Project overview

Tansa City One is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700011576. Tansa City One is located at Thane, 421601. This is a On-Going Project being developed by Kavya Buildcon Pvt. Ltd..

Tansa City One has 1 RK Apartments with carpet areas ranging from 258 to 287 Sq.ft. Carpet. The Project has total 320 of which 320 are currently available for sale.

Tansa City One is being developed on a total land area of 205029 Sq.ft. Tansa City One has 8 Wings / Towers Building Number 11,Building Number 12,Building Number 13,Building Number 14,Building Number 16,Building Number 17,Building Number 18,Building Number 19

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tansa City One
  • Location:
  • Thane, 421601
  • Const. Stage:
    On-Going Project
  • Possession:
    31 Dec 2019
Developer Details

  • Developer:
    Kavya Buildcon Pvt. Ltd.
  • Phone:
  • Address:
  • 99-C 2Nd Floor, Kavya Aura, Behind Rosewood Hotel, Sitaram Ghidgaonkar Marg, Rosewood Hotel, Tulsiwadi, 400034
Project RERA Details
MAHA REARA No: P51700011576
Project Type Residential
RERA Project Status On-Going Project
Funding Bank YES BANK
Proposed Possession 31 Dec 2019
Revised Possession 31 Dec 2019
Extended Possession
Litigations No Litigations
Last Modified 21 Jul 2021
Last Retrived 28 Jul 2025
Tansa City One QR Code
Tansa City One
MahaRERA - P51700011576
Apartment Details & Configuration
TypeArea
1 RK23.99 Sq.mts. ( 258 Sq.ft. )
1 RK26.63 Sq.mts. ( 287 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tansa City Onelast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Only Electric Meter To Be Provided
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
To Be Completed Before Oc
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank Will Be Provided .
Solid Waste Management And Disposal
Na
Storm Water Drains
Under Construction
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Only Rain Water Harvesting Will Be Provided
Water Supply
To Be Completed Before Oc
Buildings / Wings in Tansa City One
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tansa City One by Kavya Buildcon Pvt. Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.

205029 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 8

Wings / Towers in Project

Apartments Statistics

320 apartments in total
Total
320
Booked
0
Available
320

Saleable Area Statistics (Sq. ft.)

89908 Total
Total
89908
Booked
0
Available
89908
Total 320 apartments in project. 0 apartments booked. 0% apartments booked.
Total 89908 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building Number 11

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 11Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 11Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 12

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 12Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 12Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 13

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 13Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 13Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 14

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 14Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 14Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 16

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 16Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 16Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 17

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 17Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 17Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 18

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 18Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 18Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building Number 19

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building Number 19Dec 20195100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 RK23.99 Sq.mts. ( 258 Sq.ft. )8
None Booked0% Booked
0% Booked
1 RK26.63 Sq.mts. ( 287 Sq.ft. )32
None Booked0% Booked
0% Booked
40 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building Number 19Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Kavya Buildcon Pvt. Ltd.
for Project
Tansa City One
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation