Project overview

Swastik Residency is a MahaRERA Registered Project bearing MahaRERA Registration Number P52000026474. Swastik Residency is located at Survey No- 19C1. This is a New being developed by Ramanuj Sidhariram Sharma.

Swastik Residency has 1 BHK & 1RK Apartments with carpet areas ranging from 226 to 405 Sq.ft. Carpet. The Project has total 24 of which 24 are currently available for sale.

Swastik Residency is being developed on a total land area of 3401 Sq.ft. Swastik Residency has 1 Wings / Towers Swastik Residency

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swastik Residency
  • Location:
  • Survey No- 19C1
  • Const. Stage:
    New
  • Possession:
    30 Jun 2023
Developer Details

  • Developer:
    Ramanuj Sidhariram Sharma
  • Phone:
  • Address:
  • Road No - 2
Project RERA Details
MAHA REARA No: P52000026474
Project Type Residential / Group Housing
RERA Project Status New
Architect Engineers Syndicate
Funding Bank BANK OF INDIA
Proposed Possession 30 Jun 2023
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 24 Sep 2020
Last Retrived 28 Jul 2025
Swastik Residency QR Code
Swastik Residency
MahaRERA - P52000026474
Apartment Details & Configuration
TypeArea
1 BHK31.73 Sq.mts. ( 342 Sq.ft. )
1 BHK33.62 Sq.mts. ( 362 Sq.ft. )
1 BHK37.12 Sq.mts. ( 400 Sq.ft. )
1 BHK37.62 Sq.mts. ( 405 Sq.ft. )
1RK20.99 Sq.mts. ( 226 Sq.ft. )
1RK21.82 Sq.mts. ( 235 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swastik Residencylast updated on 28 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
To Be Provided By Promoter
Energy management
Na
Fire Protection And Fire Safety Requirements
Na
Landscaping & Tree Planting
Na
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Only Septic Tank To Be Provided
Solid Waste Management And Disposal
Na
Storm Water Drains
To Be Provided By Promoter
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
To Be Provided By Promoter
Water Supply
To Be Provided By Promoter
Buildings / Wings in Swastik Residency
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swastik Residency by Ramanuj Sidhariram Sharmalast updated on 28 Jul 2025 as per information obtained from MARA RERA.

3401 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 1

Wings / Towers in Project

Apartments Statistics

24 apartments in total
Total
24
Booked
0
Available
24

Saleable Area Statistics (Sq. ft.)

7875 Total
Total
7875
Booked
0
Available
7875
Total 24 apartments in project. 0 apartments booked. 0% apartments booked.
Total 7875 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

Swastik Residency

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
Swastik ResidencyDec 20225101001
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
1 BHK31.73 Sq.mts. ( 342 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK33.62 Sq.mts. ( 362 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.12 Sq.mts. ( 400 Sq.ft. )4
None Booked0% Booked
0% Booked
1 BHK37.62 Sq.mts. ( 405 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK20.99 Sq.mts. ( 226 Sq.ft. )4
None Booked0% Booked
0% Booked
1RK21.82 Sq.mts. ( 235 Sq.ft. )4
None Booked0% Booked
0% Booked
24 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building Swastik ResidencyCompletion
Basement (if any)
Completed 100% done
100% Booked
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress30% done
30% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress20% done
20% Booked
Stilt Floor
Completed 100% done
100% Booked
Channel Partners
Channel Partners Registered by Developer
Ramanuj Sidhariram Sharma
for Project
Swastik Residency
last updated on 28 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation