0% Booked
0% Booked
W8 X03 3 BHK DUP T2114.6 Sq.mts. ( 1234 Sq.ft. )2
1 Booked50% Booked
50% Booked
W8 X03 3BHK DUP T1112.96 Sq.mts. ( 1216 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 X03 3BHK DUP T4114.89 Sq.mts. ( 1237 Sq.ft. )3
3 Booked100% Booked
100% Booked
W8 X03 3BHK DUP T5115 Sq.mts. ( 1238 Sq.ft. )3
3 Booked100% Booked
100% Booked
W8 X03 3BHK DUP T6115.01 Sq.mts. ( 1238 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 X03 3BHK DUP T7115.03 Sq.mts. ( 1238 Sq.ft. )2
2 Booked100% Booked
100% Booked
W8 X03 3BHK DUP T8119.77 Sq.mts. ( 1289 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 X03 3BHK T3114.74 Sq.mts. ( 1235 Sq.ft. )1
1 Booked100% Booked
100% Booked
W8 X04 3BHK T2114.52 Sq.mts. ( 1233 Sq.ft. )9
8 Booked88% Booked
88% Booked
W8 X04 3BHK T3114.53 Sq.mts. ( 1233 Sq.ft. )4
4 Booked100% Booked
100% Booked
W8 X04 3BHK T4114.62 Sq.mts. ( 1234 Sq.ft. )7
5 Booked71% Booked
71% Booked
63 total apartments / 50 apartments booked. 79% apartments booked.
Work Description in Building Wing 8Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress75% done
75% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress89% done
89% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress89% done
89% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress98% done
98% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress98% done
98% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress23% done
23% Booked
Sanitary Fittings within the flats / premises
work-in-progress23% done
23% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress75% done
75% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing 9

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing 9May 20242915000121
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
W9 X01 2BHK T168.76 Sq.mts. ( 740 Sq.ft. )12
11 Booked91% Booked
91% Booked
W9 X01 2BHK T268.77 Sq.mts. ( 740 Sq.ft. )5
5 Booked100% Booked
100% Booked
W9 X01 2BHK T368.78 Sq.mts. ( 740 Sq.ft. )3
3 Booked100% Booked
100% Booked
W9 X01 2BHK T468.79 Sq.mts. ( 740 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X01 2BHK T568.93 Sq.mts. ( 742 Sq.ft. )7
7 Booked100% Booked
100% Booked
W9 X02 3BHK T1101.99 Sq.mts. ( 1098 Sq.ft. )2
2 Booked100% Booked
100% Booked
W9 X02 3BHK T2102.05 Sq.mts. ( 1098 Sq.ft. )10
10 Booked100% Booked
100% Booked
W9 X02 3BHK T3102.13 Sq.mts. ( 1099 Sq.ft. )13
10 Booked76% Booked
76% Booked
W9 X03 1BHK T156.19 Sq.mts. ( 605 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 X03 2BHK T675.01 Sq.mts. ( 807 Sq.ft. )27
22 Booked81% Booked
81% Booked
W9 X04 3BHK T10124.09 Sq.mts. ( 1336 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X04 3BHK T11127.2 Sq.mts. ( 1369 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X04 3BHK T12130.39 Sq.mts. ( 1404 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 X04 3BHK T13134.87 Sq.mts. ( 1452 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X04 3BHK T4103.12 Sq.mts. ( 1110 Sq.ft. )1
None Booked0% Booked
0% Booked
W9 X04 3BHK T5103.16 Sq.mts. ( 1110 Sq.ft. )4
2 Booked50% Booked
50% Booked
W9 X04 3BHK T6103.4 Sq.mts. ( 1113 Sq.ft. )7
3 Booked42% Booked
42% Booked
W9 X04 3BHK T7103.44 Sq.mts. ( 1113 Sq.ft. )5
4 Booked80% Booked
80% Booked
W9 X04 3BHK T8123.31 Sq.mts. ( 1327 Sq.ft. )2
1 Booked50% Booked
50% Booked
W9 X04 3BHK T9123.34 Sq.mts. ( 1328 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X04 5BHK DUP T1238.39 Sq.mts. ( 2566 Sq.ft. )1
1 Booked100% Booked
100% Booked
W9 X04 5BHK DUP T2260.68 Sq.mts. ( 2806 Sq.ft. )1
None Booked0% Booked
0% Booked
107 total apartments / 86 apartments booked. 80% apartments booked.
Work Description in Building Wing 9Completion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress63% done
63% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
work-in-progress28% done
28% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress28% done
28% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress71% done
71% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress71% done
71% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress63% done
63% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Mig (Bandra) Realtors & Builders Private Limited
for Project
Ten Bkc
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation