Project overview

Tanishq Wisteria is a MahaRERA Registered Project bearing MahaRERA Registration Number P51900006567. Tanishq Wisteria is located at 846. This is a Ongoing being developed by Aakaar Tanishq Nirmaan J. V..

Tanishq Wisteria has 1RK Apartments with carpet areas ranging from 351 to 351 Sq.ft. Carpet. The Project has total 28 of which 14 are currently available for sale.

Tanishq Wisteria is being developed on a total land area of 11988 Sq.ft. out of which 987 Sq.ft. i.e 8% is reserved for recreational purposes. Tanishq Wisteria has 2 Wings / Towers A Wing,Wing B

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Tanishq Wisteria
  • Location:
  • 846
  • Const. Stage:
    Ongoing
  • Possession:
    31 Aug 2019
Developer Details

  • Developer:
    Aakaar Tanishq Nirmaan J. V.
  • Phone:
  • Address:
  • Regal Industrial Estate
Project RERA Details
MAHA REARA No: P51900006567
Project Type Others
RERA Project Status Ongoing
Architect Yogesh Arote
Funding Bank
Proposed Possession 31 Aug 2019
Revised Possession 31 Aug 2019
Extended Possession 30 Sep 2022
Litigations No Litigations
Last Modified 09 Sep 2021
Last Retrived 26 Jul 2025
Tanishq Wisteria QR Code
Tanishq Wisteria
MahaRERA - P51900006567
Apartment Details & Configuration
TypeArea
1 BHK45.39 Sq.mts. ( 489 Sq.ft. )
1 BHK45.7 Sq.mts. ( 492 Sq.ft. )
2 BHK61.96 Sq.mts. ( 667 Sq.ft. )
1RK32.62 Sq.mts. ( 351 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Tanishq Wisterialast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station70% completed
70% Complete
Only Electric Metering And Substation
Energy management
Na
Fire Protection And Fire Safety Requirements50% completed
50% Complete
Yet To Start
Landscaping & Tree Planting
Only Tree Planting
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)50% completed
50% Complete
No Septic Tank And Stp
Solid Waste Management And Disposal
Na
Storm Water Drains50% completed
50% Complete
Yet To Start
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Yet To Start
Water Supply
Yet To Start
Buildings / Wings in Tanishq Wisteria
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Tanishq Wisteria by Aakaar Tanishq Nirmaan J. V.last updated on 26 Jul 2025 as per information obtained from MARA RERA.

11988 Sq. ft.

Project Area

987 Sq. ft.

Recreational Open Space

Total 2

Wings / Towers in Project

Apartments Statistics

28 apartments in total
Total
28
Booked
14
Available
14

Saleable Area Statistics (Sq. ft.)

15000 Total
Total
15000
Booked
7749
Available
7251
Total 28 apartments in project. 14 apartments booked. 50% apartments booked.
Total 15000 Sq.ft. saleable area. 7749 saleable area booked.
52% area booked.

A Wing

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A WingFeb 20217101000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK45.39 Sq.mts. ( 489 Sq.ft. )10
4 Booked40% Booked
40% Booked
1 BHK45.7 Sq.mts. ( 492 Sq.ft. )9
5 Booked55% Booked
55% Booked
2 BHK61.96 Sq.mts. ( 667 Sq.ft. )8
5 Booked62% Booked
62% Booked
27 total apartments / 14 apartments booked. 51% apartments booked.
Work Description in Building A WingCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Completed 100% done
100% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Completed 100% done
100% Booked
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Completed 100% done
100% Booked
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Completed 100% done
100% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress90% done
90% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Completed 100% done
100% Booked
Sanitary Fittings within the flats / premises
Completed 100% done
100% Booked
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
Completed 100% done
100% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
Completed 100% done
100% Booked

Wing B

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Wing BFeb 2021141010036
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1RK32.62 Sq.mts. ( 351 Sq.ft. )1
None Booked0% Booked
0% Booked
1 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Wing BCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress70% done
70% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
work-in-progress70% done
70% Booked
Overall Percentage of Completion of the work done For the entire Building /Wing
work-in-progress59% done
59% Booked
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
work-in-progress50% done
50% Booked
Sanitary Fittings within the flats / premises
work-in-progress50% done
50% Booked
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress50% done
50% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress50% done
50% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
work-in-progress40% done
40% Booked
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress80% done
80% Booked
Channel Partners
Channel Partners Registered by Developer
Aakaar Tanishq Nirmaan J. V.
for Project
Tanishq Wisteria
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation