Project overview

Swastik is a MahaRERA Registered Project bearing MahaRERA Registration Number P51800054494. Swastik is located at 55 /A. This is a New being developed by Reliance Corporation.

Swastik has REHAB 1 BHK & REHAB 1 RK Apartments with carpet areas ranging from 230 to 331 Sq.ft. Carpet. The Project has total 11 of which 11 are currently available for sale.

Swastik is being developed on a total land area of 20133 Sq.ft. Swastik has 4 Wings / Towers A Wing Commercial,B Wing Residential,C Wing Residential,D Wing Residential

ProjectDeveloperLocationPossession
Project Details
  • Project:
    Swastik
  • Location:
  • 55 /A
  • Const. Stage:
    New
  • Possession:
    30 Sep 2026
Developer Details

  • Developer:
    Reliance Corporation
  • Phone:
  • Address:
  • Senate, Aura Biplex
Project RERA Details
MAHA REARA No: P51800054494
Project Type Others
RERA Project Status New
Architect A R Mehta & Associates
Funding Bank ICICI BANK LIMITED
Proposed Possession 30 Sep 2026
Revised Possession
Extended Possession
Litigations No Litigations
Last Modified 20 Jul 2024
Last Retrived 26 Jul 2025
Swastik QR Code
Swastik
MahaRERA - P51800054494
Apartment Details & Configuration
TypeArea
COMMERCIAL83.14 Sq.mts. ( 895 Sq.ft. )
COMMERCIAL104.33 Sq.mts. ( 1123 Sq.ft. )
OWNER 2 BHK56.1 Sq.mts. ( 604 Sq.ft. )
OWNER 2 BHK56.2 Sq.mts. ( 605 Sq.ft. )
REHAB 1 BHK30.54 Sq.mts. ( 329 Sq.ft. )
REHAB 1 BHK30.76 Sq.mts. ( 331 Sq.ft. )
SALE 1 BHK47.13 Sq.mts. ( 507 Sq.ft. )
REHAB 1 BHK24.35 Sq.mts. ( 262 Sq.ft. )
REHAB 1 RK21.33 Sq.mts. ( 230 Sq.ft. )
Facilities & Amenities
Facilities, Amenities & Common areas details of Swastiklast updated on 26 Jul 2025 as per information obtained from MARA RERA.
Project Facilities & Amenities Available Details
Aggregate area of recreational Open Space
Na
Community Buildings
Na
Electrical Meter Room, Sub-Station, Receiving Station
Wip
Energy management
Na
Fire Protection And Fire Safety Requirements
Wip
Landscaping & Tree Planting
Wip
Open Parking
Na
Sewerage (Chamber, Lines, Septic Tank , STP)
Wip
Solid Waste Management And Disposal
Na
Storm Water Drains
Wip
Street Lighting
Na
Treatment And Disposal Of Sewage And Sullage Water
Na
Water Conservation, Rain water Harvesting
Wip
Water Supply
Wip
Buildings / Wings in Swastik
Apartments Statistics, Saleable Area Statistics and available inventory snapshot of Swastik by Reliance Corporationlast updated on 26 Jul 2025 as per information obtained from MARA RERA.

20133 Sq. ft.

Project Area

0 Sq. ft.

Recreational Open Space

Total 4

Wings / Towers in Project

Apartments Statistics

11 apartments in total
Total
11
Booked
0
Available
11

Saleable Area Statistics (Sq. ft.)

5479 Total
Total
5479
Booked
0
Available
5479
Total 11 apartments in project. 0 apartments booked. 0% apartments booked.
Total 5479 Sq.ft. saleable area. 0 saleable area booked.
0% area booked.

A Wing Commercial

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
A Wing CommercialSep 202611010088
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
COMMERCIAL83.14 Sq.mts. ( 895 Sq.ft. )1
None Booked0% Booked
0% Booked
COMMERCIAL104.33 Sq.mts. ( 1123 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building A Wing CommercialCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

B Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
B Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
OWNER 2 BHK56.1 Sq.mts. ( 604 Sq.ft. )1
None Booked0% Booked
0% Booked
OWNER 2 BHK56.2 Sq.mts. ( 605 Sq.ft. )1
None Booked0% Booked
0% Booked
2 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building B Wing ResidentialCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress40% done
40% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
work-in-progress60% done
60% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
work-in-progress80% done
80% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
work-in-progress80% done
80% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

C Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
C Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB 1 BHK30.54 Sq.mts. ( 329 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB 1 BHK30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
SALE 1 BHK47.13 Sq.mts. ( 507 Sq.ft. )1
None Booked0% Booked
0% Booked
3 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building C Wing ResidentialCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked

D Wing Residential

WingProposed Date of CompletionNumber of SlabsPlinthBasement'sStiltsPodium'sOpen ParkingsClosed Parkings
D Wing ResidentialSep 20261000000
Apartment TypeCarpet AreaNumber of ApartmentsBooked Apartments
REHAB 1 BHK24.35 Sq.mts. ( 262 Sq.ft. )2
None Booked0% Booked
0% Booked
REHAB 1 BHK30.76 Sq.mts. ( 331 Sq.ft. )1
None Booked0% Booked
0% Booked
REHAB 1 RK21.33 Sq.mts. ( 230 Sq.ft. )1
None Booked0% Booked
0% Booked
4 total apartments / 0 apartments booked. 0% apartments booked.
Work Description in Building D Wing ResidentialCompletion
Basement (if any)
Excavation
Completed 100% done
100% Booked
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.
work-in-progress80% done
80% Booked
Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises
Completed 100% done
100% Booked
Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
Plinth
Completed 100% done
100% Booked
Podiums (if any)
Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises
Sanitary Fittings within the flats / premises
Slabs of Super Structure
Completed 100% done
100% Booked
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
work-in-progress20% done
20% Booked
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks
Completed 100% done
100% Booked
Stilt Floor
Completed 100% done
100% Booked
The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing
X number of Basement(s) and Plinth
Completed 100% done
100% Booked
X number of Podiums
X number of Slabs of Super Structure
work-in-progress28% done
28% Booked
Channel Partners
Channel Partners Registered by Developer
Reliance Corporation
for Project
Swastik
last updated on 26 Jul 2025 as per information obtained from MARA RERA.
Name Company Location Mobile Designation