Project overview

Taramati Tower Wing A B C D is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000002960. Taramati Tower Wing A B C D is located at S No 77/2A/3. This is a Ongoing being developed by Vast Construction.

Taramati Tower Wing A B C D has A BHK Apartments with carpet areas ranging from 450 to 450 Sq.ft. Carpet. The Project has total 68 of which 28 are currently available for sale.

Taramati Tower Wing A B C D is being developed on a total land area of 45209 Sq.ft. out of which 5382 Sq.ft. i.e 12% is reserved for recreational purposes. Taramati Tower Wing A B C D has 6 Wings / Towers D Wing,Wing A,Wing B,Wing C,Wing I,Wing J

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Taramati Tower Wing A B C D
  • Location:
  • S No 77/2A/3
  • Const. Stage:
    Ongoing
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Vast Construction
  • Phone:
  • Address:
  • Ashirwad Building
Project RERA Details
MAHA REARA No: P52000002960
Project Type Residential / Group Housing
RERA Project Status Ongoing
Architect Ajit Shanilal Shah
Funding Bank BANK OF MAHARASHTRA
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 04 Aug 2017
Last Retrived 28 Jul 2025
Taramati Tower Wing A B C D QR Code
Taramati Tower Wing A B C D
MahaRERA - P52000002960
Apartment Details & Configuration
TypeArea
1 BHK41.775 Sq.mts. ( 450 Sq.ft. )
1 RK29.96 Sq.mts. ( 322 Sq.ft. )
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )
1 BHK36.25 Sq.mts. ( 390 Sq.ft. )
1 BHK47.3 Sq.mts. ( 509 Sq.ft. )
3 BHK77.28 Sq.mts. ( 832 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Taramati Tower Wing A B C Dlast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space75% completed
75% Complete
Under Progress
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station90% completed
90% Complete
Under Progress
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting75% completed
75% Complete
Under Progress
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)100% completed
95% Complete
Na
Solid Waste Management And Disposal
Na
Storm Water Drains
Na
Street Lighting90% completed
90% Complete
Under Progress
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Na
Water Supply100% completed
95% Complete
Na
Buildings / Wings in Taramati Tower Wing A B C D
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Taramati Tower Wing A B C D by Vast Constructionlast updated on 28 Jul 2025 as per information obtained from MARA RERA.

45209 Sq. ft.

Project Area

5382 Sq. ft.

Recreational Open Space

Total 6

Wings / Towers in Project

Apartments Statistics

68 apartments in total
Total
68
Booked
40
Available
28

Saleable Area Statistics (Sq. ft.)

30578 Total
Total
30578
Booked
17733
Available
12845
Total 68 apartments in project. 40 apartments booked. 58% apartments booked.
Total 30578 Sq.ft. saleable area. 17733 saleable area booked.
58% area booked.

D Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D WingDec 20194101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.775 Sq.mts. ( 450 Sq.ft. )8
6 Booked75% Booked
75% Booked
1 RK29.96 Sq.mts. ( 322 Sq.ft. )2
2 Booked100% Booked
100% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )2
2 Booked100% Booked
100% Booked
12 total apartments / 10 apartments booked. 83% apartments booked.
Work Description in Building D WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing A

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing ADec 20194101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK36.25 Sq.mts. ( 390 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 BHK41.775 Sq.mts. ( 450 Sq.ft. )8
7 Booked87% Booked
87% Booked
1 BHK47.3 Sq.mts. ( 509 Sq.ft. )1
1 Booked100% Booked
100% Booked
1 RK29.96 Sq.mts. ( 322 Sq.ft. )1
1 Booked100% Booked
100% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )1
1 Booked100% Booked
100% Booked
12 total apartments / 11 apartments booked. 91% apartments booked.
Work Description in Building Wing ACompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BDec 20194101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.775 Sq.mts. ( 450 Sq.ft. )4
3 Booked75% Booked
75% Booked
1 RK29.96 Sq.mts. ( 322 Sq.ft. )5
4 Booked80% Booked
80% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )3
2 Booked66% Booked
66% Booked
12 total apartments / 9 apartments booked. 75% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing C

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing CDec 20194101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK29.96 Sq.mts. ( 322 Sq.ft. )6
6 Booked100% Booked
100% Booked
2 BHK53.59 Sq.mts. ( 577 Sq.ft. )5
3 Booked60% Booked
60% Booked
3 BHK77.28 Sq.mts. ( 832 Sq.ft. )1
1 Booked100% Booked
100% Booked
12 total apartments / 10 apartments booked. 83% apartments booked.
Work Description in Building Wing CCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress95% done
95% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
work-in-progress95% done
95% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress95% done
95% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
work-in-progress95% done
95% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress95% done
95% Booked
Stilt Floor
Completed 100% done
100% Booked

Wing I

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing IJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK41.775 Sq.mts. ( 450 Sq.ft. )10
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing ICompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor

Wing J

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing JJan 19005101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
A BHK41.775 Sq.mts. ( 450 Sq.ft. )10
None Booked0% Booked
0% Booked
10 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing JCompletion
Basement (if any)
Excavation
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Stilt Floor
Channel Partners
Channel Partners Registered by Developer
Vast Construction
for Project
Taramati Tower Wing A B C D
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation