Project overview

Tansa City One Phase 1 B is a MahaRERA Registered Project bearing MahaRERA Registration Number P51700018999. Tansa City One Phase 1 B is located at 421301, Thane. This is a New Project being developed by Kavya Buildcon Pvt. Ltd..

Tansa City One Phase 1 B has 1 BHK Apartments with carpet areas ranging from 331 to 387 Sq.ft. Carpet. The Project has total 180 of which 180 are currently available for sale.

Tansa City One Phase 1 B is being developed on a total land area of 145305 Sq.ft. Tansa City One Phase 1 B has 9 Wings / Towers Building No 20,Building No 21,Building No 22,Building No 23,Building No 24,Building No 25,Building No 26,Building No 27,Building No 28

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tansa City One Phase 1 B
  • Location:
  • 421301, Thane
  • Const. Stage:
    New Project
  • Possession:
    30 Dec 2022
Developer Details

  • Developer:
    Kavya Buildcon Pvt. Ltd.
  • Phone:
  • Address:
  • 99-C 2Nd Floor, Kavya Aura, Behind Rosewood Hotel, Sitaram Ghidgaonkar Marg, Rosewood Hotel, Tulsiwadi, 400034
Project RERA Details
MAHA REARA No: P51700018999
Project Type Residential
RERA Project Status New Project
Funding Bank YES BANK
Proposed Possession 30 Dec 2022
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 07 Jun 2019
Last Retrived 28 Jul 2025
Tansa City One Phase 1 B QR Code
Tansa City One Phase 1 B
MahaRERA - P51700018999
Apartment Details & Configuration
TypeArea
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tansa City One Phase 1 Blast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Yet To Start
Energy management
Na
Fire Protection And Fire Safety Requirements
Yet To Start
Landscaping & Tree Planting
Na
Open Parking
Yet To Start
Sewerage (Chamber, Lines, Septic Tank , STP)
To Be Completed Before Oc
Solid Waste Management And Disposal
Na
Storm Water Drains
Yet To Start
Street Lighting
Yet To Start
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
To Be Completed Before Oc
Buildings / Wings in Tansa City One Phase 1 B
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tansa City One Phase 1 B by Kavya Buildcon Pvt. Ltd.last updated on 28 Jul 2025 as per information obtained from MARA RERA.

145305 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 9

Wings / Towers in Project

Apartments Statistics

180 apartments in total
Total
180
Booked
0
Available
180

Saleable Area Statistics (Sq. ft.)

67596 Total
Total
67596
Booked
0
Available
67596
Total 180 apartments in project. 0 apartments booked. 0% apartments booked.
Total 67596 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Building No 20

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 20Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 20Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 21

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 21Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 21Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 22

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 22Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 22Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 23

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 23Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 23Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 24

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 24Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 24Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 25

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 25Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 25Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 26

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 26Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 26Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 27

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 27Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 27Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure

Building No 28

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Building No 28Dec 20215100000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK30.76 Sq.mts. ( 331 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK35.92 Sq.mts. ( 387 Sq.ft. )16
None Booked0% Booked
0% Booked
20 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Building No 28Completion
Excavation
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Overall Percentage of Completion of the work done For the entire Building /Wing
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Stilt Floor
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
X number of Podiums
X number of Slabs of Super Structure
Channel Partners
Channel Partners Registered by Developer
Kavya Buildcon Pvt. Ltd.
for Project
Tansa City One Phase 1 B
last updated on 28 Jul 2025 as per information obtained from MARA RERA.